Andhra Pradesh Industrial Infrastructure Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Industrial Infrastructure Corporation - APIIC Tender
Civil And Construction
Road Construction
Opening Date6 Mar 2024
Closing Date11 Mar 2024
Tender Amount₹ 24,19,390
Costs
EMD
₹ 24,200Document Cost
Refer DocumentsTender Fee
₹ 2,360
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
730245Tender No
53/ZM/APIIC/VSP/2023-24 dt.06.03.2024Tender Authority
Andhra Pradesh Industrial Infrastructure Corporation ViewPurchaser Address
-Website
http://https://www.apiic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing mural arts decorative theme on the walls for giving visual feel to the visitors,tourists etc., including overall through cleaning of surface of old surface of the walls painting one primary coat using 1st quality cement primary exterior variety and two coats of acrylick emulsion medium of APEX ultima protek,wether proof exterior paintings as per directions of concerned officials of APIIC and as per approved design etc,including cost of all materials ,tools artists/painters charges,labour charges,scaffolding etc and conveyance of all materials to site etc complete as directed by the department Engineer-in-charge .
15699.68
863482
55
... More
Brick masonry for Basement all thickness in CM(1:6) prop. Using Fly ash bricks of size 290 x 112/100 x 140 mm obtained from approved source having crushing strength not less than 50kg/sqcm and water absorption not exceeding 20% by weight ,including cost,seigniorage and conveyance of all materials like cement,sand,bricks,water etc., to site including all labour charges like mixing cement mortor,wall construction, scaffolding charges,curing etc., complete for finished item of work for all heights. Unit 1 Cum
106
630755
5950.52
... More
Plastering 12mm thick in brick masonry walls in two coats, base coat in CM(1:5) 8mm thick and top coat in CM(1:3) 4mm thick with sponge finishing for smoothing including cost, seiniorage and conveyance of all materials like cement, sand, water etc., to site all labour charges for mixing cement motar finishing for all operations, all taxes curing etc., complete for finished item of work and as directed by the Engineer-in-Charge.
770
458920
596
... More
(Rupees Twenty Four Lakhs Nineteen Thousand Three Hundred and Ninety only)
-
-
-
... More
PART - II
-
-
-
... More
Note: The rates mentioned in Schedule "A" are including overhead charges & Contractors profit for Civil works.The overhead charges includes Labour Amenitites and Labour importation / Compensation / Site Supervision / Quality Control charges and Bankers Charges etc., Hence the contractors quoted percentage is inclusive of all the above including Technical persons and work insurance and no reimbursement for these will be made.The rates given in Schedule 'A' are exclusive of GST and Seigniorage charges.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements