Andhra University Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra University Tender

Civil And Construction
Building Construction
Opening Date31 Oct 2022
Closing Date21 Nov 2022
Tender Amount₹ 30,21,588 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Renovation and repair in block VI Engineering hostel;Dismantling of un reinforced concrete etc and clearing away the materials above 15 CM thick etc complete as directed APDSS 202

40

-

125709

... More
Renovation and repair in block VI Engineering hostel;Plastering with CM (1:3) in 12 mm thick over one coat of CM (1:3) 20 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing for ceiling surfaces work in ground floor . complete as directed APDSS 903

80

-

68164

... More
Renovation and repair in block VI Engineering hostel;Plastering with CM (1:3) in 12 mm thick over one coat of CM (1:3) 20 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing for ceiling surfaces work in first floor . complete as directed APDSS 903

125

-

116023

... More
Renovation and repair in block VI Engineering hostel;Plastering with CM (1:3) in 12 mm thick over one coat of CM (1:3) 20 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing for ceiling surfaces work in second floor . complete as directed APDSS 903

125

-

125541

... More
Renovation and repair in block VI Engineering hostel;Fly ash Masonry work in cm (1:6) prop, with fly ash cement solid blocks of size 230x100x60mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs .gypsum of 5 kgs and stone dust including cost and conveyance of all materials, lab our charges, seignior age charges, scaffolding and curing etc.., complete with a compressive strength not less then 50kg/ Sq Cm for 10 cm thick walls in first floor etc complete as directed. APDSS 501,504

5

-

44862

... More
Renovation and repair in block VI Engineering hostel;Fly ash Masonry work in cm (1:6) prop, with fly ash cement solid blocks of size 230x100x60mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs .gypsum of 5 kgs and stone dust including cost and conveyance of all materials, lab our charges, seignior age charges, scaffolding and curing etc.., complete with a compressive strength not less then 50kg/ SqCm for 10 cm thick walls in second floor etc complete as directed. APDSS 501,504

11

-

106940

... More
Renovation and repair in block VI Engineering hostel;Plastering with cement mortar (1:5) 12 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge in ground floor floor etc complete as directed APDSS 903

10

-

3783

... More
Renovation and repair in block VI Engineering hostel;Plastering with cement mortar (1:5) 12 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge in first floor etc complete as directed APDSS 903

100

-

41645

... More
Renovation and repair in block VI Engineering hostel;Plastering with cement mortar (1:5) 12 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge in second floor etc complete as directed APDSS 903

140

-

63655

... More
Renovation and repair in block VI Engineering hostel;Plastering with cement mortar (1:5) 20 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge in ground floor etc complete as directed APDSS 903

10

-

3916

... More
Renovation and repair in block VI Engineering hostel;Plastering with cement mortar (1:5) 20 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge in first floor etc complete as directed APDSS 903

10

-

4298

... More
Renovation and repair in block VI Engineering hostel;Plastering with cement mortar (1:5) 20 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge in second floor etc complete as directed APDSS 903

10

-

4681

... More
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position country wood doors frame with malasia sal or Nallamaddi with 100mmx75 mm scantlings with flush door double shutters with 35 mm thick flush shutters with teak wood beading alround with necessary furniture MS 125 mm hinges 300x16 mm Aldrop , Aluminium tower bolts300 mm and 150 mm ,handles 100 mm, wind appliances and shutter solid bond wood block board type with commertial ply on both sides 35 mm thick conforming to IS;2202 and fixing the frame in to the masonry by means of cZ hold fasts and ventilating frame covered with 75 mmx25mm IRC weld mesh heavy gauge with teak wood reaper alround etc with nevessary nails etc complete for finished work as directed. (APDSS-1001&1002)

100

-

420466

... More
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position country doors , frame with malasia sal or Nallamaddi with 100mmx75 mm scantlings with flush door double shutters with 35 mm thick flush shutters with teak wood beading alround with necessary furniture MS 125 mm hinges 300x16 mm Aldrop , Aluminium tower bolts300 mm and 150 mm ,handles 100 mm, wind appliances and shutter solid bond wood block board type with commercial ply on both sides 35 mm thick conforming to IS;2202 and fixing the frame in to the masonry by means of cZ hold fasts complete for finished work as directed. (APDSS-1001&1002)

15

-

61235

... More
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position best panelled wood window using Sal wood or Nallamadii for frames 75mmx75mm and shutters with malasia Kamba 32 mm thick rals and styles with 75mmx 38 mm . Fixing the frame in to the masonry by means of iron Z hold fasts heavy type screwed down to the frame with necessary screws of not less than 5 cm in length and fixing with necessary powder coated butth inges 100 mm ,Aluminium tower bolts 150 mm ,wind appliences etc and ventilating head fixed with IRC weld mesh 75mmx25mm heavy gauge with necessary wood reaper etc complete complete for finished item of work,APDSS 1001&1002

55

-

309661

... More
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position MS grills etc at 16 kg/ m2 including fixing with necessary screws including cost and conveyance of all materials etc complete as directed

22

-

35697

... More
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position stain less fly proof meshes with necessary teak reaper,nails including cost and conveyance of all materials etc complete as directed

120

-

72000

... More
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position IRC weld mesh 75mmx25 mm heavy gauge with necessary teak wood reaper with necessary nails including fixing including cost and conveyance of all materials etc complete as directed

165

-

115500

... More
Renovation and repair in block VI Engineering hostel;Cement concrete using 20 mm and 12mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials laying concrete, lift charges, vibrating with mechanical vibrator , curing etc. for (1:1.5:3) using water proof compound 1 kg per 1 Bag of cement etc concrete over second floor slab foor etc complete as directed. APDSS 402

30

-

195561

... More
Renovation and repair in block VI Engineering hostel;Supplying fitting and placing HYSD bar reinforcement in VRCC works complete including wastage, as per drawings and technical specifications for bars below 36 mm dia including over laps and wastage where they are not welded etc complete as directed APDSS 404

650

-

45604

... More
Renovation and repair in block VI Engineering hostel;Plastering with cm (1:3) in 12 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar using water proof compound one kg per one bag of cement finishing, curing in second floor etc complete as directed APDSS 903

330

-

157935

... More
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position pre- painted galvanized trepozided profile roofing sheets with 0.5mm thickness, coating; Zink coating Z120 GSM Tensile strength; 300MPA regular modified polyester painting thickness(top)18 to 20 microns necessary bolts nuts washers etc complete as directed.

100

-

86347

... More
Renovation and repair in block VI Engineering hostel;Structural steel fabrication for trusses and purlins etc using all sections as per designs including cost of steel and fabrication and erection complete for finished item of work etc complete as directed APDSS 1104

1400

-

201250

... More
Renovation and repair in block VI Engineering hostel;RCC (1:1.5:3) nominal mix using 20 mm and 12 mm size HGB metal machine crushed hand granite metal from approved quarry including cost of seigniorage and conveyance of all material , operational and incidental ,labour charges for all operations such as centering , machine mixing, laying of concrete , vibrating , curing etc complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work for 6.5 CM thick slabs in third floor etc complete as directed APDSS 402,404

40

-

50119

... More
Renovation and repair in block VI Engineering hostel;Flooring with vitrified tiles , 1st quality 600x600 mm Rak or kazaria and size approved by the engineer- in charge, set over base coat of cement mortar (1:8) , 12 mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work in third floor . (APSS NO . 701 & 707)

150

-

173048

... More
Renovation and repair in block VI Engineering hostel;Providing ornamental red brick jallies with necessary cement mortar etc complete as directed

40

-

42000

... More
Renovation and repair in block VI Engineering hostel;Supplying and fixing aluminium sheet for expansion joint with necessary nails etc complete as directed

55

-

56537

... More
Renovation and repair in block VI Engineering hostel;Providing double scaffolding including of all labour and material charges etc complete

2650

-

159000

... More
Renovation and repair in block VI Engineering hostel;Providing granolithic concrete flooring 20mm thick with C:C (1:1:2) Proportion using 6mm to 12mm size hard granite machine crushed metal laid monolithically over existing bed of P.C.C including cost and conveyance of all materials to site, Labour charges like mixing of cement concrete, Laying, using lift charges etc complete. APDSS 710

20

-

8351

... More
Renovation and repair in block VI Engineering hostel;Labour charges for fixing of grills or gratings etc complete as directed in Ground floor

90

-

11567

... More
Renovation and repair in block VI Engineering hostel;Removal of debris by lorry loads and clearing way the materials etc complete as directed

15

-

37500



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.