Andhra Pradesh Industrial Infrastructure Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Industrial Infrastructure Corporation - APIIC Tender
Civil And Construction
Road Construction
Opening Date22 Feb 2024
Closing Date28 Feb 2024
Tender Amount₹ 8,87,342
Costs
EMD
₹ 8,900Document Cost
Refer DocumentsTender Fee
₹ 2,360
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
714912Tender No
31/ZM/APIIC/VSP/2023-24, Dated: 21.02.2024Tender Authority
Andhra Pradesh Industrial Infrastructure Corporation ViewPurchaser Address
-Website
http://https://www.apiic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of Granular sub-base by providing HBG material confirming to Grading - III of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.
150
316440
2109.6
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.
122
277306
2273
Providing and applying tack coat with bitumen Emulsion (RS1) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.
600
7200
12
Providing 25 mm thick compacted Semi-Dense Bituminous Concrete by hot mix plant using hard blasted granite crushed aggregates of Grading -2 as per table 500-15 of specification 508 of MoRT&H (4th Revision), premixed with bituminous binder 60/70 grade @ 5% of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 508 (4th Revision) complete for finished item of work in all respects as directed by Engineer-in-charge.
15.1
144038
9539
Construction of shoulders with gravel with side slopes 2:1 in layers over GSB including sectioning each layer to proper camber, watering, compaction with vibratory roller of 8-10t capacity including cost and conveyance of gravel to site and necessary lead and lifts seigniorage charges,all taxes, labour charges for all operations, hire and operational charges of power roller and other T&P etc.,complete for finished iten of work. MORTH Spfn No: 305
90
55368
615.2
(No. of BOQ Items: 08 (Eight only)
-
-
-
(Rupees Eight Lakhs Eighty Seven Thousand Three Hundred Forty two and Paise ten only)
-
-
-
PART - II
-
-
-
Note: The rates mentioned in Schedule "A" are including overhead charges & Contractors profit for Civil works.The overhead charges includes Labour Amenitites and Labour importation / Compensation / Site Supervision / Quality Control charges and Bankers Charges etc., Hence the contractors quoted percentage is inclusive of all the above including Technical persons and work insurance and no reimbursement for these will be made.The rates given in Schedule 'A' are exclusive of GST and Seigniorage charges.
-
-
-