Andhra University Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra University Tender

Civil And Construction
Civil Works Others
Opening Date9 Jun 2022
Closing Date16 Jun 2022
Tender Amount₹ 14,37,027 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of compound wall at research and development laboratories;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) for Column Footing

4

-

35714

... More
Construction of compound wall at research and development laboratories;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished (APSS No. 402 & 403) item of work columns for ground floor

5

-

61817

... More
Construction of compound wall at research and development laboratories;Fly ash brick Masonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using second class traditional bricks of size 290x225x140 cm from approved quarry and having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including Seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). for wall GF

40

-

273655

... More
Construction of compound wall at research and development laboratories;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work for plinth beams etc complete as directed. (APSS No. 402 & 403)

1.5

-

17394

... More
Construction of compound wall at research and development laboratories;Supplying, fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage, where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work .APSSNo 403 for GF

1000

-

66590

... More
Construction of compound wall at research and development laboratories;Plastering with cement mortar (1:5) 12 mm thick in Ground floor for masonry works including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labor charges for mixing mortar, finishing ,curing as directed by the engineer APDSS No.901&903

1200

-

453852

... More
Construction of compound wall at research and development laboratories;Supply and fixing in position m.s grill gate etc at 35kg per m2 with tube angle etc including fabrication,cost of wlding rods,power charges and fixing in position by screws to the frames etc complete.

30

-

128369

... More
Construction of compound wall at research and development laboratories;Structual steel fabrication using ms box section of Tata/Sail including all materials transport fabrication and labour charges make etc complete.

3010

-

368063

... More
Construction of compound wall at research and development laboratories;Painting with plastic emulsion paint of grade-1 standard make to exterior faces of new walls two coat of approved make shade and color over primer coat with cement primer grade - I including cost and conveyance of materials like Plastic Emulsion paint, white cement to site including cost of brushes, scaffolding charges, lift charges and labor charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion etc., complete for finished item of work (APSS No.910, 911&1201) in all floors.

1000

-

203840

... More
Construction of compound wall at research and development laboratories;Providing Enamel Painting two coats over base coat of primer paint with best quality of paints To New iron works etc complete APSS No 1201,1202

180

-

34260

... More
Construction of compound wall at research and development laboratories;Providing Texture Design of approved pattern with two coats of putty and two coats of plastic emulsion over base coat of primer etc complete as directed.

140

-

95741



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.