To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra University Tender

Opening Date16 Dec 2021
Closing Date30 Dec 2021
Tender Amount₹ 2,29,18,892 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹53,500/MT*
Andhra Pradesh

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Removing of purlins of 100*50*3.2 & 80*40*2.9 mm MS box sections with necessary labour charges etc complete.

500

-

8350

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for COLUMNS as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in third floor

44

-

620695

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for LINTELS as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in third floor

10

-

136952

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for SUNSHADES as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in third floor

35

-

47701

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for BEAMS as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in third floor

73

-

921615

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for 12.5 cm thick slab as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in third floor

640

-

962308

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for 15 cm thick slab as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in third floor

545

-

905587

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for 20cm thick slab as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in third floor

60

-

119341

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing Fly ash BrickMasonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size 290mm X 225mm X 140mm and having minimum crushing strength of 50 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials like cement, sand, fly ash solid blocks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504)in third floor. 23 cm width walls

110

-

923673

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing Fly ash BrickMasonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size 290mm X 225mm X 140mm and having minimum crushing strength of 50 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials like cement, sand, fly ash solid blocks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504)in third floor 15 cm thick width walls

12

-

110542

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work

35

-

2376929

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position of TEAKWOOD FLUSH DOORS with 35 mm thick flush shutters,solid bond wood block board type with teak ply on both faces :35mm thick conforming to IS:2202 with necessary 100*75 mm scantlings for frames and lipping alround with teak wood reaper and fixed the frame into the masonry with Z hold fasts MS Z hold fasts -300 mm long of 40*40*5mm ISABMSW-69 with necessary screws not less than 50mm length with necessary aluminium furniture 125mm hinges 300*16mm aldrop ,handles 100mm,locking arrangements wind appliances etc and fixing the frame into masonry with M30 concrete for finished work as directed. APSS No 1001,1002 in Third floor

30

-

203288

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and Fixing of Aluminium Powder coated 3 track Domal Sliding Windows with outer frame 80 mmx45mmx1.5 mm thick and shutter frame 65 mmx27mmx1.5mm thick and inter lock 27 mmx37mmx1.5mm thick and 5 mm thick plain glass fixing with EPDM robber beading and using necessary hardware and locking arrangement including cost and conveyance of the material and fixing the window in the walls by means of forch screws etc complete.

90

-

436680

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position M.S ornamental grills to windows using not less than 16 kgs of steel per M2 area of grill work as per the approved design etc., complete as directed in third floor.

60

-

99669

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Plastering 12mm thick in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) in third floor

1300

-

593632

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Plastering 12mm thick in CM(1:3) for ceiling including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) in third floor.

1400

-

657342

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;providing vitrified tiles flooringFlooring with Vertified Tiles of size 600mm x600mm, 1st quality khajaria/rak as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707) in third floor.

1170

-

1613636

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing dadooing to walls with glazed coloured tiles 1st quality of size 450 mmx300 mm approved by Engineer-in-Charge set over base coat of CM(1:5) 20 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including Seigniorage charges etc., complete for finished item of work in third floor.

180

-

186964

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing painting two coats of synthetic Enamel Paint 1st grade of approved brand and shade over base coat of primer including cost and conveyance of all materials to site like cost of primer, enamel paint ,including cost of brushes and all labour charges etc complete as directed for new wood work APSS No 1201,1202 in third floor

68

-

12616

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing painting two coats of synthetic Enamel Paint 1st grade of approved brand and shade over base coat of primer including cost and conveyance of all materials to site like cost of primer, enamel paint ,including cost of brushes and all labour charges etc complete as directed for new iron work APSS No 1201,1202 in third floor.

60

-

10752

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing High polished black granite planks flooring 16 to 18 mm thick upto 2.4 m length set over base coat of cement mortar (1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work For third Floor . (APSS NO . 701 & 707)

85

-

258461

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Painting with plastic emulsion paint of grade-1 standard make to interior faces of new walls two coat of approved make shade and colour over primer coat with cement primer grade -1 including cost and conveyance of materials like Plastic Emulsion paint, white cement primer, to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion,primer,etc., complete for finished item of work (APSS No.910, 911&1201) in third floor.

3200

-

591773

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing stainless steel hand railing with 316 Grade, 16 guage , 50 mm for top hand rail, 40mm die vertical support and 25mm dia Horizonral two lines as per the approved pattern and design as directed by the site Engineers for hand railing of 914mm(36") hieght above the finished floor level including cost of materials and conveyance to site, VAT Taxes and labour charges for all oprations etc., complete as per wuch as fabrication of hand railing drilling of holes in R.C.C Steps and finising of Handrailing leg reconnection etc., complete for finished item of work. The SS steel of 316 grade with lab test certificate should be prodiced as directed by the department

30

-

108000

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for COLUMNS as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in fourth floor

15

-

222110

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for LINTELS as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in fourth floor

5

-

71454

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for SUNSHADES as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in fourth floor

35

-

49865

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for BEAMS as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in fourth floor

25

-

327729

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for 12.5 cm thick slab as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in fourth floor

140

-

218368

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for 15 cm thick slab as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in Fourth floor

260

-

447809

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for 20cm thick slab as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in Fourth floor

32

-

65817

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing Fly ash BrickMasonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size 290mm X 225mm X 140mm and having minimum crushing strength of50 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials like cement, sand, fly ash solid blocks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504)in Fourth floor.

120

-

1071278

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing Fly ash BrickMasonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size 290mm X 225mm X 140mm and having minimum crushing strength of50 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials like cement, sand, fly ash solid blocks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504)in Fourth floor.15 cm thick width

12

-

118673

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work in fourth floor.

16

-

1113191

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position of TEAKWOOD FLUSH DOORS with 35 mm thick flush shutters,solid bond wood block board type with teak ply on both faces :35mm thick conforming to IS:2202 with necessary 100*75 mm scantlings for frames and lipping alround with teak wood reaper and fixed the frame into the masonry with Z hold fasts MS Z hold fasts -300 mm long of 40*40*5mm ISABMSW-69 with necessary screws not less than 50mm length with necessary aluminium furniture 125mm hinges 300*16mm aldrop ,handles 100mm,locking arrangements wind appliances etc and fixing the frame into masonry with M30 concrete for finished work as directed. APSS No 1001,1002 in Fourth floor

15

-

101644

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and Fixing of Aluminium Powder coated 3 track Domal Sliding Windows with outer frame 80 mmx45mmx1.5 mm thick and shutter frame 65 mmx27mmx1.5mm thick and inter lock 27 mmx37mmx1.5mm thick and 5 mm thick plain glass fixing with EPDM robber beading and using necessary hardware and locking arrangement including cost and conveyance of the material and fixing the window in the walls by means of forch screws etc complete.

30

-

145560

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position M.S ornamental grills to windows using not less than 16 kgs of steel per M2 area of grill work as per the approved design etc., complete as directed in Fourth floor

30

-

49835

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Plastering 12mm thick in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) in Fourth floor

900

-

442854

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Plastering 12mm thick in CM(1:3) for ceiling including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) in fourth floor.

660

-

333267

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;providing vitrified tiles flooringFlooring with Vertified Tiles of size 600mm x600mm, 1st quality Khajaria/Rak as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707) in Fourth floor.

450

-

641362

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing dadooing to walls with glazed coloured tiles 1st quality of size 450mm x300 mm approved by Engineer-in-Charge set over base coat of CM(1:5) 20 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including Seigniorage charges etc., complete for finished item of work in Fourth floor.

180

-

195257

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing painting two coats of synthetic Enamel Paint 1st grade of approved brand and shade over base coat of primer including cost and conveyance of all materials to site like cost of primer, enamel paint ,including cost of brushes and all labour charges etc complete as directed New wood works etc complete APSS No 1201,1202 in Fourth floor

30

-

5566

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing painting two coats of synthetic Enamel Paint 1st grade of approved brand and shade over base coat of primer including cost and conveyance of all materials to site like cost of primer, enamel paint ,including cost of brushes and all labour charges etc complete as directed New Iron works etc complete APSS No 1201,1202 in Fourth floor.

30

-

5376

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing High polished black granite planks flooring 16 to 18 mm thick upto 2.4 m length set over base coat of cement mortar (1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work ForFourth Floor . (APSS NO . 701 & 707)

45

-

138906

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Painting with plastic emulsion paint of grade-1 standard make to interior faces of new walls two coat of approved make shade and colour over primer coat with cement primer grade -1 including cost and conveyance of materials like Plastic Emulsion paint, white cement primer,to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion,primer,etc., complete for finished item of work (APSS No.910, 911&1201) in Fourth floor.

1310

-

242257

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing stainless steel hand railing with 316 Grade, 16 guage , 50 mm for top hand rail, 40mm die vertical support and 25mm dia Horizonral two lines as per the approved pattern and design as directed by the site Engineers for hand railing of 914mm(36") hieght above the finished floor level including cost of materials and conveyance to site, VAT Taxes and labour charges for all oprations etc., complete as per wuch as fabrication of hand railing drilling of holes in R.C.C Steps and finising of Handrailing leg reconnection etc., complete for finished item of work. The SS steel of 316 grade with lab test certificate should be prodiced as directed by the department

12

-

43200

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. 20mm thick (average) mixing with water proofing compound from reputed manufacturers as approved by Engineer-in- charge at 1 Kg/bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost and conveyance of materials like cement, sand (screened), water proofing compound etc., to site, cost of Seigniorage charges and all other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work (APSS No. 901 & 903) in Fifth floor

750

-

496714

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;VRCC 1:3:6) as per table of IS 456 using 12and 20 mm size (SS5) hard granit machine crushed meatl including cost and conveince of all material etc to site of work for column encasement of column in fourth floor etc complete as directed APDSS403.

4

-

53166

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing Fly ash BrickMasonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size 290mm X 225mm X 140mm and having minimum crushing strength of 75 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials like cement, sand, fly ash solid blocks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504)in fifth floor.

37

-

349937

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Plastering 12mm thick in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) in Fifth floor

310

-

163519

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Painting with plastic emulsion paint of grade-1 standard make to interior faces of new walls two coat of approved make shade and colour over primer coat with cement primer grade -1 including cost and conveyance of materials like Plastic Emulsion paint, white cement primer, to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion,primer,etc., complete for finished item of work (APSS No.910, 911&1201) in Fifth floor.

310

-

59548

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. 20mm thick (average) mixing with water proofing compound from reputed manufacturers as approved by Engineer-in- charge at 1 Kg/bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost and conveyance of materials like cement, sand (screened), water proofing compound etc., to site, cost of Seigniorage charges and all other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work (APSS No. 901 & 903) in Fifth floor

400

-

264914

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for 12.5 cm thick slab as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in fifth floor

45

-

72789

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Vibrated Reinforced Cement Concrete M-30 Design Mix for 15 cm thick slab as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) in Fifth floor.

15

-

26770

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work

650

-

46300

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing and fixing factory made polyvinyl chloride (PVC) Door of sintex make with Frame of the size 50 x 47mm with a wall thickness of 5mm, made out of extruded 10 mm rigid PVC foam sheet, mitre cut at two corners and joined with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be fixed to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A minimum of 4nos. of screws to be provided for each vertical member & minimum 2nos. for horizontal member etc. complete as per manufacturers specification and direction of Engineer-in- Charge for finished item of work. Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail &bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item of work

25

-

93936

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing of white glazed European type Water Closet first quality conforming to IS 2556-part-2-1973 of Hindustan /Neycer/ Parryware make with p trap and best quality Indian make plastic buffers as per IS 2548-1996 etc including pvc low level system parryware slim line flush tank of 8ltrs capacity with all necessary internal components such as short bend ,nylon connection,Angle cock etc complete as directed.

15

-

66687

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing of white glazed Wash Hand Basin(550x450mm) first quality conforming to IS 2556-part-2-1973 of Hindustan/ Neycer/ Parryware make with pillar cock of Jaquar make quarter turn series chrome finish with 7 yrs warranty and 12.7 mm pvc connection with brass union and nut cp coated with 19.05 mm NP stop cock Indian make with ISI mark 400gms etc complete as directed.

8

-

15394

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing of white glazed flat back Urinals of size (440x265x315mm) with internal flushing rim fixed with screws Indian make first quality conforming to IS 2556-1995 of Hindustan/Neycer/Parryware and 12.7 mm pvc connection with brass union and nut cp coated with 19.05 mm NP stop cock Indian make with ISI mark 400gms etc complete as directed.

10

-

27675

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing of White Glazed ceramic Urinal Partition 510x 400 mmIndian make HSW/Neycer/Parryware etc complete as directed.

10

-

22500

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position Bib cock long body) of Jaquar florentine quarter turn series chrome finish with 7yrs warranty etc complete as directed.

15

-

9323

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position of 110mmx75mm dia Nahany trap with Jali of ISI mark with necessary gum ,solution etc complete as directed.

30

-

4159

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying,laying,jointing and testing of 110mm dia pvc pipe line of Prince/Sudhakar make with necessary gum and clamps at every 1m interval etc complete as directed.

180

-

54126

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying,laying,jointing and testing of 75 mm dia pvc pipe line of Prince/Sudhakar make with necessary gum and clamps at every 1m interval etc complete as directed.

75

-

15225

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position of 110mm dia pvc plain bends of ISI mark with necessary gum ,solution etc complete as directed.

40

-

4136

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position of 75 mm dia pvc Plain bends of ISI mark with necessary gum ,solution etc complete as directed

30

-

1943

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Providing and Placing on Terrace (at all floor levels) polythylene sintex water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlet and overflow pipes but without fittings and base support for tanks.

8000

-

49040

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position pvc mirrors of size 450*300 mm fixed to wall etc complete as directed.

10

-

5663

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying ,laying,jointing and testing of 50mm dia GI pipe line medium B-class ISI mark of TATA/ ZINDAL make with necessary specials such as Tees , Bends ,Elbows etc including cost of pipes, fittings and labour charges etc complete as directed by the dept.

40

-

21033

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying ,laying,jointing and testing of 40mm dia GI pipe line medium B-class ISI mark of TATA/ ZINDAL make with necessary specials such as Tees , Bends ,Elbows etc including cost of pipes, fittings and labour charges etc complete as directed by the dept.

90

-

42804

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying ,laying,jointing and testing of 15mm dia GI pipe line medium B-class ISI mark of TATA/ ZINDAL make with necessary specials such as Tees , Bends ,Elbows etc including cost of pipes, fittings and labour charges etc complete as directed by the dept

90

-

19980

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position of 110mm dia pvc door Tees of ISI mark with necessary gum ,solution etc complete as directed.

20

-

2500

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position of 75 mm dia pvc Tees of ISI mark with necessary gum ,solution etc complete as directed.

30

-

1705

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position of 50mm dia GI union of ISI mark etc complete as directed.

16

-

2327

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position of 40mm dia GI union of ISI mark etc complete as directed.

8

-

937

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position 50mm dia GM Gate Valve of ISI mark etc complete as directed.

3

-

10877

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing in position 40mm dia GM Gate Valve of ISI mark etc complete as directed.

4

-

9916

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Supplying and fixing of Structural glazing of zindal/global make for elevation with 5 mm reflective toughened glass of saint gobian make and aluminium sections for main frame of size 48mmx48mm.Glass will be fixed with double gum tape and silicon sealent and dow corning sealent etc complete

280

-

1657040

... More
Construction of Building for I.O.T third floor fully and fourth floor (Southern Wing), College of En;Painting with plastic emulsion paint of grade-1 standard make to exterior faces of new walls two coat of approved make shade and colour over primer coat with cement primer grade - I over two coats of wall putty including cost and conveyance of materials like Plastic Emulsion paint, white cement primer,putty to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion,primer,two coats of putty etc., complete for finished item of work (APSS No.910, 911&1201) in all floors.

2424.57

-

954044



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.