Andhra University Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra University Tender
Civil Works Others
Opening Date8 Jan 2021
Closing Date22 Jan 2021
Tender Amount₹ 3,84,940 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
368840Bid Award Id
ViewTender No
UE(1)/E-PTN(7)/AU/VSP/2020-21Tender Authority
Andhra University ViewPurchaser Address
-Website
http://https://www.andhrauniversity.edu.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Leak proof, repairs, face lifting and construction of Compound wall to Hostel Office college of engi;Providing Gyp board false ceiling (GS-MFSC-4.1 as per India gypsum) using with 12.5 mm thick Gyp boards conforming to IS 2095-1982 fixing to Gyp steel (saint gobain) GI perimeter channels of size 20mmx27mm30mm (web00 of 0.5 mm thick along the perimeter of the ceiling fixing with screws at 610 mm c/c and intermediate channels 945 mmx15mmx0.90mm) and ceiling angles (25mmx10mmx0.50mm) fixing with GI cleat and steel expansion fasteners and connecting clips to the ceiling channels and fixing 12.5 mm tapered edge Gyp board (Saint Gobain) with 25 mm dry wall screws (Saint Gobain) at 230mm c/c and jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered and square edges with jointing compound etc., complete as directed . APDSS No 817
23.5
-
23016
... More
Leak proof, repairs, face lifting and construction of Compound wall to Hostel Office college of engi;Providing gyp board boarder using 12.5 mm thick GYP boards and fixing to ceilings etc complete as directed
20
-
2000
... More
Leak proof, repairs, face lifting and construction of Compound wall to Hostel Office college of engi;Plastic emulsion Painting to walls and ceilings etc with two coats over one coat of cement primer paint and two coats of putty of approved brand and shade to interior and exterior surfaces to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materiel, including cost and conveyance of all materials to work site and all operational, incidental ,labour charges etc complete for finished items of work as per SS 912 etc complete as directed.
125
-
49187
... More
Leak proof, repairs, face lifting and construction of Compound wall to Hostel Office college of engi;Plastic emulsion Painting to walls and ceilings etc with one coat of approved brand and shade to interior and exterior surfaces to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materiel, including cost and conveyance of all materials to work site and all operational, incidental ,labour charges etc complete for finished items of work as per SS 912 etc complete as directed.
410
-
27090
... More
Leak proof, repairs, face lifting and construction of Compound wall to Hostel Office college of engi;Providing impervious coat to exposed RCC slab surfaces to required slopes with CM(1:3)prop 20 mm thick(average) mixing with water proof compound from reputed manufactures as approved by the engineer at 1 kg for one bag of cement laid over roof slab finished smooth with a floating coat of neat cement and thread lining at regular intervals at 45cmx45cm including cost and conveyance of materials like cement, sand(screened)water proofing compound etc to site cost of seigniorage and all other taxes on all materials and operational ,incidental and labour charges for mixing mortar ,laying ,lifting, rendering smooth and thread lining ,cutting including rounding off junctions of wall and slab etc complete for finished item of work (APSS No.901&903) etc complete as directed over ground floor slab.
240
-
119363
... More
Leak proof, repairs, face lifting and construction of Compound wall to Hostel Office college of engi;Earth work excavation for foundations and depositing on bank for all lift and with an initial lead of 10 m including all operational, incidental, labour charges such as shorting, sheeting, planking, structures, etc.., complete for finished item of work including seignior age excluding dewatering charges etc as per SS-20 B (APDSS 308).
11.5
-
2797
... More
Leak proof, repairs, face lifting and construction of Compound wall to Hostel Office college of engi;Cement concrete (1:5:10) mix using 40 mm size hard granite machine crushed metal , machine mixing of concrete ,placing in position , curing etc complete as directed. APDSS 402
2.6
-
9557
... More
Leak proof, repairs, face lifting and construction of Compound wall to Hostel Office college of engi;Random rubble masonry in Cement mortar (1:6) using rough stone with necessary bond stones etc for foundations and basements etc complete as directed
12.15
-
45777
... More
Leak proof, repairs, face lifting and construction of Compound wall to Hostel Office college of engi;Fly ash brick Masonry work in CM (1:6) prop, with fly ash cement solid blocks of size 290 X 225 X 140 mm for manufacturing of fly ash solid blocks using fly ash 80kgs, cement 15 kgs , gypsum 5 kgs. and stone dust including cost and conveyance of all materials, lab our charges, seignior age charges, scaffolding and curing etc.., complete with a compressive strength not less then 50kg/sqcm for walls for superstructure walls etc complete as directed in ground floor APDSS 501,504
15
-
102090
... More
Leak proof, repairs, face lifting and construction of Compound wall to Hostel Office college of engi;Plastering with cement mortar (1:5) 12 mm thick for vertical surfaces etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge APDSS 903
150
-
52557
... More
Leak proof, repairs, face lifting and construction of Compound wall to Hostel Office college of engi;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials.
150
-
6777
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements