Andhra University Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra University Tender

Opening Date5 Oct 2020
Closing Date19 Oct 2020
Tender Amount₹ 2,08,93,035 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS 5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for columns in ground floor etc complete as directed.

8

-

96053

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges,vibrating, curing ,removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for plinth beams etc complete as directed. APDSS 403

2

-

22612

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges,vibrating with mechanical vibrator , curing etc.., complete but excluding cost of steel and its fabrication charges for finished item of work for beams in ground floor etc complete as directed. APDSS 403

5

-

55852

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of is 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges,vibrating with mechanical vibrator , curing etc. but excluding cost of steel and its fabrication charges for finished item of work for 12.5 Cm thick slab in ground floor etc complete as directed. APDSS 403

75

-

998951.25

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges,vibrating with mechanical vibrator , curing etc; but excluding cost of steel and its fabrication charges for finished item of work for 20 cm thich slab in ground floor etc complete as directed. APDSS 403

45

-

802851.3

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with CM (1:3) in 12 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing etc for ceiling work in ground floor .etc complete as directed APDSS 903

160

-

604080

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cm (1:3) in 12 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing etc for RCC vertical surfaces in ground floor etc complete as directed . APDSS 903

40

-

145306

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T& P etc.., complete for finished item of work .(APSS NO.309 & 310)

100

-

3451

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Fly ash brick Masonry work in CM (1:6) prop, with fly ash cement solid blocks of size 290 X 225 X 140 mm for manufacturing of fly ash solid blocks using fly ash of 80kgs, cement of 15 kgs .gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, lab our charges, seignior age charges, scaffolding and curing etc.., complete with a compressive strength not less then 50kg/sqm for walls for superstructure walls etc complete as directed in ground floor for 14 CM thick walls APDSS 501,504

6

-

43073

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with CM(1:5) in 12 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing etc complete as directed in ground floor . APDSS 903

80

-

280300.8

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Granolithic concrete flooring 20 mm thick with (1:1:2) using 6 mm to 10 mm size hard granite machine crushed metal in alternative panels of size not exceeding 1.50mx1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost and convenyence of materials like cement,sand metal and water including seigniorage charges etc complete for finished item of work as directed in ground floor APDSS 710

40

-

15722

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying fitting and placing HYSD bar reinforcement in VRCC works complete including wastage, as per drawings and technical specifications for bars below 36 mm dia including over laps and wastage where they are not welded etc complete as directed in ground floor

4500

-

283346

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for columns in first floor etc complete as directed. APDSS 403

27

-

343094

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for lintels in first floor etc complete as directed. APDSS 403

10

-

125024.2

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for Sunshades 6.5 CM average thickness in first floor etc complete as directed. APDSS 403

40

-

49632

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for beams up to 3.66 m in first floor etc complete as directed. APDSS 403

20

-

233094

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for beams 3.66 to 4.27m in first floor etc complete as directed. APDSS 403

17

-

214789

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for beams at 4.88 m in first floor etc complete as directed. APDSS 403

15

-

218918.55

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for 12.5 CM thick slab at 3.66 m to 4.27 m in first floor etc complete as directed. APDSS 403

160

-

2401521.6

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for 12.5 cmthick slab at 4.27 m to 4.88 m in first floor etc complete as directed. APDSS 403

160

-

2579675.2

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for 12.5 CM thick slab at 4.88 m in first floor etc complete as directed. APDSS 403

250

-

4309015

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for 15 CM thick slab in first floor etc complete as directed. APDSS 403

95

-

1461675.7

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for 15 CM thick slab at 3.66 to 4.27 m in first floor etc complete as directed. APDSS 403

50

-

825333

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for 15 CM thick slab at 4.88 m in first floor etc complete as directed. APDSS 403

95

-

178106

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for 20 CM thick slab in first floor etc complete as directed. APDSS 403

90

-

1669969.8

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Fly ash Masonry work in cm (1:6) prop, with fly ash cement solid blocks of size 290 X 225 X 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs .gypsum of 5 kgs. And stone dust including cost and conveyance of all materials, lab our charges, seignior age charges, scaffolding and curing etc.., complete with a compressive strength not less then 50kg/ Sq m for walls in first floor etc complete as directed. up to 3.66 meter in first floor APDSS 501,504

130

-

953725

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Fly ash Masonry work in cm (1:6) prop, with fly ash cement solid blocks of size 290 X 225 X 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs .gypsum of 5 kgs. And stone dust including cost and conveyance of all materials, lab our charges, seignior age charges, scaffolding and curing etc.., complete with a compressive strength not less then 50kg/ Sq m for walls in first floor etc complete as directed. from 3.66 to 4.27 meters in first floor APDSS 501,504

11

-

82763

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position Teak wood doors with 35 mm thick flush shutters with necessary 100x75 mm wood scantlings for frames and fixed the frame in to the masonry with Z hold fasts six numbers 300 mm long with necessary screws not less than 50 mm length with necessary furniture MS 125 mm hinges 300x16 mm Aldrop , Aluminium tower bolts300 mm and 150 mm ,handles 100 mm, locking arrangements wind appliances and shutter solid bond wood block boardtype with commertial ply on both sides 35 mm thick conforming to IS;2202 etc complete for finished work as directed. (APDSS-1001&1002)

42

-

284603

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Poly Vinyl Chloride (UPVC)sliding windows comprising of factory made uPVC multi chambered frame with in-built rollar track and sash extruded profiles duly reinforced with 1.60 +0.2 mm thick galvanised mild steel section made from roll forming process of required length (shape and size according to uPVC profile)appropriate dimension of uPVC extruded interlocks EPDM gasket ,wool pile ,zink alloy (white powder coated )touch locks with hooks,zink alloy body withsingle nylon rollers (weight bearing capacity to be 120 kg ) G.I fasteners 100x 8mm size for fixing frame to finished wall and necessary stain less steel screws etc .Profile of frame &sash shall be mitred cut and fusion welded at all corners ,including drilling of holes for fixing hard ware and drainage of water etc.After fixing the frame the gap between the frame and and adjecent finished wall shall be filled with weather proof silicon sealent over backer rod of required size and approved quality ,all complete as per approved drawing and direction inclusive of cost of glass panes wire mesh and silicon sealent for Two track panels sliding window made of (big series) frame 67x 50 mm &sash 46x 62 mm both having wall thickness of 2.3 + 0.2 mm and single glazing bead of appropriate dimension etc complete for finished item of work (for windows above 2.50 sq.m up to 4.00 sqm)

60

-

420876

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position M.S. grills at 16 kg/m2 includingcost of steel and fabrication ,cost of welding rods, power charges and fixing in position by screws to the frames or in tio the wall surfaces etc complete

60

-

99669

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Flooring with vitrified tiles double charged/ multi charged stain free fully body porcelain vitrified tiles with double layer pigment of size 600x600 mmand thickness between 8-10 mm and , 1st quality of any colour in finish in all shades and designs and approved by the engineer- in charge, set over base coat of cement mortar (1:8) , 12 mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work . (APSS NO 701 & 707) in First floor

760

-

978148

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying fitting and placing HYSD bar reinforcement for VRCC works complete including wastage, as per drawings and technical specifications for bars below 36 mm dia including over laps and wastage where they are not welded etc complete as directed in first floor

24000

-

1550109

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cement mortar (1:5) 12 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge etc complete as directed complete as directed in first floor up to 3.66 meters APDSS 903

1200

-

462958

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cement mortar (1:5) 12 mm thick for brick masonry including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge etc complete as directed etc complete as directed in first floor up to 3.66 meters to 4.27 meters APDSS 903

100

-

39401

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cement mortar (1:3) 12 mm thick for RCC vertical surfaces of including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge etc complete as directed in first floor . APDSS 903

200

-

79738

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cement mortar (1:3) 12 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge etc complete as directed etc in first floor for RCC ceiling surfaces etc complete as directed up to 3.66 meters APDSS 903

400

-

164246

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cement mortar (1:3) 12 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge etc complete as directed etc in first floor for RCCceiling surfaces etc complete as directed at 3.66 meters to 4.27 mts APDSS 903

210

-

90206

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cement mortar (1:3) 12 mm thick etc including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge etc complete as directed in first floor for RCC ceiling surfaces etc complete as directed at 4.88 metres in first floor APDSS 903

350

-

1583526

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for columns in second floor etc complete as directed. APDSS 403

40

-

536309

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for Lintels in second floor etc complete as directed. APDSS 403

10

-

130980.1

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for sunshades 6.5 CM average thick in second floor etc complete as directed. APDSS 403

70

-

91184

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for beams in second floor at 3.66 to 4.27 m etc complete as directed. APDSS 403

72

-

950508

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for beams in second floor etc complete as directed. APDSS 403

8

-

97124.48

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for 12.5 CM thick slab in second floor at 4.27m etc complete as directed. APDSS 403

570

-

8929135.5

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for 15 CM thick slab in second floor at 4.27 m etc complete as directed. APDSS 403

660

-

1136191

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete M30 Mix as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for 20 CM thick slab in second floor etc complete as directed. APDSS 403

150

-

2890396.5

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Fly ash Masonry work in cm (1:6) prop, with fly ash cement solid blocks of size 290 X 225 X 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs .gypsum of 5 kgs and stone dust including cost and conveyance of all materials, lab our charges, seignior age charges, scaffolding and curing etc.., complete with a compressive strength not less then 50kg/ Sq mt for 23 cm thick walls in second floor etc complete as directed. APDSS 501,504

185

-

1455272

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Fly ash Masonry work in cm (1:6) prop, with fly ash cement solid blocks of size 290 X 225 X 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs .gypsum of 5 kgs and stone dust including cost and conveyance of all materials, lab our charges, seignior age charges, scaffolding and curing etc.., complete with a compressive strength not less then 50kg/ Sq mt for 14cm thick walls in second floor etc complete as directed. APDSS 501,504

10

-

85341

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Fly ash Masonry work in cm (1:6) prop, with fly ash cement solid blocks of size 290 X 225 X 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs .gypsum of 5 kgs and stone dust including cost and conveyance of all materials, lab our charges, seignior age charges, scaffolding and curing etc.., complete with a compressive strength not less then 50kg/ Sq mt for 23 cm thick walls in second floor 3.66 m to 4.27 meters etc complete as directed. APDSS 501,504

15

-

122126

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying fitting and placing HYSD bar reinforcement for VRCC works complete including wastage, as per drawings and technical specifications for bars below 36 mm dia including over laps and wastage where they are not welded etc complete as directed in second floor

37000

-

2451252

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position Teak wood doors with 35 mm thick flush shutters with necessary 100x75 mm wood scantlings for frames and fixed the frame in to the masonry with Z hold fasts six numbers 300 mm long with necessary screws not less than 50 mm length with necessary furniture MS 125 mm hinges 300x16 mm Aldrop , Aluminium tower bolts300 mm and 150 mm ,handles 100 mm, locking arrangements wind appliances and shutter solid bond wood block boardtype with commertial ply on both sides 35 mm thick conforming to IS;2202 etc complete for finished work as directed. (APDSS-1001&1002)

51

-

345590

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position Unplasticised Poly Vinyl Chloride (UPVC)sliding windows comprising of factory made uPVC multi chambered frame with in-built rollar track and sash extruded profiles duly reinforced with 1.60 +0.2 mm thick galvanised mild steel section made from roll forming process of required length (shape and size according to uPVC profile)appropriate dimension of uPVC extruded interlocks EPDM gasket ,wool pile ,zink alloy (white powder coated )touch locks with hooks,zink alloy body withsingle nylon rollers (weight bearing capacity to be 40 kg ) G.I fasteners 100x 8m size for fixing frame to finished wall and necessary stain less steel screws etc .Profile of frame &sash shall be mitred cut and fusion welded at all corners ,including drilling of holes for fixing hard ware and drainage of water etc.After fixing the frame the gap between the frame and and adjecent finished wall shall be filled with weather proof silicon sealent over backer rod of required size and approved quality ,all complete as per approved drawing and direction inclusive of cost of glass panes wire mesh and silicon sealent for Two track panels sliding window made of (small series) frame 52x 44 mm &sash 32x 60 mm both having wall thickness of 1.9 + 0.2 mm and single glazing bead of appropriate dimension etc complete for finished item of work (for windows up to 1.75 Sq.Mt )

27

-

185222

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Poly Vinyl Chloride (UPVC)sliding windows comprising of factory made uPVC multi chambered frame with in-built rollar track and sash extruded profiles duly reinforced with 1.60 +0.2 mm thick galvanised mild steel section made from roll forming process of required length (shape and size according to uPVC profile)appropriate dimension of uPVC extruded interlocks EPDM gasket ,wool pile ,zink alloy (white powder coated )touch locks with hooks,zink alloy body withsingle nylon rollers (weight bearing capacity to be 120 kg ) G.I fasteners 100x 8mm size for fixing frame to finished wall and necessary stain less steel screws etc .Profile of frame &sash shall be mitred cut and fusion welded at all corners ,including drilling of holes for fixing hard ware and drainage of water etc.After fixing the frame the gap between the frame and and adjecent finished wall shall be filled with weather proof silicon sealent over backer rod of required size and approved quality ,all complete as per approved drawing and direction inclusive of cost of glass panes wire mesh and silicon sealent for Two track panels sliding window made of (big series) frame 67x 50 mm &sash 46x 62 mm both having wall thickness of 2.3 + 0.2 mm and single glazing bead of appropriate dimension etc complete for finished item of work (for windows above 2.50 sq.m up to 4.00 sqm)

63

-

441920

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position M.S. grills at 16 kg/m2 includingcost of steel and fabrication ,cost of welding rods, power charges and fixing in position by screws to the frames or in tio the wall surfaces etc complete

90

-

149503

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cement mortar (1:5) 12 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge etc complete as directed complete as directed in second floor up to 3.66 meters

1650

-

695015

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cement mortar (1:5) 12 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge etc complete as directed complete as directed in second floor up to 3.66 meters to 4.27 m APDSS 903

120

-

52240

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cement mortar (1:3) 12 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge etc complete as directed etc in second floor for RCC ceiling surfaces etc complete as directed at 3.66 meters to 4.27 mts APDSS 903

1950

-

915141

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cement mortar (1:3) 12 mm thick for RCC vertical surfaces of including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge etc complete as directed in second floor . APDSS 903

380

-

164963

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cement mortar (1:3) 12 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge etc complete as directed etc in second floor for RCC ceiling surfaces etc complete as directed up to 3.66 m APDSS 903

70

-

32107

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Flooring with vitrified tiles double charged/ multi charged stain free fully body porcelain vitrified tiles with double layer pigment of size 600x600 mmand thickness between 8-10 mm and , 1st quality of any colour in finish in all shades and designs and approved by the engineer- in charge, set over base coat of cement mortar (1:8) , 12 mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work . (APSS NO 701 & 707) in second floor

950

-

1266452

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Flooring with ceramic tiles of size 300x300 mm 7-8 mm thick set over a base coat of of cement mortar (1:8) , 12 mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work .

62

-

64694

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Dadooing to walls with glazed coloured tiles first quality of approved size set over a base coat of (1:5) 12 mm thick with cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work

110

-

109188

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Painting with enamel paint to wood work two coats over one coat of wood primer paint etc.with best approved colour and brand after scraping the surfaces etc complete as directed

185

-

34322

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Painting with enamel paint two coats over one coat of zinc oxide primer for iron work with best approved colour and brand after scraping the surfaces etc complete as directed

180

-

32256

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Flooring with high polished granite 16 to 18 mm thick up to 2.43 m other than black and regular colours set over base coat of cement mortar (1:8) 12 mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work in first floor

40

-

152425

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Flooring with high polished granite 16 to 18 mm thick up to 2.43 mo other than black and regular coours set over base coat of cement mortar (1:8) 12 mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work in second floor

85

-

331095

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Vibrated Reinforced cement concrete(1:3:6) as per table 9 of IS 456 using 12mm and 20 mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, lift charges, vibrating with mechanical vibrator , curing and removal of centering etc. but excluding cost of steel and its fabrication charges for finished item of work for encasement of columns in third floor etc complete as directed. APDSS 403

9

-

119623

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cement mortar (1:3) 12 mm thick for RCC vertical surfaces of including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge etc complete as directed in third floor . APDSS 903

95

-

44606

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Fly ash Masonry work in cm (1:6) prop, with fly ash cement solid blocks of size 290 X 225 X 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs .gypsum of 5 kgs and stone dust including cost and conveyance of all materials, lab our charges, seignior age charges, scaffolding and curing etc.., complete with a compressive strength not less then 50kg/ Sq mt for 23 cm thick walls in third floor etc complete as directed. APDSS 501,504

50

-

419855

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastering with cement mortar (1:5) 12 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge etc complete as directed complete as directed in third floor APDSS 903

490

-

223756

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Plastic emulsion Painting to walls and ceilings etc with two coats over one coat of cement primer paint of approved brand and shade to interior and exterior surfaces to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materiel, including cost and conveyance of all materials to work site and all operational, incidental ,labour charges etc complete for finished items of work as per SS 912 etc complete as directed.

7500

-

1386960

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Providing impervious coat to exposed RCC slab surfaces to required slopes with CM(1:3)prop 20 mm thick(average) mixing with water proof compound from reputed manufactuers as approved by the engineer at 1 kg for one bag of cement laid over roof slab finished smooth with a floating coat of neat cement and thread lining at regular intervals at 45cmx45cm including cost and conveyence of materials like cement,sand(screened)water proofing compound etc to site cost of seigniorage andall other taxes on all materials and operational ,incidental and labour charges for mixing mortar ,laying ,lifting,rendering smooth and thread lining ,cutting including rounding off junctions of wall and slab etc complete for finished item of work (APSS No.901&903) etc complete as directed over second floor slab.

1250

-

724764

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Providing and fixing factory made polyvinyl chloride (PVC)Door Frame of the size 50 x 47mm with a wall thickness of 5mm, made out of extruded 10 mm rigid PVC foam sheet,mitre cut at two corners and joined with 2nos. of 150mmlong brackets of 15x15mm M.S. square tube. The twovertical door profiles are to be reinforced with 19x19mmM.S. Square tube of 19 gauge. The door frame shall befixed to the wall using 65/100mm long M.S. Screwsthrough the frame by using PVC fasteners. A minimum of4nos. of screws to be provided for each vertical member &minimum 2nos. for horizontal member etc. complete asper manufacturers specification and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19gauge thickness and size of 19mm x 19mm for stiles, &15mm x 15mm for top & bottom rails. M.S. frame shallhave a coat of steel primers of approved make andmanufacture. M.S. frame shall be covered with 5mm thickheat moulded PVC ?C? channel of size 30 x 50mm formingstiles, and 5mm thick, 75mm wide PVC sheets for top rail,lock rail & bottom rail on either side, and 10mm (5mm x 2)thick, 20mm wide cross PVC sheet as gap insert for toprail & bottom rail. Panelling of 5mm thick PVC sheet to befitted in the M.S. frame welded / sealed to the stiles & railswith 30mm wide x 5mm thick PVC sheet beading on eitherside, and joined together with solvent cement adhesiveetc. An additional 5mm thick PVC strip of 20mm width is tobe stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineerin-charge, manufacturer?s specification & drawing forfinished item of work .

18

-

67634

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position pre- painted galvanized trepozided profile roofing sheets with 0.5mm thickness, coating; Zink coating Z120 GSM Tensile strength; 300MPA regular modified polyester painting thickness(top)18 to 20 microns and 5 to 7 microns at bottom necessary bolts nuts washes or suitable to the existing truss etc with necessary over lapping etc complete as directed.

85

-

73395

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position stainless steel hand railing using A ISI 304 grade top rail with 50 mm Dia pipe 16 gauge vertical with 40 mm dia pipe and 2 Nos of horizontal pipes 25 mm dia pipe and stainless steel rod pins and stainless steel rod pins male and female and cutting holes in the granite with diamond edge blade and fixing with vertical pipes with lock seal of (fosroc India) fixed with 20 mm MS rod with 6 mm thick MS flat covered with SS Caps. The finish of the railing is mirror finish.

40

-

144000

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Labour charges for fixing in position by fabricating all heavy steel works like truses sanchions beam and girders includng cost of welding rods ,power including cost and conveyence of all materials etc complete as directed

150

-

12990

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position European water closet of first quality conforming to IS :2556-part-1973 of white glazed with necessary P-trap and with plastic seatand lid for EWC with rubber or plastic buffers and with PVC low level system with internal components and short bend 8 litres capacity single flush and angle stop cock 12.7 mm dia first qualityIndian make heavy dutyand fixing with 12.7 mm PVC connection with brass union nut C.P coated etc complete as directed

5

-

22229

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position Orissa pan white glazed water closet first quality ISI marked conforming to IS:2556-part-3-1981 with Por S trap of W.C size 580mmx440 mm buffers and with PVC low level system with internal components and short bend 8 litres capacity single flush and angle stop cock 12.7 mm dia first qualityIndian make heavy dutyand fixing with 12.7 mm PVC connection with brass union nut C.P coated etc complete as directed

2

-

6310

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position Indian make flat back wash hand basin 550x400 mm first quality conforming to IS:2556-part-4:1972 with waste fittings like rubber plug ,chain ,32 mm nominal size C.P fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore chromium plated pillar tap of first quality Indian make 400 gmsSeiko/ seniornice/ Esso or eqivalent complete with standard CI brackets including wooden block with necessary with necessary sigle C.P.pillor cock etc complete as directed

4

-

7697

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position CP long body bib cock fancy type deluxe heavy duty 12.7 mm dia Indian make etc complete as directed

10

-

6215

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position 100 mm dia PVC multi flow trap / Nahani trap with necessary jali etc complete as directed

20

-

2773

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position 110 mm dia PVC pipe 4 kg/sq.cm with air tight joints etc..with necessary clamps etc complete as directed,

65

-

19546

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position 75 mm dia PVC pipe 4kg/sq.cm with air tight joints etc..with necessary clamps etc complete as directed

30

-

6090

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position 110 mm dia PVC door bends 87.5 degree etc. with air tight joint etc completed as directed

15

-

1551

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position 75 mm dia PVC door bends 87.5 degree etc. with air tight joint etc completed as directed

15

-

972

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Providing and placing on terrace (at all floor levels) polyethylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and out let and over flow pipes but with out fittings and base b support for tanks etc complete as directed

4000

-

24520

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position TV shape mirror with plastic frame size 60cm x45 cm with necessary screws and fixed to the wall surface etc complete as directed

4

-

2265

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying laying and jointing 50 mm nominal bore GI pipe medium grade propoerties and weight as per IS 1239 ISI mark with GI fittings including the cost of pipe and its fittings and labourcharges etc complete as directed

16

-

8414

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying laying and jointing 40 mm nominal bore GI pipe medium grade propoerties and weight as per IS 1239 ISI mark with GI fittings including the cost of pipe and its fittings and labourcharges etc complete as directed

35

-

16646

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying laying and jointing 15 mm nominal bore GI pipe medium grade propoerties and weight as per IS 1239 ISI mark with GI fittings including the cost of pipe and its fittings and labourcharges etc complete as directed

50

-

11100

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position 100 mm dia PVC single Tee with door with air tight joints etc. completed as directed

8

-

1000

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position 75 mm dia PVC single Tee with door with air tight joints etc..completed as directed

12

-

682

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position 50 mm dia GI unions first quality etc.completed as directed

6

-

873

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position 40 mm dia GI unions first quality etc..completed as directed.

3

-

352

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position Gun metal (GM peet) as per IS 778 Class-1,Indian make heavy type -50 mm NB size etc complete as directed

2

-

7251

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Supplying and fixing in position Gun metal (GM peet) as per IS 778 Class-1,Indian make heavy type -40 mm NB size etc complete as directed

3

-

7437

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Dismantling of brickmasonry in cement mortar and clearing the materials etc complete as directed

5

-

1367

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Dismantling of encasement columns in RCC mix and clearing the materials etc complete as directed

9

-

25974

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Carpenters for removal of GI roof and structural material etc complete as directed

10

-

7317

... More
Construction of building for centre for excellence for IOTon balance portion in first floor and full;Mazdoors required for removal of GI roof and structurial material etc complete as directed

10

-

6681



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.