To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra University Tender
Opening Date16 Nov 2021
Closing Date23 Nov 2021
Tender Amount₹ 5,82,519 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
454049Bid Award Id
ViewTender No
UE/E-PTN(4)/AU/VSP/2021-22Tender Authority
Andhra University ViewPurchaser Address
-Website
http://https://www.andhrauniversity.edu.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Filling in foundations and basements with excavated earth in 15cm thick layers well watering, ramming ,consolidation etc complete as directed by Engineer Incharge .
13
-
497
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Filling in foundations and basements with borrowed earth in 15cm thick layers well watering, ramming ,consolidation etc complete as directed by Engineer Incharge .
35
-
17622
... More
Construction of building for shops at Shivajipalem hostel block A.U.;providing pre construction Anti termite treatment by applying and injecting to wall trenches, botttom of excavation foundations, vertical walls,top surface of plinth filling wall and floor junctions, joints, conduits and external perimeter of the building using chlorophyriphos 20% EC lindone-20% EC @1:19 ratio with hand operated pressure pump at applicable area as per the site conditions in various stages as per IS 6313-2003 part II , including all costs and conveyance for providing three stage pest control treatment etc complete as directed.
42
-
7159
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Plain Cement Concrete (1:4:8)) proportion nominal mix (cement: fine aggregate: Coarse aggregate) 10cm thick for bed concrete using 40mm size (SS5) hard,machine crushed granite metal from approved quarry including cost and conveyance of all materials like cement, sand, & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402)
36
-
14303
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Vibrated Reinforced Cement Concrete (1:1 1/2:3) for plinth beams as per Table 9 of IS 456 using 20mm,12mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including wood centering and scaffolding with wood post and bamboo as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete for finished item of work (APSS No. 402 & 403)
2.4
-
27831
... More
Construction of building for shops at Shivajipalem hostel block A.U.;BrickMasonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size 290mm X 225mm X 140mm and having minimum crushing strength of 50 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials like cement, sand, fly ash solid blocks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).
20
-
141607
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Vibrated Reinforced Cement Concrete (1:1 1/2:3) Mix for lintels as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including wood centering, shuttering and scaffolding with wood posts as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403)
0.65
-
7306
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Vibrated Reinforced Cement Concrete (1:1 1/2:3) Mix for sunshades of average 6 cm thick as per Table 9 of IS 456 using 20mm ,12mmsize (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry@ 60% and 40% respectively , including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including wood centering, shuttering and scaffolding with wood posts as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403)
6
-
6154
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Vibrated Reinforced Cement Concrete (1:1 1/2:3) Mix for beams as per Table 9 of IS 456 using 20mm size and 12mm (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including wood centering, shuttering and scaffolding with wood posts as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403)
1.9
-
18738
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Vibrated Reinforced Cement Concrete (1:1 1/2:3) Mix for 10 cm thick slab as per Table 9 of IS 456 using 20mm and 12mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including wood centering, shuttering and scaffolding with wood posts as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403)
51
-
52964
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Plastering 12 mm thick in CM(1:3) for RCC surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903)
72
-
29134
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Plastering 12mm thick in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903)
195
-
73751
... More
Construction of building for shops at Shivajipalem hostel block A.U.;supplying and fixingin position powder coated alluminium glazed sliding windows using 2mm thickzindal sections with necessary locking arrangements etc
6.2
-
19840
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Supply and fixing of Rolling shutter made of 80x1.25mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside and outside locking with push-pull operations including cost of hood cover and springscomplete, painted with one coat of approved steel primer, locks, ball bearings, all acessories, etc complete for finished item of work as per specification 1108.
13.5
-
49051
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Supplying and fixing in position M.S ornamental grills to windows using not less than 16 kgs of steel per M2 area of grill work as per the approved design etc., complete as directed.
6.2
-
10060
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Providing granolithic concrete flooring 20mm thick with (1:1:2) mix using 6 to12mm size HBG metal laid over CC bed aleready laid , in alternate panels of size 1.50x1.50m and finishing the top surface to required smoothness etc.
38
-
15866
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Painting with plastic emulsion paint of grade-1 standard make to interior faces of new walls two coat of approved make shade and colour over primer coat with cement primer grade - I over two coats including cost and conveyance of materials like Plastic Emulsion paint, white cement primer to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion,primer, etc., complete for finished item of work (APSS No.910, 911&1201) in all floors.
140
-
28532
... More
Construction of building for shops at Shivajipalem hostel block A.U.;providing white cement two coats of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt including cost of all materials, labour charges, complete using birla white cement etc
140
-
6769
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Providing painting two coats of synthetic Enamel Paint 1st grade of approved brand and shade over base coat of primer including cost and conveyance of all materials to site like cost of primer, enamel paint ,including cost of brushes and all labour charges etc complete as directed
40
-
7614
... More
Construction of building for shops at Shivajipalem hostel block A.U.;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work
1000
-
66590