Andhra Pradesh State Road Transport Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh State Road Transport Corporation - APSRTC Tender

Works
Opening Date27 Sep 2024
Closing Date3 Oct 2024
Tender Amount₹ 8,50,423 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
sectioning, tamping as directed with an initial lead of 10M and lift of 3M, etc. complete as directed by the

-

-

-

... More
Engineer-in-charge.

-

-

-

... More
SUPPLY AND FILLING OF CRUSHER DUST in foundations and basement in 150mm thick layers including watering

22.67

-

-

... More
compaction all incidental operational cost and conveyance of all labour and materials, etc.at site of work complete

-

-

-

... More
as directed by theEngineer-in-charge.

-

-

-

... More
PROVIDING and LAYING PLAIN CEMENT CONCRETE 1:5:10 Pro. (1cement:5sand:10metal) using 40mm gauge

9.07

-

-

... More
hard granite machine crushed metal and pure river sand confirm to IS 383-1970 in FOUNDATION and for BED of

-

-

-

... More
FLOORING including machine mixing, depositing in position, ramming, finishing curing including all incidental

-

-

-

... More
operational charges cost and conveyance of all labour and materials at site of work complete as

-

-

-

... More
directed by the Engineer-in-charge.

-

-

-

... More
RANDOM RUBBLE STONE MASONRY of Granite Variety in C.M 1:8 Pro.(1cement:8sand)

34.03

-

-

... More
in FOUNDATION and BASEMENT uincluding necessary dressing of stones,using pure river sand, cost of

-

-

-

... More
curing, incidental and operational charges cost and conveyance of all labour and materials, etc. at

-

-

-

... More
site of work complete as directed by the Engineer-in-charge.

-

-

-

... More
Providing and Laying RCC minimum strength of M 20 grade with minimum 330Kgs /1Cum of concrete using 20mm gauge

-

-

-

... More
hard granite machine crushed metal confirming to IS 456-1978 and river sand as fine aggregate including labour charges

-

-

-

... More
for centring, machine mixing, depositing in position, vibrating, ramming, finishing curing including all incidental operational

-

-

-

... More
charges cost and conveyance of all labour and materials etc.at site of work complete as directed by the

-

-

-

... More
Engineer-in-charge.(excluding cost of steel, binding wire and its fabrication) . .

-

-

-

... More
For Plinth Beams

3.03

-

-

... More
For Lintels

0.64

-

-

... More
Sunshades

5.64

-

-

... More
Supply & fabrication of HIGH STRENGTH TMT STEEL bars HYSD/ TMT grade FE 500 as per IS 1786-1979)

456

-

-

... More
including labour charges for cutting, bending to required sizes and shapes placing in position with cover blocks of

-

-

-

... More
approved size and tying with binding wire of 20 SWG, forming grills for reinforcement work as per approved designs

-

-

-

... More
and drawings, including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour

-

-

-

... More
charges such as lifting charges , cutting, bending, placing in position, tying, etc., complete for finished item of work

-

-

-

... More
(including overlaps and wastage)

-

-

-

... More
BRICK MASONRY with 2nd class bricks having a minium crushing strength of 35Kg/Sq.cm. as per IS 1077-1976 in

19.99

-

-

... More
superstructure for any thickness of WALLS in C.M 1:8 Pro.(1cement : 8 River sand) including soaking of bricks all

-

-

-

... More
incidental, operational, scaffolding, lift, curing charges, cost and conveyance of all labour

-

-

-

... More
and materials, etc. at site of work complete as directed by the Engineer-in-charge.

-

-

-

... More
CEMENT PLASTERING IN C.M 1:5Pro. (1cement: 5River sand) 20MM. thick including FINE RENDERING AND

139.3

-

-

... More
SMOOTH FINISHING curing, cleaning the surface including all incidental operational and scaffolding charges

-

-

-

... More
cost and conveyance of all labour and materials, etc. at site of work complete as directed by

-

-

-

... More
the Engineer-in-charge.

-

-

-

... More
CEMENT PLASTERING IN C.M 1:5 Pro. (1cement: 5River sand) 12MM. thick including FINE RENDERING AND

93.45

-

-

... More
SMOOTH FINISHING curing, cleaning the surface including all incidental operational and scaffolding charges

-

-

-

... More
cost and conveyance of all labour and materials, etc. at site of work complete as directed by

-

-

-

... More
the Engineer-in-charge.

-

-

-

... More
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together

12.96

-

-

... More
through their entire length and jointed together at the ends by end-locks, mounted on specially designed

-

-

-

... More
pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers,

-

-

-

... More
bottom locking plates and arrangements for inside & outside locking with push-pull operations

-

-

-

... More
including cost of hood cover and springs complete, painted with one coat of approved steel primer,

-

-

-

... More
locks, ball bearings, all accessories etc complete for finished item of work as per special specification 1108

-

-

-

... More
Supply and Fixing of Powder coated Aluminium two track Sliding Window using section of size 61.85x31.75x1.00mm for

5.76

-

-

... More
Window top and sides and 61.85x31.75x1.05mm section for window bottom and sliding shutters made with section of

-

-

-

... More
size 40x18x1.09mm with interlocking sections and mounted on nylon rollers and fixing with 4mm thick plain glass

-

-

-

... More
including cost of glass, rubber beading, including cost of fittings such as shutter locking handle and necessar hardware, all

-

-

-

... More
incidental, operational, charges, cost and conveyance of all labour

-

-

-

... More
and materials, etc. at site of work complete as directed by the Engineer-in-charge.

-

-

-

... More
Supplying and laying of Soluble salt porcelain Vitrified tiles screen printed and polished of size

20.23

-

-

... More
not less than 600 x 600mm and thickness between 8-10mm of 1st quality having uniform colour

-

-

-

... More
of approved make and texture conforming to IS 13711, IS 13712, IS 13630 (Parts 1 to 15) for

-

-

-

... More
FLOORING set in C.M 1:8 Pro. (1cement:8 River sand) 12mm thick and and laid with line and level

-

-

-

... More
using cement slurry at 3.30 kgs per square metre of area and pointing the joints with white

-

-

-

... More
cement mixed with coloured pigment to match with colour of tile including cost of all materials,

-

-

-

... More
labour charges, leads charges, incidental and operational charges, curing and cleaning etc., at

-

-

-

... More
site of work complete as directed by the Engineer-in-charge

-

-

-

... More
Providing Granolithic flooring 40MM thick in CC (1:1:2) prop. using 6MM to 8MM HBG metal with panels of size not

20.23

-

-

... More
exceeding 1.52 X 1.52 mts for each pane fixingl with glass including cost of all materials,

-

-

-

... More
labour charges, all incidental and operational charges, curing and

-

-

-

... More
cleaning etc., at site of work complete as directed by theEngineer-in-charge ( For open platforms).

-

-

-

... More
Supply, fabrication and erection of structural steel Box Sections of YST 210 grade

336.92

-

-

... More
conforming to IS 4923-1997 of any size as per design and drawing

-

-

-

... More
and painting all structural members with two coats of Aluminium Paint of work, all

-

-

-

... More
over Red Oxide Primer including cost and conveyance of all materials at site labour charges, welding, fabrication,

-

-

-

... More
erection and scaffolding charges, lift charges etc., complete as directed by the Engineer-in-charge .

-

-

-

... More
Supply and fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50 mm thickness , Coating:

70.97

-

-

... More
Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 Mpa, Paint coating: Regular Modified Polyester painting ,

-

-

-

... More
painting Thickness( Top): 18 to 20 Microns, ( Bottom): 5 to 7 Microns. Sheet width: 1.020, Length: Maximum 12

-

-

-

... More
Meters with Regular Range Colours. including cost of sheets, necessary accessories fixing materials hire charges

-

-

-

... More
of machinery, labour charges including all incedental and operational charges , taxes, etc complete for finished

-

-

-

... More
item of work as directed by Engineer-in-Charge.

-

-

-

... More
Supplying and fixing of MS Grill to windows using 40mm x 5mm MS flat alround and 10mm MS

5.76

-

-

... More
square bars both horizontally vertically at 100mm centre to centre including fixing with 4 Nos of

-

-

-

... More
MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original

-

-

-

... More
surface neatly and painting grill with one coat of red oxide primer including cost all taxes and

-

-

-

... More
conveyance of all materials including cutting, bending, welding including all operational charges

-

-

-

... More
and all labour charges etc., complete for finished item of work.

-

-

-

... More
Colour Washing two coats to walls in addition to priming coat

139.3

-

-

... More
approved quality including cost of labour charges for preparing and

-

-

-

... More
cleaning the surface and dirt with soap and brushes including putty

-

-

-

... More
cost, cost and conveyance of all labour and materials at site of work

-

-

-

... More
complete as directed by the Engineer-in-charge.

-

-

-

... More
White Washing two coats to walls with freshly burnt slacked shell lime

93.45

-

-

... More
or Suryacem or equivalent of approved quality including cost of labour charges for preparing and

-

-

-

... More
cleaning the surface and dirt with soap and brushes including putty

-

-

-

... More
cost, cost and conveyance of all labour and materials at site of work

-

-

-

... More
complete as directed by the Engineer-in-charge.

-

-

-

... More
Refilling of excavated earth in Foundations and Basement including

31.85

-

-

... More
spreading in layers watering compaction all incidental operational cost

-

-

-

... More
and conveyance of all labour and materials, etc.at site of work complete

-

-

-

... More
as directed by the Engineer-in-charge.

-

-

-

... More
PROVIDING and LAYING PLAIN CEMENT CONCRETE 1:2:4 Pro. (1cement:2 River sand:4metal) using 20mm gauge

2.52

-

-

... More
hard granite machine crushed metal and pure river sand confirm to IS 383-1970 in FOUNDATION and for BED of

-

-

-

... More
FLOORING including machine mixing, depositing in position, ramming, finishing curing including all incidental

-

-

-

... More
operational charges cost and conveyance of all labour and materials at site of work complete as

-

-

-

... More
directed by the Engineer-in-charge.

-

-

-

... More
PAINTING to new Iron Work Two coats with ready mixed Enamel paint of approved colour and

48

-

-

... More
quality including preparation of the surface, cost of brushes, cost and conveyance of all labour

-

-

-

... More
and materials, etc.at site of work complete as directed by the Engineer-in-Charge.

-

-

-

... More
Providing and fixing Thermocole False Ceiling in true horizontal level 600 mm x 600 mm using 12mm thick

20.23

-

-

... More
Thermocole sheet anodized Aluminium Tee sections of size 24.50 mm x 24.0 mm x 2.4 mm in grid

-

-

-

... More
with cross tee of size 24 x 24.5 mm at every 600 mm c/c and anodised aluminium

-

-

-

... More
wall angle of size 24 x 24 mm fixed to periphery of the wall and the above grid is suspended

-

-

-

... More
at every 1200 mm c/c in both directions using 2.0mm thick GI wire for finished of size 600 x 600 mm

-

-

-

... More
including cost & conveyance of all materials and labour charges such as cutting, fixing of

-

-

-

... More
standing of frame work exposing roof making complete for finished items of work

-

-

-

... More
(As per A.P.Revised Standard Data for Buildings)

-

-

-

... More
Cutting of groove of size 3"x3" in Brickmasonry with hand cutting machine for fixing of Galvalume sheet and

7.5

-

-

... More
providing plain cement concrete 1:1.5:3 prop.(1 Cement:1.5 Metal: 3 River sand) in the groove and with neat finish

-

-

-

... More
including all incidental and operational charges cost and conveyance of all labour and materials at site of work complete as

-

-

-

... More
directed by the Engineer-in-charge.

-

-

-

... More
Estimated Contract Value

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.