Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender

Opening Date20 Aug 2021
Closing Date3 Sep 2021
Tender Amount₹ 77,71,133 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply and fixing of Kadapa slab (rough) 50mm thick and size of 0.457x0.457m stone edging including excavating trench in ordinary soil, laying P.C.C (1:4:8) 100 mm thick and fixing the stone in alignment and refilling the excavated soil conveyance of all materials and labour charges including transportation complete for finished item of work

190

-

26468.9

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply & Fixing Sadarhalli granite stone with 5 line dressing Double Patti of 5' length seating benches with back rest and its width 16'' with 4" thick and 18" height with 4" thick and leg size 4'' width, including cost and conveyance of all materials like granite benche, cement, sand to work site loading ,un loading transport and all operational, incidental labour & lift charges,and overheads & contractors profit complete for finished item

23

-

345000

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Filling with carted gravel in pathways, trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

399

-

264321.54

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Flooring with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colours (i.e. of shades like paradise / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)

66

-

246063.84

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Filling with dust in pathways with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

30

-

34828.2

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply of precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set over the 50 mm thick sand bed with hand roller compaction with joint neatly in homogeneous or heterogeneous pattern as the colour and pattern shall be as per the drawings furnished by the architect, including cost and conveyance of all materials like cement, sand, water, tiles, etc., to site including all operational, incidental, labour charges, laying tiles to required slope as directed by the Engineer- in-charge etc., and overheads & contractors profit complete for finished item of work

300

-

193446

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Flooring with Rough black Kadapa slabs minimum of 50 mm thick of size 0.457m x 0.457m set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work,. (APSS No.703 & 701)

70

-

43345.4

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contractor profit etc., complete for finished item of work. (APSS No. 501 & 504).

69.8

-

430689.73

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

96.5

-

31776.49

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Providing 0.30 m wide Coping with Polished black Kadapa slabs minimum of 25 mm to 30 mm thick in single piece as specified set over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including all labour charges like dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work (APSS No.703 & 701)

154.64

-

129459.97

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site,and all operational, incidental, labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

589.67

-

142930.11

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and , centring using Steel scaffolding pipes , jack props , Waller?s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

1

-

-

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;For Footings

16.58

-

138786.37

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;For Pedestals

12.09

-

108155.81

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;For Plinth Beam

25.72

-

280006.44

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and,including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

1

-

-

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;For Columns

14.28

-

151185.22

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, , curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

1

-

-

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;For Beams

2.53

-

23586

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overheads & contractors profit complete for finished item of work.( APSS No.126)

7344.3

-

473487.02

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Providing cladding to wall with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

49.86

-

186720.22

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site and complete for finished item of work

10555.97

-

969671.4

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid, including cost and conveyance of all materials like Red oxide primer, Synthetic Enamel Paint to site, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

485.2

-

86865.36

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water,Rough stone Through stone, Coursed stones etc., from approved quarry, to site, including labour charges for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing, charges for scaffolding etc., and overheads & contractors profit complete for finished item of work. (APSS No. 601 & 615)

70

-

276045.7

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, Roof Trusses by using MS solid plate section as per IS 1730 including cost of welding rods, power charges, labour charges for cutting, placing, welding & erecting in position and fixing cost & convenience of all materials including wastage to site and complete for finished item of work.

336.33

-

31285.42

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Vibrated Plain Cement Concrete M 20 Nominal mix using Concrete MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete , including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centring, shuttering, machine mixing, lift charges, laying concrete, vibrating, curing, overheads & contractors profit etc., complete for finished item of work (APSS No. 402 & 403)

26.58

-

164866.7

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, ,, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

543.22

-

241825.25

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Providing and applying PMCC / Deco orient base or Equivalent exterior Texture ( borders and design as per the pattern approved by the Engineer-in-Charge ) of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, scaffolding charges, overheads and contractors profit etc., complete for finished item of work in all floors for external walls

537.28

-

146038.08

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work (APSS NO.309&310)

17.82

-

6114.22

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Providing cladding to wall with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

11.7

-

43815.21

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply and fixing of cement bonded board 8 mm thick and laying as per the pattern approved by the Engineer-in-Charge on purlins, rafters, trusses, including cost and conveyance of all materials like approved cement bonded board, nails, labour charges , overheads and contractors profit etc., complete for finished item of work in all floors. excluding the cost of purlins, rafters, trusses.

30

-

23845.2

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Providing and laying of best tiled roofing with pressed clay (Mangalore tiles) size 225 x 150 x 20 mm thick and laying as per the pattern approved by the Engineer-in-Charge on roofs jointed with cement mortar 1:4 (1 cement : 4 coarse sand) mixed with 2% integral water proofing compound, laid over a bed of 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) including Rabbit wire mesh (Chicken mesh) of not less than 30 gauge and jointed neatly with white cement paste to full depth mixed with pigment of matching shade at required place including cost and conveyance of all materials like cement, sand, water, tiles, Rabbit wire mesh, white cement, wastage etc., to site including cost of all labour charges for mixing of cement mortar, scaffolding, lift charges, laying tiles to required slope as directed by the Engineer- in-charge , curing etc., and overheads & contractors profit complete for finished item of work.

33.85

-

48354.39

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Filling with carted coarse sand in play area, pathway, foundations bed and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental ,labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

327

-

240358.08

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Vibrated Plain Cement Concrete (1:3:6) nominal mix using 220 kg of cement and 20mm graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., and including all charges for Concrete Mixer, machine mixing, laying concrete in position, vibrating, curing, overheads & contractors profit etc., for finished item of work (APSS No. 402)

1.91

-

9444.38

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works ,Roof Trusses by using MS Flats as per SP:6(1) IS Hand book , including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials to site and complete for finished item of work

40.5

-

3790.8

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supplying and fixing G.I. Chain link fabric fencing of required width in mesh size 50x50 mm opening of 4 mm dia GI wire including strengthening with 2 mm dia wire or nuts, bolts and washers/welding in the MS angle frame/ RCC fencing posts as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental operational and all labour charges overheads & contractors profit etc., complete for finished item of work

79.75

-

59601.16

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply, Delivery, Installation and Commissioning of 1.5m x 2.2m size of FOUR SEATER SWING of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

2

-

97000

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply, Delivery, Installation and Commissioning of 6.5m x 1.5m size of FOUR SEATER ARC SWING of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

2

-

179754

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply, Delivery, Installation and Commissioning of Jungle Gym of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

1

-

68000

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;supply, delivery and commissioning of FRP Triple Slide of Arihant / Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work.

1

-

121963

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply, delivery and commissioning of Butter Fly swing of Arihant / Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work.

1

-

66480

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply, delivery and commissioning of 4 No?s Seats made with FRP Fibre Seats and fitted both ends of 50 MM Dia Pipe length8 Ft with Bolts & Nuts and both fitted on Horizontal Pipe 3? length and 60 mm Dia?U? shape (rivers) with clamps with fibre Seats of Arihant / Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work. Length : 2438 mm Width : 914 mm Height : 914 mm

2

-

80960

... More
Development of landscape (Hardscape) works in Singapore township Park (2.28 Acres) Kadapa, Andhra Pr;Supply, Delivery, Installation and Commissioning of 2.5m x 1.5m size of Rock cum net climber of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work.

1

-

52323



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.