Andhra University Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra University Tender
Civil And Construction
Building Construction
Opening Date31 Oct 2022
Closing Date21 Nov 2022
Tender Amount₹ 30,21,588
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
557859Bid Award Id
ViewTender No
UE/E-PTN(5)/AU/VSP/2022-23Tender Authority
Andhra University ViewPurchaser Address
-Website
http://https://www.andhrauniversity.edu.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Renovation and repair in block VI Engineering hostel;Dismantling of un reinforced concrete etc and clearing away the materials above 15 CM thick etc complete as directed APDSS 202
40
-
125709
Renovation and repair in block VI Engineering hostel;Plastering with CM (1:3) in 12 mm thick over one coat of CM (1:3) 20 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing for ceiling surfaces work in ground floor . complete as directed APDSS 903
80
-
68164
Renovation and repair in block VI Engineering hostel;Plastering with CM (1:3) in 12 mm thick over one coat of CM (1:3) 20 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing for ceiling surfaces work in first floor . complete as directed APDSS 903
125
-
116023
Renovation and repair in block VI Engineering hostel;Plastering with CM (1:3) in 12 mm thick over one coat of CM (1:3) 20 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing for ceiling surfaces work in second floor . complete as directed APDSS 903
125
-
125541
Renovation and repair in block VI Engineering hostel;Fly ash Masonry work in cm (1:6) prop, with fly ash cement solid blocks of size 230x100x60mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs .gypsum of 5 kgs and stone dust including cost and conveyance of all materials, lab our charges, seignior age charges, scaffolding and curing etc.., complete with a compressive strength not less then 50kg/ Sq Cm for 10 cm thick walls in first floor etc complete as directed. APDSS 501,504
5
-
44862
Renovation and repair in block VI Engineering hostel;Fly ash Masonry work in cm (1:6) prop, with fly ash cement solid blocks of size 230x100x60mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs .gypsum of 5 kgs and stone dust including cost and conveyance of all materials, lab our charges, seignior age charges, scaffolding and curing etc.., complete with a compressive strength not less then 50kg/ SqCm for 10 cm thick walls in second floor etc complete as directed. APDSS 501,504
11
-
106940
Renovation and repair in block VI Engineering hostel;Plastering with cement mortar (1:5) 12 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge in ground floor floor etc complete as directed APDSS 903
10
-
3783
Renovation and repair in block VI Engineering hostel;Plastering with cement mortar (1:5) 12 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge in first floor etc complete as directed APDSS 903
100
-
41645
Renovation and repair in block VI Engineering hostel;Plastering with cement mortar (1:5) 12 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge in second floor etc complete as directed APDSS 903
140
-
63655
Renovation and repair in block VI Engineering hostel;Plastering with cement mortar (1:5) 20 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge in ground floor etc complete as directed APDSS 903
10
-
3916
Renovation and repair in block VI Engineering hostel;Plastering with cement mortar (1:5) 20 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge in first floor etc complete as directed APDSS 903
10
-
4298
Renovation and repair in block VI Engineering hostel;Plastering with cement mortar (1:5) 20 mm thick for brick masonry etc including cost and conveyance of all materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar, finishing ,curing as directed by the engineer-in charge in second floor etc complete as directed APDSS 903
10
-
4681
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position country wood doors frame with malasia sal or Nallamaddi with 100mmx75 mm scantlings with flush door double shutters with 35 mm thick flush shutters with teak wood beading alround with necessary furniture MS 125 mm hinges 300x16 mm Aldrop , Aluminium tower bolts300 mm and 150 mm ,handles 100 mm, wind appliances and shutter solid bond wood block board type with commertial ply on both sides 35 mm thick conforming to IS;2202 and fixing the frame in to the masonry by means of cZ hold fasts and ventilating frame covered with 75 mmx25mm IRC weld mesh heavy gauge with teak wood reaper alround etc with nevessary nails etc complete for finished work as directed. (APDSS-1001&1002)
100
-
420466
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position country doors , frame with malasia sal or Nallamaddi with 100mmx75 mm scantlings with flush door double shutters with 35 mm thick flush shutters with teak wood beading alround with necessary furniture MS 125 mm hinges 300x16 mm Aldrop , Aluminium tower bolts300 mm and 150 mm ,handles 100 mm, wind appliances and shutter solid bond wood block board type with commercial ply on both sides 35 mm thick conforming to IS;2202 and fixing the frame in to the masonry by means of cZ hold fasts complete for finished work as directed. (APDSS-1001&1002)
15
-
61235
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position best panelled wood window using Sal wood or Nallamadii for frames 75mmx75mm and shutters with malasia Kamba 32 mm thick rals and styles with 75mmx 38 mm . Fixing the frame in to the masonry by means of iron Z hold fasts heavy type screwed down to the frame with necessary screws of not less than 5 cm in length and fixing with necessary powder coated butth inges 100 mm ,Aluminium tower bolts 150 mm ,wind appliences etc and ventilating head fixed with IRC weld mesh 75mmx25mm heavy gauge with necessary wood reaper etc complete complete for finished item of work,APDSS 1001&1002
55
-
309661
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position MS grills etc at 16 kg/ m2 including fixing with necessary screws including cost and conveyance of all materials etc complete as directed
22
-
35697
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position stain less fly proof meshes with necessary teak reaper,nails including cost and conveyance of all materials etc complete as directed
120
-
72000
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position IRC weld mesh 75mmx25 mm heavy gauge with necessary teak wood reaper with necessary nails including fixing including cost and conveyance of all materials etc complete as directed
165
-
115500
Renovation and repair in block VI Engineering hostel;Cement concrete using 20 mm and 12mm size (SS5) hard granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.., to site and cost of seignior age charges on all materials laying concrete, lift charges, vibrating with mechanical vibrator , curing etc. for (1:1.5:3) using water proof compound 1 kg per 1 Bag of cement etc concrete over second floor slab foor etc complete as directed. APDSS 402
30
-
195561
Renovation and repair in block VI Engineering hostel;Supplying fitting and placing HYSD bar reinforcement in VRCC works complete including wastage, as per drawings and technical specifications for bars below 36 mm dia including over laps and wastage where they are not welded etc complete as directed APDSS 404
650
-
45604
Renovation and repair in block VI Engineering hostel;Plastering with cm (1:3) in 12 mm thick including cost and conveyance of all the materials like cement , sand, water etc., to site, including seignior age charges , sales & other taxes on all materials, and all operational , incidental charges on materials and including cost of all labour charges for mixing mortar using water proof compound one kg per one bag of cement finishing, curing in second floor etc complete as directed APDSS 903
330
-
157935
Renovation and repair in block VI Engineering hostel;Supplying and fixing in position pre- painted galvanized trepozided profile roofing sheets with 0.5mm thickness, coating; Zink coating Z120 GSM Tensile strength; 300MPA regular modified polyester painting thickness(top)18 to 20 microns necessary bolts nuts washers etc complete as directed.
100
-
86347
Renovation and repair in block VI Engineering hostel;Structural steel fabrication for trusses and purlins etc using all sections as per designs including cost of steel and fabrication and erection complete for finished item of work etc complete as directed APDSS 1104
1400
-
201250
Renovation and repair in block VI Engineering hostel;RCC (1:1.5:3) nominal mix using 20 mm and 12 mm size HGB metal machine crushed hand granite metal from approved quarry including cost of seigniorage and conveyance of all material , operational and incidental ,labour charges for all operations such as centering , machine mixing, laying of concrete , vibrating , curing etc complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work for 6.5 CM thick slabs in third floor etc complete as directed APDSS 402,404
40
-
50119
Renovation and repair in block VI Engineering hostel;Flooring with vitrified tiles , 1st quality 600x600 mm Rak or kazaria and size approved by the engineer- in charge, set over base coat of cement mortar (1:8) , 12 mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work in third floor . (APSS NO . 701 & 707)
150
-
173048
Renovation and repair in block VI Engineering hostel;Providing ornamental red brick jallies with necessary cement mortar etc complete as directed
40
-
42000
Renovation and repair in block VI Engineering hostel;Supplying and fixing aluminium sheet for expansion joint with necessary nails etc complete as directed
55
-
56537
Renovation and repair in block VI Engineering hostel;Providing double scaffolding including of all labour and material charges etc complete
2650
-
159000
Renovation and repair in block VI Engineering hostel;Providing granolithic concrete flooring 20mm thick with C:C (1:1:2) Proportion using 6mm to 12mm size hard granite machine crushed metal laid monolithically over existing bed of P.C.C including cost and conveyance of all materials to site, Labour charges like mixing of cement concrete, Laying, using lift charges etc complete. APDSS 710
20
-
8351
Renovation and repair in block VI Engineering hostel;Labour charges for fixing of grills or gratings etc complete as directed in Ground floor
90
-
11567
Renovation and repair in block VI Engineering hostel;Removal of debris by lorry loads and clearing way the materials etc complete as directed
15
-
37500
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements