Andhra University Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra University Tender
Civil And Construction
Building Construction
Opening Date14 Feb 2022
Closing Date28 Feb 2022
Tender Amount₹ 39,73,247
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
477856Bid Award Id
ViewTender No
UE/E-PTN(7)/AU/VSP/2021-22Tender Authority
Andhra University ViewPurchaser Address
-Website
http://https://www.andhrauniversity.edu.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Filling in foundations and basements with excavated earth in 15cm thick layers well watering, ramming ,consolidation etc complete as directed by Engineer Incharge .
25
-
955
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Filling with borrowed earth 15cm thick layers well watering,ramming,consolidation etc complete as directed by Engineer Incharge
5
-
2518
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;providing pre-construction Anti termite treatment by applying and injecting to wall trenches, botttom of excavation foundations, vertical walls,top surface of plinth filling wall and floor junctions, joints, conduits and external perimeter of the building using chlorophyriphos 20% EC lindone-20% EC @1:19 ratio with hand operated pressure pump at applicable area as per the site conditions in various stages as per IS 6313-2003 part II , including all costs and conveyance for providing three stage pest control treatment etc complete as directed.
12
-
2046
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Plain Cement Concrete (1:4:8) proportion nominal mix 10 cm thick for flooring bed(cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 40mm size (SS5) hard,machine crushed granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402)
40
-
15892
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Vibrated Reinforced Cement Concrete (1:11/2:3) nominal Mix FOR PLINTH BEAMS as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including wooden centering, shuttering and scaffolding with wooden reepers ,posts,runners as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403)
3
-
34788
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;BrickMasonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size 290mm X 225mm X 140mm and having minimum crushing strength of 75 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials like cement, sand, fly ash solid blocks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).
16
-
113286
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Vibrated Reinforced Cement Concrete(1:11/2:3) nominal Mix for LINTELS as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including wooden centering, shuttering and scaffolding with wooden reepers ,posts,runners as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403)
0.6
-
6744
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Vibrated Reinforced Cement Concrete (1:11/2:3) nominal Mix for 10 CM THICK SLAB slab as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including wooden centering, shuttering and scaffolding with wooden reepers ,posts,runners as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403)
22
-
22848
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Plastering 12mm thick in CM(1:3) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903)
25
-
10115.75
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Plastering 12mm thick in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903)
180
-
68078
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;supplying and fixing in position powder coated alluminium glazed sliding windows using 2mm thickzindal sections with necessary locking arrangements etc
6
-
19200
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing Vitrified tiles flooring with virtified tiles of size 600mm x600mm, 1st quality Khajaria/Rak as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707)
30
-
38493
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing Granite platform using 20 mm thick jet black granitre for coffee counter and fixing over abase plastering in cm (1:5) 20 mm thick including half rounding the edges ,cost and conveyance of al material and labour charges etc complete.
8
-
28789
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Painting with plastic emulsion paint of grade-1 standard make to exterior faces of new walls two coat of approved make shade and colour over primer coat including cost and conveyance of materials like Plastic Emulsion paint, white cement primer to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion,etc., complete for finished item of work (APSS No.910, 911&1201) in all floors).
205
-
41779
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing in position M.S ornamental grills to windows using not less than 16 kgs of steel per M2 area of grill work as per the approved design etc., complete as directed.
6
-
9736
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing painting two coats of synthetic Enamel Paint 1st grade of approved brand and shade over base coat of primer including cost and conveyance of all materials to site like cost of primer, enamel paint ,including cost of brushes and all labour charges etc complete as directed
6
-
1142
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work
520
-
34627
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Dismantling of doors,windows and clear storey windows etc including chowkhats,architraves hold fasts and other attachments exceeding 3 sqm in area etc complete.
3
-
2684
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Dismantling of Reinforced cement concrete and clearing away the materials etc complete
3
-
5356
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Drilling of holes of 12 mm dia into RCC columns,beams upto a depth of 20 cm and filled the same with necessary adhesive etc complete.
108
-
13230
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;BrickMasonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size 290mm X 225mm X 140mm and having minimum crushing strength of 75 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials like cement, sand, fly ash solid blocks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).
4
-
30551
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Plastering 12mm thick in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903)
25
-
10411
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Vibrated Reinforced Cement Concrete(1:11/2:3) nominal Mix for LINTELS as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including wooden centering, shuttering and scaffolding with wooden reepers ,posts,runners as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403)
0.6
-
7087
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Vibrated Reinforced Cement Concrete M-30 nominal Mix for SUNSHADES as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with steel centering as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403)
8
-
10129
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Vibrated Reinforced Cement Concrete (1:11/2:3) nominal Mix for 7.5 CM THICK SLAB slab as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including wooden centering, shuttering and scaffolding with steel centering as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403)
6
-
6661
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work
100
-
6838
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;BrickMasonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size 290mm X 225mm X 140mm and having minimum crushing strength of 75 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials like cement, sand, fly ash solid blocks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).
2
-
16391
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Plastering 12mm thick in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903)
10
-
4547
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing High polished black granite planks flooring 16 to 18 mm thick upto 2.4 m length set over base coat of cement mortar (1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work . (APSS NO . 701 & 707)
15
-
54536
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;BrickMasonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size 290mm X 225mm X 140mm and having minimum crushing strength of 75 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials like cement, sand, fly ash solid blocks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).
28
-
245068
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Plastering 12mm thick in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903)
300
-
147870
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing Vitrified tiles flooring with virtified tiles of size 600mm x600mm, 1st quality Khajaria/Rak as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707)
25
-
35854
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing dadooing to walls with glazed coloured tiles 1st quality of size approved and make Khajaria/Rak by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including Seigniorage charges etc., complete for finished item of work.
75
-
101435
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing High polished black granite planks flooring 16 to 18 mm thick upto 2.4 m length set over base coat of cement mortar (1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work . (APSS NO . 701 & 707)
15
-
54536
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supply and fixing in position powered coated aluminium glazed lowered ventiliters using 2 mm zindal sections and 4 mm pin headed glass etc competed as directed ny department
3
-
10500
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;BrickMasonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size 290mm X 225mm X 140mm and having minimum crushing strength of 75 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials like cement, sand, fly ash solid blocks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).
16
-
148958
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Plastering 12mm thick in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903)
200
-
106226
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing Vitrified tiles flooring with virtified tiles of size 600mm x600mm, 1st quality Khajaria/Rak as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707)
425
-
630917
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing dadooing to walls with glazed coloured tiles 1st quality of size approvedand make Khajaria/Rak by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including Seigniorage charges etc., complete for finished item of work.
75
-
105212
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing High polished black granite planks flooring 16 to 18 mm thick upto 2.4 m length set over base coat of cement mortar (1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work . (APSS NO . 701 & 707)
30
-
114635
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing stainless steel hand railing with 316 Grade, 16 guage , 50 mm for top hand rail, 40mm die vertical support and 25mm dia Horizonral two lines as per the approved pattern and design as directed by the site Engineers for hand railing of 914mm(36") hieght above the finished floor level including cost of materials and conveyance to site, VAT Taxes and labour charges for all oprations etc., complete as per wuch as fabrication of hand railing drilling of holes in R.C.C Steps and finising of Handrailing leg reconnection etc., complete for finished item of work. The SS steel of 316 grade with lab test certificate should be prodiced as directed by the department
10
-
36000
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Plastering 12mm thick in CM(1:3) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903)
320
-
173846.4
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Painting with plastic emulsion paint of grade-1 standard make to exterior faces of new walls two coat of approved make shade and colour over primer coat including cost and conveyance of materials like Plastic Emulsion paint, white cement primer to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion,etc., complete for finished item of work (APSS No.910, 911&1201) in all floors).
1600
-
326080
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;BrickMasonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size 225mm X 100mm X 60mm and having minimum crushing strength of 75 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials like cement, sand, fly ash solid blocks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).
25
-
299273
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Plastering 12mm thick in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903)
320
-
182196
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Vibrated Reinforced Cement Concrete (1:11/2:3) nominal Mix for 7.5 CM THICK SLAB slab as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including wooden centering, shuttering and scaffolding with wooden reepers ,posts,runners as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403)
160
-
212258
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work
750
-
56648
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. 20mm thick (average) mixing with water proofing compound from reputed manufacturers as approved by Engineer-in- charge at 1 Kg/bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost and conveyance of materials like cement, sand (screened), water proofing compound etc., to site, cost of Seigniorage charges and all other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work (APSS No. 901 & 903)
750
-
570865
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying ,laying,jointing and testing of 40mm dia GI pipe line medium B-class ISI mark of TATA/ ZINDAL make with necessary specials such as Tees , Bends ,Elbows etc including cost of pipes, fittings and labour charges etc complete as directed by the dept.
26
-
12366
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying ,laying,jointing and testing of 20mm dia GI pipe line medium B-class ISI mark of TATA/ ZINDAL make with necessary specials such as Tees , Bends ,Elbows etc including cost of pipes, fittings and labour charges etc complete as directed by the dept.
35
-
8526
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing in position of 40mm dia GI union of ISI mark etc complete as directed.
2
-
235
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing in position 40mm dia GM Gate Valve of ISI mark etc complete as directed.
1
-
2479
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying,laying,jointing and testing of 110 mm dia pvc pipe line of Prince/Sudhakar make with necessary gum and clamps at every 1m interval etc complete as directed.
200
-
55606
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying,laying,jointing and testing of 75 mm dia pvc pipe line of Prince/Sudhakar make with necessary gum and clamps at every 1m interval etc complete as directed.
30
-
6090
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing in position of 110mm dia pvc plain bends of ISI mark with necessary gum ,solution etc complete as directed.
15
-
1193
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing in position of 110mm dia pvc Tee bends of ISI mark with necessary gum ,solution etc complete as directed.
16
-
1655
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing in position of 110mm dia pvc Door bends of ISI mark with necessary gum ,solution etc complete as directed.
6
-
621
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing in position of 75mm dia pvc plain bends of ISI mark with necessary gum ,solution etc complete as directed.
12
-
573
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing in position of 75mm dia pvc Tee bends of ISI mark with necessary gum ,solution etc complete as directed.
16
-
2000
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing in position of 110mmx75mm dia Nahany trap with Jali of ISI mark with necessary gum ,solution etc complete as directed.
30
-
4159
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing of white glazed European type Water Closet first quality conforming to IS 2556-part-2-1973 of Hindustan/Neycer/Parryware make with p trap and best quality Indian make plastic buffers as per IS 2548-1996 etc including pvc low level system parryware slim line flush tank of 8ltrs capacity with all necessary internal components such as short bend ,nylon connection,Angle cock etc complete as directed.
8
-
35567
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing of white glazed oval shape Wash Hand Basin(520x410mm) first quality conforming to IS 2556-part-2-1973 of Hindustan/Neycer/Parryware make with pillar cock of Jaquar make quarter turn series chrome finish with 7 yrs warranty and 12.7 mm pvc connection with brass union and nut cp coated with 19.05 mm NP stop cock Indian make with ISI mark 400gms etc complete as directed.
8
-
18375
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing Granite platform for oval shape wash hand basin and fixing over abase plastering in cm (1:5) 20 mm thick including half rounding the edges ,cost and conveyance of al material and labour charges etc complete.
10
-
35986
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with a wall thickness of 5mm, made out of extruded 10 mm rigid PVC foam sheet, mitre cut at two corners and joined with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be fixed to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A minimum of 4nos. of screws to be provided for each vertical member & minimum 2nos. for horizontal member etc. complete as per manufacturers specification and direction of Engineer-in- Charge for finished item of work. Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail &bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item of work .
15
-
52923
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Providing & Placing on Terrace(at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks Makke Sintex.
8000
-
49120
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing of white glazed flat back Urinals of size (440x265x315mm) with internal flushing rim fixed with screws Indian make first quality conforming to IS 2556-1995 of Hindustan/Neycer/Parryware and 12.7 mm pvc connection with brass union and nut cp coated with 19.05 mm NP stop cock Indian make with ISI mark 400gms etc complete as directed.
8
-
22140
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixingin position white glazed ceramic urinal partition of size 550x300 mm of parryware make etc complete
4
-
15200
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing of bibcock cum health faucet of jaquar make etc complete
16
-
68315
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Supplying and fixing of Saint gobian looking mirror and fixed to the wall by means of ss studs etc complete
6
-
27500
... More
Flooring finishing in 4th and 5th floors and elevation works(partly) of Innovation centre building;Painting with plastic emulsion paint of grade-1 standard make to exterior faces of new walls two coat of approved make shade OVER TWO COATS OF PUTTY and a base coat of cement primer of 1st quality including cost and conveyance of materials like Plastic Emulsion paint, white cement primer ,putty to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying putty and primer coat , two coats of Plastic Emulsion,etc., complete for finished item of work (APSS No.910, 911&1201) in all floors).
1000
-
416830
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements