To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra University Tender

Building Construction
Opening Date1 Dec 2020
Closing Date8 Dec 2020
Tender Amount₹ 1,21,99,419 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹51,000/MT*
Andhra Pradesh

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Vibrated Reinforced Cement Concrete M-30 grade Mix as per Table 9 of IS 456 using 20mm size and 13.5/12.5mm (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of Seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Lintels in SF

4.5

-

58941

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Vibrated Reinforced Cement Concrete M-30 grade Mix as per Table 9 of IS 456 using 20mm size and 13.5/12.5mm (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of Seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For 6 cm thick sunshades in SF

56

-

72946

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Vibrated Reinforced Cement Concrete M-30 grade Mix as per Table 9 of IS 456 using 20mm size and 13.5/12.5mm (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of Seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For beams in SF

34

-

412780

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Vibrated Reinforced Cement Concrete M-30 grade Mix as per Table 9 of IS 456 using 20mm size and 13.5/12.5mm (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of Seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Slab 15 cm thick in SF

535

-

855637

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Vibrated Reinforced Cement Concrete M-30 grade Mix as per Table 9 of IS 456 using 20mm size and 13.5/12.5mm (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of Seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Slab 18 cm thick in SF

22

-

39692

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Fly ash brick Masonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using second class traditional bricks of size 290x225x140 cm from approved quarry and having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including Seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). In SF

48

-

377599

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;supply and fixing in position contry wood doors, frame made with Malasia sal or nallamaddi for and commercial ply wood flush door shutter 35mm thick and using 100mmx75mm scantlings for frames and fixied the frame into the masonry by means of z_hold fasts not less than 6numers with necessary screws not less than 50mm length etc complete finished item APSS No 1001,1002

11

-

47672

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supplying and fixing of Un plasticized Poly Vinyl Chloride(UPVC) sliding windows three track - only two glass shutters sliding duly manufactured using UPVC reinforced profiles of (80 mm x 52 mm)/ (94 mm x 45 mm) x 2.0 mm for outer frames, (54 mm x 38 mm)/(39 mm x 58 mm) x2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2mm prefabricated & welded through fusion welding the window sash shall be fitted with 5 mm thick clear float g lass of reputed make duly fixed with TPV Gaskets/EPDM weathering seal resistant accessories like locking system 1 No., per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with template for casement sizing complete for finished item of work

87

-

538706

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supply and fixing of M.S.Iron ornimental grills of approved design using 16 kgs per sq.m with all materials fabrication transport and labor charges as directed by the site engineer

87

-

144521

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Masonry work in CM (1:6) prop with Fly ash Cement solid blocks of size 230 x 100 x 65 mm for manufacturing of fly ash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour ,seiniorage charges, scaffolding and curing etc., complete with a compressive strength not lessthan 50 kg/sqm for walls for Superstructure Walls. Reinforced Brick wall of thickness 10 CM

30

-

28966

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work APSS No 403 in SF

17000

-

1126420

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Plastering 12mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand , water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for external and internal plastering in SF

700

-

294855

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing Plastering to Ceiling 12mm thick in single coat in CM(1:3) including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including Seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) In SF

800

-

360884

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Vetrified tiles flooring with 1st quality of size 600x600 mm with double charged /multi charged stain free fully body porcelain ,, with double layer pigment and thickness 8-10 mm as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707) in SF

430

-

573236

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Ceramic tiles flooring 1st quality and of size as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707) In SF

15

-

15652

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing dadooing to walls with glazed coloured tiles 1st quality of size approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including Seigniorage charges etc., complete for finished item of work. In SF

50

-

49631

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

600

-

27110

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Painting with plastic emulsion paint of grade-1 standard make to interior faces of new walls two coat of approved make shade and colour over primer coat with cement primer grade - I including cost and conveyance of materials like Plastic Emulsion paint, white cement to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion etc., complete for finished item of work (APSS No.910, 911&1201) in all floors.

400

-

73972

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Painting with plastic emulsion paint of grade-1 standard make to external faces of new walls two coat of approved make shade and colour over primer coat with cement primer grade - I including cost and conveyance of materials like Plastic Emulsion paint, white cement to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion etc., complete for finished item of work (APSS No.910, 911&1201) in all floors.

400

-

76836

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing Enamel Painting two coats over base coat of primer paint with best quality of paints i,e, Asian, Berger paints. to New wood works etc complete APSS No 1201,1202

25

-

4639

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing Enamel Painting two coats over base coat of primer paint with best quality of paints i,e, Asian, Berger paints. to New Iron works etc complete APSS No 1201,1202

50

-

8960

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;S & F in position Decorated Red Jallis of 75 mm thick including all Material s and labour charges etc completed.

21

-

2205

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing High polished black granite planks flooring 16 to 18 mm thick upto 2.4 m length set over base coat of cement mortar (1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work For Second Floor . (APSS NO . 701 & 707)

33

-

98824

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Half rounding the edge for granite and morbile stone planks after polishing the same etc and complete. For Second floor

43

-

15536

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Tiles cladding to walls with tiles for elevation with approved design with CM 1:6 mix 12 mm thick. In SF

70

-

694831

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Vibrated Reinforced Cement Concrete M-30 grade Mix as per Table 9 of IS 456 using 20mm size and 13.5/12.5mm (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of Seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) for Columns in TF

22

-

310348

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Vibrated Reinforced Cement Concrete M-30 grade Mix as per Table 9 of IS 456 using 20mm size and 13.5/12.5mm (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of Seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Lintels in TF

4.5

-

61629

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Vibrated Reinforced Cement Concrete M-30 grade Mix as per Table 9 of IS 456 using 20mm size and 13.5/12.5mm (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of Seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For 6 cm thick sunshades in TF

56

-

76322

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Vibrated Reinforced Cement Concrete M-30 grade Mix as per Table 9 of IS 456 using 20mm size and 13.5/12.5mm (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of Seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For beams in TF

34

-

429246

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Vibrated Reinforced Cement Concrete M-30 grade Mix as per Table 9 of IS 456 using 20mm size and 13.5/12.5mm (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of Seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Slab 15 cm thick in TF

535

-

888971

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Vibrated Reinforced Cement Concrete M-30 grade Mix as per Table 9 of IS 456 using 20mm size and 13.5/12.5mm (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of Seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Slab 18 cm thick in TF

22

-

41222

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Fly ash brick Masonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using second class traditional bricks of size 290x225x140 cm from approved quarry and having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including Seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). In TF

48

-

403057

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;supply and fixing in position contry wood doors, frame made with Malasia sal or nallamaddi for and commercial ply wood flush door shutter 35mm thick and using 100mmx75mm scantlings for frames and fixied the frame into the masonry by means of z_hold fasts not less than 6numers with necessary screws not less than 50mm length etc complete finished item APSS No 1001,1002

11

-

47672

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supplying and fixing in position Un-plasticised Poly Vinyl Chloride (UPVC)sliding windows three track-only two glass shutters sliding duly manufactured using UPVC reinforced profiles of (80 mm x 52 mm)/ (94 mm x 45 mm) x 2.0 mm for other frames (54 mm x 38 mm) / (39 mm x 58 mm) x 2.2 mm for sliding shutter frames capable of mounting single glazing system ,structurally reinforced with hot dipped galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated &welded through fusion welding the window shah shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with TPV gaskets /EPDM weathering seal resistant accessories like locking system 1 no per set of sashes and the system is to be installed at the site using anchor fasteners ,silicon rubber sealent easy glazing /deglazing at site etc ,.including transportation ,erection at site with templates for casement sizing complete for finished item of work as per item no Sl no 835 item code BMT-P-67 of SSR 2014-15

87

-

538706

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supply and fixing of M.S.Iron ornimental grills of approved design using 16 kgs per sq.m with all materials fabrication transport and labor charges as directed by the site engineer

87

-

144520

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Masonry work in CM (1:6) prop with Fly ash Cement solid blocks of size 230 x 100 x 65 mm for manufacturing of fly ash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour ,seiniorage charges, scaffolding and curing etc., complete with a compressive strength not lessthan 50 kg/sqm for walls for Superstructure Walls. Reinforced Brick wall of thickness 10 CM in TF

30

-

31237

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work APSS No 403 in TF

18000

-

1222380

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Plastering 12mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand , water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for external and internal plastering in TF

700

-

319651

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing Plastering to Ceiling 12mm thick in single coat in CM(1:3) including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including Seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) In TF

800

-

393337

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Vetrified tiles flooring with 1st quality of size 600x600 mm with double charged /multi charged stain free fully body porcelain ,, with double layer pigment and thickness 8-10 mm as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707) in TF

430

-

593046

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Ceramic tiles flooring 1st quality and of size as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707) In TF

15

-

16343

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing dadooing to walls with glazed coloured tiles 1st quality of size approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including Seigniorage charges etc., complete for finished item of work. In TF

50

-

51935

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

600

-

27110

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Painting with plastic emulsion paint of grade-1 standard make to interior faces of new walls two coat of approved make shade and colour over primer coat with cement primer grade - I including cost and conveyance of materials like Plastic Emulsion paint, white cement to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion etc., complete for finished item of work (APSS No.910, 911&1201) in all floors.

400

-

73972

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Painting with plastic emulsion paint of grade-1 standard make to external faces of new walls two coat of approved make shade and colour over primer coat with cement primer grade - I including cost and conveyance of materials like Plastic Emulsion paint, white cement to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion etc., complete for finished item of work (APSS No.910, 911&1201) in all floors.

500

-

96045

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing Enamel Painting two coats over base coat of primer paint with best quality of paints i,e, Asian, Berger paints. to New wood works etc complete APSS No 1201,1202

25

-

4639

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing Enamel Painting two coats over base coat of primer paint with best quality of paints i,e, Asian, Berger paints. to New Iron works etc complete APSS No 1201,1202

50

-

8960

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing High polished black granite planks flooring 16 to 18 mm thick upto 2.4 m length set over base coat of cement mortar (1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @3.3 kgs/m2 & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement , sand , water etc complete including seignior age charges etc., complete for finished item of work For 3rd Floor . (APSS NO . 701 & 707)

33

-

100344

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Half rounding the edge for granite and morbile stone planks after polishing the same etc and complete. For 3rd floor

43

-

15536

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Tiles cladding to walls with tiles for elevation with approved design with CM 1:6 mix 12 mm thick. In TF

70

-

727080

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing stainless steel hand railing with 316 Grade, 16 guage , 50 mm for top hand rail, 40mm die vertical support and 25mm dia Horizonral two lines as per the approved pattern and design as directed by the site Engineers for hand railing of 914mm(36") hieght above the finished floor level including cost of materials and conveyance to site, VAT Taxes and labour charges for all oprations etc., complete as per wuch as fabrication of hand railing drilling of holes in R.C.C Steps and finising of Handrailing leg reconnection etc., complete for finished item of work. The SS steel of 316 grade with lab test certificate should be prodiced as directed by the department

56

-

201600

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Nominal Mix (1:4:8) for column encasement column roof using 12 mm and 20 mm metal including all material and labour charges etc complete.

6

-

22916

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Fly ash brick Masonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using second class traditional bricks of size 290x225x140 cm from approved quarry and having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including Seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). In 4th Floor

38

-

339238

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Plastering 12mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand , water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for external and internal plastering in TF

260

-

127938

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. 20mm thick (average) mixing with water proofing compound from reputed manufacturers as approved by Engineer-in- charge at 1 Kg/bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost and conveyance of materials like cement, sand (screened), water proofing compound etc., to site, cost of Seigniorage charges and all other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work (APSS No. 901 & 903) in Fifth floor

530

-

351013

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Roofing: - Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove.

25

-

21587

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supplying, laying , jointing and testing 40 mm dia GI pipe line ISI make with necessary specialsetc.,including cost of pipes,fittings and labour charges etc.,complete

30

-

14268

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;S & F G I Union valve as per IS - 778 Class - I, Indian make heavy type - 38.1 mm NB Size

2

-

235

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 40 mm NB Size

1

-

2479

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supplying, laying , jointing and testing 32 mm dia GI pipe line ISI make with necessary specialsetc.,including cost of pipes,fittings and labour charges etc.,complete

30

-

12796

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;S & F G I Union valve as per IS - 778 Class - I, Indian make heavy type - 31.75 mm NB Size

3

-

294

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 32 mm NB Size

3

-

5487

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supplying, laying , jointing and testing 20 mm dia GI pipe line ISI make with necessary specialsetc.,including cost of pipes,fittings and labour charges etc.,complete

40

-

9744

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supply and fixing of PVC pipes and specials of ISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to requires size, jointing with PVC adhensive solution etc., complete as per SS and as directed by the departmental officers. For 110mm dia Pipe 4 Kg/ Sqm

140

-

42103

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supply and fixing of PVC ISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to required size, jointing with PVC adhensive etc., complete as per SS and as directed by the Departmental officers. For 110mm dia PVC plain bends

36

-

2864

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supply and fixing of PVC ISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to required size, jointing with PVC adhensive etc., complete as per SS and as directed by the Departmental officers. For 110mm dia PVC Single T

8

-

828

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supply and fixing of PVC ISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to required size, jointing with PVC adhensive etc., complete as per SS and as directed by the Departmental officers. For 110mm dia PVC door bends

8

-

828

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supply and fixing of PVC pipes and specials of ISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to requires size, jointing with PVC adhensive solution etc., complete as per SS and as directed by the departmental officers. For 75 mm dia Pipe 4 Kg/ Sqm

45

-

9135

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supply and fixing of PVC ISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to required size, jointing with PVC adhensive etc., complete as per SS and as directed by the Departmental officers. For 75 mm dia PVC plain bends

24

-

1146

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supply and fixing of PVC ISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to required size, jointing with PVC adhensive etc., complete as per SS and as directed by the Departmental officers. For 75 mm dia PVC door bends

8

-

519

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supply and fixing of PVC ISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to required size, jointing with PVC adhensive etc., complete as per SS and as directed by the Departmental officers. For 75 mm dia PVC plain T

8

-

573

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supplying and fixing European water closet of Hindustan / parry ware/ neycer make glazed with p trap with plastic seat and lid with rubber or plastic buffers including bolts with 8 lts pvc flush tank etc complete as directed.

8

-

35567

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supplying & Fixing Indian make Flat Back Wash Hand Basin1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain,32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock etc. completed

6

-

11546

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supplying and fixing 4" (101 mm ) Multi Flow Trap with Jali - UPVC/SWR Pipe etc with air tight joints etc complete as directed

14

-

1941

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;S & F angle stop cock 12.7 mm dia first quality Indian Make heavy duty

14

-

6764

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supplying & Fixing 12.7 mm PVC Nylon connection with brass union nut C.P coated etc., completed as directed

14

-

1477

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with a wall thickness of 5mm, made out of extruded 10 mm rigid PVC foam sheet, mitre cut at two corners and joined with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be fixed to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A minimum of 4nos. of screws to be provided for each vertical member & minimum 2nos. for horizontal member etc. complete as per manufacturers specification and direction of Engineer-in- Charge for finished item of work. Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail &bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item of work .

12

-

45089

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Providing & Placing on Terrace(at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks Makke Sintex.

2000

-

12280

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supply and fixing in position 12.7 mm dia NP short body taps heavy deluxe Indian make heavy type etc,. complete.

8

-

4921

... More
Construction of second floor and third floor over the existing first floor of innovation centre coll;Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm with screws etc completed.

6

-

3398



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.