Andhra Pradesh Industrial Infrastructure Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Industrial Infrastructure Corporation - APIIC Tender
Civil And Construction
Road Construction
Opening Date22 Feb 2024
Closing Date28 Feb 2024
Tender Amount₹ 30,26,781
Costs
EMD
₹ 30,300Document Cost
Refer DocumentsTender Fee
₹ 2,360
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
715045Bid Award Id
ViewTender No
33/ZM/APIIC/VSP/2023-24, Dated: 21.02.2024Tender Authority
Andhra Pradesh Industrial Infrastructure Corporation ViewPurchaser Address
-Website
http://https://www.apiic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing, laying & consolidation 50mm thick Bituminous macadam with 40-60 TPH Batch mix HMP producing average output of 37.5 tonnes per hour using grade II crushed aggregate to the specified camber on prepared surface premixed with 80/100 grade bitumen binder @ 3.30% by weight of mix for base/binding course including F.E.Loader and hot mixing of stone aggregate and bitumen in hot mix plant, transporting the mixed material in tippers to paver and laying the mix using 100 TPH Mechanical paver finisher to the required levels, grade and alignment consolidating surface using vibratory roller, power roller of 8-10 T capacity and tandem roller to achieve desired density including hire and operational charges of all T&P, cost and conveyance of all materials,all taxes, Seigniorage charges, labour charges for all excluding cost of tack coat for finished item of work MORTH Spfn No: 504
20
155140
7757
... More
Providing and applying tack coat with bitumen Emulsion (RS1) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.
10988
153832
14
... More
Providing, laying & consolidation 25mm thick semi dense bituminous concrete on prepared surface with specified graded crushed aggregate grade II and 60/70 grade bitumen binder @ 5.0% of weight of mix for wearing course including loading aggregates with F.E.loader,heating & mixing the aggregate and binder in 40 - 60 TPH Capacity hot mix plant, transporting the mixed material with tipper and laying with 100TPH capacity Mechanical Paver Finisher to the required level, rolling with vibratory roller, power roller of 8 to 10 Tones capacity and tandem roller to achieve the desired density including hire and operational charges of all T & P all taxes, cost and conveyance of all materials,taxes, Seigniorage charges, labour charges for all operations, diversion of traffic,etc.,complete for finished item of work MORTH Spfn No: 508
274.2
2556915
9325
... More
(Rupees Thirty Lakhs Twenty Six Thousand Seven Hundred and Eighty One only)
-
-
-
... More
PART - II
-
-
-
... More
Note: The rates mentioned in Schedule "A" are including overhead charges & Contractors profit for Civil works.The overhead charges includes Labour Amenitites and Labour importation / Compensation / Site Supervision / Quality Control charges and Bankers Charges etc., Hence the contractors quoted percentage is inclusive of all the above including Technical persons and work insurance and no reimbursement for these will be made.The rates given in Schedule 'A' are exclusive of GST and Seigniorage charges.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements