Andhra Pradesh Power Generation Corporation Limited Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender
Opening Date13 Feb 2025
Closing Date18 Feb 2025
Tender Amount₹ 7,81,900
Costs
EMD
₹ 4,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
785853Tender No
E-22/24-25 of CE/O&M/Dr.NTTPS(SE/O&M/CHP)Tender Authority
Andhra Pradesh Power Generation Corporation Limited ViewPurchaser Address
-Website
http://apgenco.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Restacking of Stator core (if necessary)
1
33000
33000
... More
Dynamic balancing of Rotor
1
66000
66000
... More
Fabrication of rotor fans
1
20000
20000
... More
Note:1. The firm has to quote their acceptable % excess/less on the above mentioned total amount for carrying out the subject work as & when required during the year 2024-25 as per the scope of work attached to this schedule
-
-
-
... More
2. The statutory appliances EPF , ESI shall be reimbursed subject to production of proof of acquittances and limited to the rates & rules applicable from time to time.GST will be paid extra as per the rates & rules applicable from time to time.
-
-
-
... More
3.If any deviation in quoting the tender by the tenderer will be liable for rejection
-
-
-
... More
4. The standard field quality plan should be enclosed to the tender enquiry by incorporating the clause that ”the contractor should submit the FQP duly signed along with the tender schedule
-
-
-
... More
5. FQP shall be approved by QC wing
-
-
-
... More
6. The contractor should engage sufficient man power for completion of the work within time as instructed by the Engineer In charge without fail or else necessary action will be initiated
-
-
-
... More
7)The scrap copper and other scrap material obtained from the old winding shall be retained by the contractor. In this connection, an amount of Rs.410/- per Kg plus applicable GST will be recovered from the bills and weight of the scrap copper is as mentioned below;In this case scrap copper 80% of weight will be (288Kg x Rs.410/Kg.) = Rs.118080/- + (18% of Rs. 118080)=Rs.21254.4). Total = Rs. 118080+21254.4=Rs. 139335/-
-
-
-
... More
sd/-
-
-
-
... More
CE/O&M/Dr.NTTPS
-
-
-