Andhra University Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra University Tender
Building Construction
Opening Date2 Aug 2021
Closing Date9 Aug 2021
Tender Amount₹ 1,43,91,114 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 3,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
427222Bid Award Id
ViewTender No
UE/E-PTN(2)/AU/VSP/2021-22Tender Authority
Andhra University ViewPurchaser Address
-Website
http://https://www.andhrauniversity.edu.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding pipes,Jacks prpos,steel centring plates etc for unsupporetd height 3.66M.shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Sunshades (Wodden Centring )
365
-
404030
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding pipes,Jacks prpos,steel centring plates etc for unsupporetd height 3.66M.shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For 12.5cm thick Slab (Wodden Centring )
1190
-
1505314
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding pipes,Jacks prpos,steel centring plates etc for unsupporetd height 3.66M.shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For 18cm thick Slab (Wodden Centring )
35
-
54330
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Plastering 12mm thick in single coat in CM(1:3) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for Horzintal plastering
1450
-
665075
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Plastering 12mm thick in single coat in CM(1:3) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for vertical Surfaces plastering
50
-
21706
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Brick masonry 290x225x140mm thick for panel walls in superstructure with CM (1:6) prop. (cement : sand) using fly ash lime solid blocks from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and all operational, incidental and labour charges such as mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work (APSS No. 501 & 504).
300
-
2200902
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Brick masonry 23x11x7cm thick for panel walls in superstructure with CM (1:6) prop. (cement : sand) using fly ash lime solid blocks from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and all operational, incidental and labour charges such as mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work (APSS No. 501 & 504).
20
-
152355
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Plastering 12mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for internal plastering
3800
-
1600640
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. 20mm thick (average) mixing with water proofing compound from reputed manufacturers as approved by Engineer-in- charge at 1 Kg/bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost and conveyance of materials like cement, sand (screened), water proofing compound etc., to site, cost of seigniorage charges and all other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work (APSS No. 901 & 903)
1190
-
640906
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Flooring with vitrified polished floor tiles of 1st quality Doble charged /multi charged stain free body porecialin make as approved by Engineer-in-charge of size 600 mm x 600 mm , 8mm to 10mm thick , normal colour with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of seigniorage charges on all materials, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc., complete for finished item of work. (APSS No.701 & 707)
1130
-
1246357
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Flooring with ceramic tiles 7.30mm thick , 1st quality and of size 300x300mm as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707)
85
-
88693
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Providing dadooing to walls with glazed coloured tiles 1st quality of size 600x300mm approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges etc., complete for finished item of work. of Size 300x600mm.
275
-
344207
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Providing Jet block Grinte16to 18mm thick 2.40m Length over base plasteing in cm(1:5) mix 20mm thick with half round the edges with necessary colour pigments etc complete as directed by the department
45
-
175286
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Supplying , fitting and placing cutting HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work
23000
-
1523750
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Brick masonry23x11x7cm thick with CM (1:8) prop. (cement : sand) using fly ash lime solid blocks from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and all operational, incidental and labour charges such as mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work (APSS No. 501 & 504).
15
-
76414
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Providing cement concrete (1:2:4) mix using 12mm Hbg metal mixing placing compacting curing etc complete as directd by the department in Second t floor
6.5
-
34277
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding pipes,Jacks prpos,steel centring plates etc for unsupporetd height 3.66M.shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Columns (Wodden Centring )
3.5
-
46928
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding pipes,Jacks prpos,steel centring plates etc for unsupporetd height 3.66M.shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Lintels (Wooden Centring )
0.15
-
1965
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding pipes,Jacks prpos,steel centring plates etc for unsupporetd height 3.66M.shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Sunshades(Wooden Centring )
2.25
-
2612
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Brick masonry 290x225x140mm thick for panel walls in superstructure with CM (1:6) prop. (cement : sand) using fly ash lime solid blocks from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and all operational, incidental and labour charges such as mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work (APSS No. 501 & 504).
80
-
673938
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Plastering 12mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for internal plastering
800
-
328977
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Plain Cement Concrete (1:3:6) prop: nominal mix (Cement: fine aggregate: coarse aggregate) using 20mm size (SS5) graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate and coarse aggregate, water etc., to site, cost of seigniorage charges and all other taxes on all materials including centering, shuttering, laying concrete in position, curing etc., complete.
12
-
114361
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Supplying , fitting and placing cutting HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work
3000
-
203730
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Providing and fixing of door frames factory made, internal door frames without threshold, fabricated from pre painted cold roll formed section 100 mm x 60 mm made of galvanized (base steel as per IS-513 ?D? quality galvanizedas per IS-277 with Zinc of 120 Gms/sqm) steel colour coated sections with total coated thickness of 1 mm primer coatedwith epoxy primer of 5-7 microns thick finish painted withpolyester paint of 12-16 microns and back coated with alkyd backer of 5-7 microns, the frame section filled withpolyurethane (PU Foam) of 40 kg/Cu.m and the sections cut to length and mitre joined by means of 1.25 mm thick CRCAelectroplated corner brackets of size 75 x 75 mm and 1.25 mm thick electroplated stiffeners of size 150 mm for fixing hold fasts and hinges with MS Powder coated fittings a) 6Nos M.S. Z Type hold fasts made of 30 mm x 3 mm MS flatof 230 mm long, 3 Nos each size expandable PVC covered with Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping): 35 mmthick conforming to IS:2202
88.2
-
410974
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Providing & Fixing of Openable Windows with Fly-mesh made of pre-painted steel (Base Steel as per IS 513 of 0.58 mm thick galvanized as per IS 277 with zinc of 150 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion sections with rebate for glazed shutters, fly mesh and a 20 mm provision for guard bars/grills and fly mesh shutter section of 20 x 40 mm and the sections cut to length metre joined with corner bracket, centre mullions fixed with mullion cap, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and panelled with 5mm thick pinheaded glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber gaskets including fixing the windows in the concrete/masonry wall by means of self expanding screws, including 10mm Square guard bars with 6? (152.4mm) pitch , complete for finished item of workCentre fixed both side openable shutter window 5?0?x4?0? (1524mm x1219.2mm). Outer frame section size of 72x50mm. Shutter frame section size of 48 x 25 mm. Mullion section size of 72x50mm. Fixed beading section size of 12 x 12 mm.
69
-
519363
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Supply and fixing the PVC Door with frame and shutter with necessary loking arrngements etc complte as directed by the department
36
-
117154
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Supply and fixing the M.S Ornamental grills using MS flat 20x5mm thick allround 10mm square bars as per design using 16kg/sqm including all fabrication labour transport complte as directed by the department
40
-
66446
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Providing stainless steel handrailing with 316 grade 16 guage 50mm top hand rail ,40mm dia vertical support and 25mm dia horzintal two lines as per the approved pattern and design as directed by the site Engineers for hand railing of 914mm (36") height above the finished for level including cost of materials and convencey to site vat txes and labour charges for all opertations etc as per such as fabrication of hand rail drilling of holes in R.c.c steps and finishing of handrail leg reconnection etc complete for finsihed item of work .The SS steel of 316 grade with lab test certificate shoud be prodieded as directed by the department
14
-
50400
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3 1981with"P" or "S" trap: 580 mm x 440 mm With flush tank 10 Liters capacity and with nylon connection angle cock etc completet including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.
8
-
25083
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Supplying & Fixing European water closet white glazed W.C 1st quality ISI marked with flush tank 10 Liters capacity,lid and seat cover with nylon connection angle cock etc completet including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.
2
-
8783
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Supplying & Fixing Indian makeFlat Back Wash Hand Basin1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain,32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock
15
-
28863
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Supply and fixing the long Body taps approoved make etc complete as directed by the department
26
-
9100
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Supply and fixing the long body showers approved make and quality etc
10
-
6376
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S & F 19.04mm dia& 609.6 mm long aluminium anodized towel rod with brackets and aluminium screws
10
-
3875
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S & F NP soap dish heavy type with NP SCREWS
10
-
2811
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Supplying and fixing of SWR PVC 110 mm dia pipes (Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)
200
-
56730
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Supplying and fixing of SWR PVC75 mm dia pipes (Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)
60
-
13111
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S&F 75 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings
20
-
955
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S&F75 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings
30
-
1943
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S&F110 mm dia - Single Tee with Door - UPVC/SWR Pipe fittings
20
-
2500
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S&F110 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings
20
-
1591
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S&F110 mm dia - Single Tee - UPVC/SWR Pipe fittings
20
-
2068
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S&F75 mm dia - Single 'Y' - UPVC/SWR Pipe fittings
20
-
1432
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S&F110 mm dia - Single 'Y' - UPVC/SWR Pipe fittings
10
-
1307
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S&F4" (101.6 mm ) Nahany Trap ( without inlet with out Jali)UPVC/SWR Pipe fittings
35
-
3301
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S&F110 mm dia - Vent Cowl - UPVC/SWR Pipe fittings
2
-
37
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S&F75 mm dia - Vent Cowl - UPVC/SWR Pipe fittings
2
-
28
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S& F40 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete
80
-
38048
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S& F50 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete
100
-
52581
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S& 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete
100
-
22200
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 40 mm NB Size
12
-
29747
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type -50 mm NB Size
8
-
29004
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Providing & Placing on Terrace(at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks
10000
-
61400
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Providing Brick masonry seat for Orissa pan/ Indian W.C. using 2nd class bricks as per standard practice
10
-
2200
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Supply and fixing the red brick jalies 50mm wide approved make and design etc complete as directed by the department
20
-
21000
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S& F GIunion50.80 mm Ist Quality
20
-
2909
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S& F GIunion38.10 mm Ist Quality
20
-
2341
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;S& F GIunion12.70 mm Ist Quality
25
-
1080
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Supply and fixing of TV Shape mirror with plastic frame size 609.6mmx457.2mm etc
20
-
11325
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Painting with plastic emulsion paint of grade-1 standard make to exterior / interior faces of new walls two coat of approved make shade and colour over primer coat with cement primer grade - I including cost and conveyance of materials like Plastic Emulsion paint, white cement to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion etc., complete for finished item of work (APSS No.910, 911&1201) for External walls
2800
-
537850
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Painting with plastic emulsion paint of grade-1 standard make to exterior / interior faces of new walls two coat of approved make shade and colour over primer coat with cement primer grade - I including cost and conveyance of materials like Plastic Emulsion paint, white cement to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion etc., complete for finished item of work (APSS No.910, 911&1201) for Internal walls
2800
-
517799
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Providing Enamel paint two coats approved brand and shade over base coat of zinc chromite etc complete as directed by the department
55
-
9856
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Dismantiling the Reinforced cement concrete and clearing the materials etc complete as directed by the department
15
-
43291
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Dismantiling the brick masonary and clearing the materials etc complete as directed by the department
35
-
8418
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Remove and refixing the G.I Sheet inculuding the all materials labour etc complete as directed by the Engineer Incharge and stacking the materials and reuse.
58
-
5017
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Remove and refixing the M.S.Box Sections inculuding the all materials labour etc complete as directed by the Engineer Incharge and stacking the materials and reuse.
365
-
6096
... More
Proposed construction of second floor over the existing first floor of girls hostel in north campus,;Plastering 12mm thick in CM(1:3) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for internal plastering
120
-
41934
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements