Andhra Pradesh State Road Transport Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh State Road Transport Corporation - APSRTC Tender

Civil And Construction
Building Construction
Opening Date20 Feb 2023
Closing Date27 Feb 2023
Tender Amount₹ 1,73,59,564 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Dismantling of damaged tiles

189.54

-

7961

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Dismantling of reinforced cement concrete

54.26

-

172286

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Labour charges for removing of MS windows

205

-

115825

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;TRANSPORTATION OF EXCAVATED SOIL

194.41

-

73940

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Labour charges for removing of rolling shutters

4

-

2260

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;SUPPLY AND FILLING OF SAND

65.48

-

70869

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;PROVIDING and LAYING PLAIN CEMENT CONCRETE 1:5:10

26.18

-

118760

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;BRICK MASONRY in CM 1 : 8 for First floor

19.94

-

158032

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;BRICK MASONRY in CM 1 : 8 for Second floor

19.94

-

166543

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;BRICK MASONRY in CM 1 : 8 for Third floor

19.94

-

175053

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;REINFORCED BRICK MASONARY with bricks for first floor

135.32

-

137168

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;REINFORCED BRICK MASONARY with bricks for second floor

135.32

-

148184

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;REINFORCED BRICK MASONARY with bricks for third floor

135.32

-

159201

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;PROVIDING REINFORCED CEMENT CONCRETE M20 grade for First floor

0.72

-

9371

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;PROVIDING REINFORCED CEMENT CONCRETE M20 grade for Second floor

0.72

-

9813

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;PROVIDING REINFORCED CEMENT CONCRETE M20 grade for Third floor

0.72

-

10255

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;CEMENT PLASTERING IN C.M 1:5 Pro. 20mm th. For First floor

618.73

-

271301

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;CEMENT PLASTERING IN C.M 1:5 Pro. 20mm th.for Second floor

618.73

-

294794

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;CEMENT PLASTERING IN C.M 1:5 Pro. 20mm th.for Third floor

618.73

-

318293

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supplying and laying of SOLUBLE SALT PORCELAIN VETRIFIED TILES for Flooring for First floor

836.2

-

875309

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supplying and laying of SOLUBLE SALT PORCELAIN VETRIFIED TILES for Flooring for Second floor

836.2

-

917487

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supplying and laying of SOLUBLE SALT PORCELAIN VETRIFIED TILES for Flooring for Third floor

836.2

-

959665

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supplying and laying CERAMIC TILES Flooring & treads for First floor

114.03

-

112858

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supplying and laying CERAMIC TILES Flooring & treads for Second floor

114.03

-

118609

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supplying and laying CERAMIC TILES Flooring & treads for Third floor

114.03

-

124361

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supplying and laying CERAMIC TILES Dadooing & Risers for First floor

235.65

-

131007

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supplying and laying CERAMIC TILES Dadooing & Risers for Second floor

235.65

-

133993

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supplying and laying CERAMIC TILES Dadooing & Risers for Third floor

235.65

-

136979

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply & fabrication of reinforcement steel bars

259.2

-

22623

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supplying and fixing of stainless steel hand railing(3'height) First floor.

39.2

-

142194

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supplying and fixing of stainless steel hand railing(3'height) Second floor.

39.2

-

142586

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supplying and fixing of stainless steel hand railing(3'height) Third floor.

39.2

-

142978

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Providing and fixing factory made uPVC white colour sliding glazed window.

604.3

-

4647067

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Providing and fixing 30mm thick Rajshri Brand factory made Moulded door shutter.

154.36

-

544543

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Emulsion painting two coats to Extearior walls with primary coat First floor

172.08

-

36825

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Emulsion painting two coats to Extearior walls with primary coat Second floor

172.08

-

40439

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Emulsion painting two coats to Extearior walls with primary coat Third floor

172.08

-

44121

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Emulsion painting two coats to Interior walls with primary coat First floor

230

-

37927

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Emulsion painting two coats to Interior walls with primary coat Second floor

230

-

41837

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Emulsion painting two coats to Interior walls with primary coat Third floor

230

-

45747

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Emulsion painting two coats to Ceiling with primary coat First floor.

70.71

-

12558

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Emulsion painting two coats to Ceiling with primary coat Second floor.

70.71

-

15302

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Emulsion painting two coats to Ceiling with primary coat Third floor.

70.71

-

16277

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing of 580mmx440mm long Orissa Pan White glazed water closet.

27

-

57110

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing 110mm dia single socket 4kg/sqmt SWR/PVC PIPES

300

-

93750

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing 110mm dia plain bend SWR/PVC PIPES

84

-

6468

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing 110mm dia Plain Tee SWR/PVC PIPES

36

-

3600

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing 90mm dia single socket 4kg/sqmt SWR/PVC PIPES

225

-

63023

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing 90mm dia plain bend SWR/PVC PIPES

84

-

5376

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing 90mm dia Plain Tee SWR/PVC PIPES

36

-

2700

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing ½" dia PVC Conectors

48

-

4560

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing 28.60 mm OD CPVC PIPES/Fittings

360

-

82440

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing 1" dia Ball valve CPVC PIPES/Fittings

27

-

12879

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Water tech taps

138

-

20700

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;T.V. shape Mirror

15

-

8322

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Angle cocks

48

-

21744

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing of white Glazed flat back bowl urinals of size 440x265x315 of Indain make

18

-

28933

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Labour charges for removal of damaged W.C

30

-

4500

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Labour charges for removal of damaged hand railing

3500

-

29400

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing of Indaian make flat back wash hand basin of size 630mm x 415mm

15

-

47724

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply, cutting and fixing of 0.60Mx0.45Mx1.05M sizes high polished Granite Urinal Partition.

15

-

42836

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing of European Water Closet white glazed with 'P' trap

12

-

58157

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Providing and laying of mechanically mixed unreinforced, plain cement concrete pavement 150mm

48

-

361613

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Providing ,Laying ,Spreading and compacting graded HBG crushed stone aggregate for Wet Mix Mecadam

80

-

232672

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Supply and fixing in position of 12.70mm thick premoulded Departmental Mastic pads

13.52

-

7152

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Engaging of Mechanical Excavator for levelling the yard.

12

-

14400

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Treatment to spalling/ damaged ceilling, beams etc. with Guniting and Sand Blasting 3rd.Floor

199.5

-

444326

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Treatment to spalling/ damaged ceilling, beams etc. with Guniting and Sand Blasting 4th.Floor

199.5

-

457633

... More
Certain developmental and improvements works in Ground Floor, First Floor, Second Floor and Third Fl;Treatment to spalling/ damaged ceilling, beams etc. with Guniting and Sand Blasting 5th.Floor

1371.18

-

3236945



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.