Andhra Pradesh Industrial Infrastructure Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Industrial Infrastructure Corporation - APIIC Tender
Civil And Construction
Bridge Construction
Opening Date7 Nov 2024
Closing Date14 Nov 2024
Tender Amount₹ 22,48,752
Costs
EMD
₹ 22,500Document Cost
Refer DocumentsTender Fee
₹ 2,360
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
763642Tender No
19/ZM/APIIC/VSP/2024-25, Dated: 06.11.2024Tender Authority
Andhra Pradesh Industrial Infrastructure Corporation ViewPurchaser Address
-Website
http://https://www.apiic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Laying Plain Cement concrete (1:4:8) MIX USING 40mm size HBG machine crushed stone aggregate and fine aggregate and confirming to table 1000-2 of MORT&H including cost conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc, including all other incidental and operational charges of all T & P etc., complete for finished item of work as per MORT&H specification 1500, 1700 & 2100 (5th revision) and as directed by the Engineer-in-charge for foundations.
51
5355
273139.17
Providing HYSD bars ( Fe-500 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2300 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.
-
-
-
For raft
2
81145
162291.2
For side walls
5
81543
407715.5
For slab
4
84042
336169.6
Vibrated Reinforced cement concrete M 20 Grade using 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and labour charges, machine mixing, laying, Vibrating and curing etc., including all other incidental hire and operational charges of all T&P etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H Specification 1500, 1600, 1700, 2300(5th Revision) as directed by the Engineer-in-charge for culvert slab
-
-
-
For Raft
50
7148
357430
For side walls
47
7540
354389.4
For slab
32
8192
262172.8
Vibrated Cement Concrete M-30 grade using 20mm & 10mm HBG crushed stone aggregate with minimum cement quantity of 406 Kgs (coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T &P etc., complete for finished item of work as per drawing BD/1-69 (A) but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600, 1700 & 2702 (5th Revision) and as directed by the Engineer-in- Charge for wearing coat.
3
7401
22204.5
(No. of BOQ Items: 07 (Seven only)
-
-
2248751.57
(Rupees Twenty Two Lakhs Forty Eight Thousand Seven Hundred and Fifty Two only)
-
-
-
PART - II
-
-
-
Note: The rates mentioned in Schedule "A" are including overhead charges & Contractors profit for Civil works.The overhead charges includes Labour Amenitites and Labour importation / Compensation / Site Supervision / Quality Control charges and Bankers Charges etc., Hence the contractors quoted percentage is inclusive of all the above including Technical persons and work insurance and no reimbursement for these will be made.The rates given in Schedule 'A' are exclusive of GST and Seigniorage charges.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements