Andhra University Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra University Tender
Civil And Construction
Building Construction
Opening Date20 Aug 2022
Closing Date29 Aug 2022
Tender Amount₹ 9,51,219
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
535290Bid Award Id
ViewTender No
UE/E-PTN(4)/AU/VSP/2022-23Tender Authority
Andhra University ViewPurchaser Address
-Website
http://https://www.andhrauniversity.edu.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Carpenters enaged for to remove and refixing the doors
4
-
3913
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Removal of plasterings and clearing the materials etc complete as directed by the department
110
-
963
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)
131
-
34890
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Plain Cement Concrete (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for foundations using 40mm size (SS5) hard,machine crushed granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations ramming in 15cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402)
17
-
57244
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Brick Masonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using second class traditional bricks of size 23x11x7 cm from approved quarry and having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). in Ground floor
4
-
27338
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Plastering 20mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for internal plastering in Ground floor
60
-
23494
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Plastering 20 mm thick in single coat in CM(1:3) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for internal plastering in Ground floor
25
-
10214
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Plastering 12mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for internal plastering in Ground floor
45
-
17020
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Brick Masonry for filling with CM (1:8) prop: (cement : sand) using second class traditional bricks of size 23x11x7 cm from approved quarry and having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). in Ground floor
5
-
27922
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Providing Drilling holes at an interval of 7"c/c up to depth of 23cm with necessary fixing compounds etc complete
100
-
15000
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Vibrated Reinforced Cement Concrete M-20 Nominal Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering using Casurina ballies, Bamboos, Wooden reepers, Runners, Wooden posts, Wall plates etc., as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) for Sunshades in Ground floor
3.5
-
3453
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Vibrated Reinforced Cement Concrete M-20 Nominal Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering using Casurina ballies, Bamboos, Wooden reepers, Runners, Wooden posts, Wall plates etc., as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) for Lintels in Ground floor
0.1
-
1095
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Plastering 12 mm thick in single coat in CM(1:3) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for internal plastering in Ground floor
15
-
5856
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;providing cement concrete (1:2:4) mix using 12mm Hbg metal mixing placing compacting curing etc complete inGround floor
2
-
10557
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Flooring with ceramic tiles 7.30mm thick ,of size 300x300mm 1st quality and of size as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707) in Ground floor.
21
-
20864
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Providing dadooing to walls with glazed coloured tiles 600x300mm 1st quality of size approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges etc., complete for finished item of work.inGround floor
93
-
95817
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work in ground floor.
60
-
3996
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Providing weather proof treatment in cm(1:3) mix 20mm thick using water proof compund at 1Kg per one bag of cement in First floor
23
-
10215
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Brick Masonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using second class traditional bricks of size 23x11x7 cm from approved quarry and having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). in First floor
4
-
30038
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Plastering 20mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for internal plastering in First floor
50
-
21490
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Plastering 12 mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for internal plastering in First floor
70
-
29152
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Brick Masonry for filling with CM (1:8) prop: (cement : sand) using second class traditional bricks of size 23x11x7 cm from approved quarry and having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). in first floor
4.1
-
23732
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Vibrated Reinforced Cement Concrete M-20 Nominal Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering using Casurina ballies, Bamboos, Wooden reepers, Runners, Wooden posts, Wall plates etc., as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) for Sunshades in First floor
3.5
-
3659
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Vibrated Reinforced Cement Concrete M-20 Nominal Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering using Casurina ballies, Bamboos, Wooden reepers, Runners, Wooden posts, Wall plates etc., as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) for Lintels s in First floor
0.25
-
2897
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Plastering 12 mm thick in single coat in CM(1:3) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for internal plastering in First floor
15
-
6721
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;providing cement concrete (1:2:4) mix using 12mm Hbg metal mixing placing compacting curing etc complete in first floor
1.5
-
8190
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Flooring with ceramic tiles 7.30mm thick ,of size 300x300mm 1st quality and of size as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707) in first floor.
20
-
20878
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Providing dadooing to walls with glazed coloured tiles 450x300mm 1st quality of size approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges etc., complete for finished item of work.in First floor
67
-
72404
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work in First floor.
55
-
3761
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supplying & fixing SINGLE PANEL 30 mm thick PVCDOOR, door shutters with shutter frame and Infill panelmade from PVC material, the shutter frame made out oPVC extruded sections having overall dimensions of 60mm x 30 mm with wall thickness of 1.3 mm ?} 0.3 mm,with the Infill panel made out of multi chambered seamlesshollow PVC extruded panel having overall dimensions of610 mm x 20 mm having wall thickness 1 mm ?} 0.2 mmwith the shutter frame meter cut and joined at corners andall the hardware locations reinforced with specialpolymeric bars as per drawing including providing specialPVC braket on hinge side, etc complete
3
-
10585
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Providing ornamental red brick Jalies 50mm thick with necessary materials etc complete as directed by the department
4.05
-
4253
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 8 litres capacity single flush PVC low level cistern Parryware or equivalent with internal components and fixed using required size of nails and screws, 12mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.
4
-
17784
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Senior/Nice or equivalent complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 400 gms Seiko or equivalent , 31.75mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit for finished item of work
4
-
7697
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader of overall size 95 x 95 x 57 mm conforming to IS:2556-Part6, Sec-6-1974 fixed with screws complete Indian make : 410 x 265 x 305 mm
4
-
11070
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supply & fixing towel rod (CP) of 24" long and 3/4 " dia
4
-
1550
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supply and fixing in position TV shape mirrors of plastic frame 606x457.2mm sixe with screws etc complete
4
-
2266
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supply and fixing the in position of 38.10mm cp Long body taps fancy type dulex indian make heavy type
8
-
4972
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;S & F NP soap dish heavy type with NP SCREWS
4
-
968
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;S& F12.7x 101.60 mm CP fancy shower rose
4
-
709
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;S& Fof 15mm dia shower control valve steel make
4
-
1800
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supplying and fixing of SWR PVC pipes110mm pvc (Prince/Sudhakar/Kisan/Supreme or any ISI brand)4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)
50
-
13902
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supplying and fixing of SWR PVC pipes75 mm pvc (Prince/Sudhakar/Kisan/Supreme or any ISI brand)4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)
60
-
12183
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;S& F 20 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete
45
-
10962
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;S& F 40mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete
36
-
17122
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;S& F GIunion 12.7 mm Ist Quality
16
-
691
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;S& F GIunion38.10 mm Ist Quality
4
-
469
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 40 mm NB Size
4
-
9916
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;75 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings
15
-
716
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;75 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings
15
-
972
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings
15
-
1551
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;110 mm dia - Single Tee with Door - UPVC/SWR Pipe fittings
10
-
1250
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;4" (101.6 mm ) Nahany Trap ( Without Jali with inlet)UPVC/SWR Pipe fittings
16
-
1509
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supply and fixing the 50mm dia PVC pipe Prince/Sudkhar/Kisan or equvilent make
8
-
480
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame andcover of 20 Kg.
8
-
29431
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supply of labour to attend the removal of Debris etc complete
15
-
10976
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Removal of debris by means of lorrys etc complete as directed by the department
6
-
15000
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Providing Double Scafolding to attend the repair works
150
-
9750
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;110 mm dia - Vent Cowl - UPVC/SWR Pipe fittings
2
-
37
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;75 mm dia - Vent Cowl - UPVC/SWR Pipe fittings
2
-
28
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Painting with plastic emulsion paint of grade-1 standard make to interior faces of new walls two coat of approved make shade and colour over primer coat with cement primer grade - I including cost and conveyance of materials like Plastic Emulsion paint, white cement to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion etc., complete for finished item of work (APSS No.910, 911&1201) in all floors. For Internal walls
275
-
74121
... More
Renovation of toilets at Vidya hostel north side and out side sanitary lines North campus Andhra Un;Supplying and fixing of SWR PVC pipes160dia mm pvc (Prince/Sudhakar/Kisan/Supreme or any ISI brand)4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, s including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)
115
-
57939
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements