Agricultural Marketing Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Agricultural Marketing Department - AMD Tender
Building Construction
Opening Date5 Jul 2021
Closing Date19 Jul 2021
Tender Amount₹ 27,48,819 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 5,200
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
422098Bid Award Id
ViewTender No
2/E-pro/Dy.EE/EE(AM)/VSP/2021-2022, Date. 29.06.2021Tender Authority
Agricultural Marketing Department ViewPurchaser Address
-Website
http://http://agricoop.nic.in/divisiontype/agricultural-marketing
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc., but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Centering Scaffolding, Shuttering for FOOTINGS
10
-
76119.3
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc., but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Centering Scaffolding, Shuttering for PLINTH BEAMS
11
-
108626.54
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for COLUMNS
7
-
70610.82
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for LINTELS
0.8
-
8226.14
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Wooden Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for Sun Shade/Chajja of Slab Average thickness of 62.50mm
17
-
12389.77
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for BEAMS
5
-
49334.75
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for SLAB 125mm thick
120
-
143042.4
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;SF HYSD bars (Lap splicing) - Providing High Yield Strength Deformed (HYSD) (Fe 415 grade as per IS 1786-1979) of different d iameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for rein forcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying excluding sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
5
-
359085.9
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc, complete for finished item of work all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., but excluding seigniorage charges complete for finished item of work or as directed by Engineer-in-Charge. (APSS No. 901 903).
120
-
47004
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Brick Masonry in CM (1:6) with Bricks with traditional size 23 x 11 x 7 cms 2nd class: Brick Masonry 230 mm thick with Cement Mortar (1:6) prop. (Cement:Sand) using Common Burnt Clay Bricks Non-Modular of traditional size 23 x 11 x 7 cm 2nd Class from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., but excluding seigniorage charges, complete as per drawing and Technical specifications cluase APSS 504 for finished item of work or as directed by Engineer-in Charge for panel walls in Super-Structure, parapet walls.
75
-
463224.75
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T P etc., complete for finished item of work. (APSS NO. 309 310) - Earth filling (ordinary soil)
50
-
1916
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Providing concrete for plain concrete in open foundations using 40 mm Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 1203 MORD - P.C.C grade M 20 - Nominal mix 1:2:4 (Hand mixed) (MORD)
0.33
-
1534.77
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs , set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water, tiles etc., and including all operational incidental charges and all labour charges etc., complete, but excluding seigniorage charges, for finished item of work or as directed by the Engineer-in-Charge
75
-
69473.25
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Providing skirting to internal walls to 10/15 cm height/risers of steps with Non-skid red or white full body Ceramic floor tiles of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs and length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand, water and tiles etc., and including all operational incidental charges and all labour charges etc., complete, but excluding seigniorage charges, for finished item of work or as directed by the Engineer-in-Charge
10
-
7428.9
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water, tiles etc., and including all operational incidental charges and all labour charges etc., complete, but excluding seigniorage charges, for finished item of work or as directed by the Engineer-in-Charge
5
-
4252.25
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Dadooing to walls with Glazed full body porcelain wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:5) 12 mm thick with neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand, water and tiles etc., and including all operational incidental charges and all labour charges etc., but excluding seigniorage charges, on materials,complete as per drawing and technical specifications for finished item of work or as directed by Engineer-In-charge.
20
-
16102.6
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Plastering 12 mm thick in single coat in CM (1:3) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.
110
-
32368.6
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Plastering 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.
310
-
87494.4
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Plastering 20 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.
415
-
122968.65
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Filling with Carted Gravel in trenches, sides of foundations basement from approved quarry consolidating deposited layer by watering and ramming, including all operational, incidental, labour charges, complete including cost and conveyance of sand / gravel for finished item of work. (APSS No 309 310).
50
-
15987
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Painting to new iron works with 2 coats of synthetic enamel paint of approved brand and shade over 1 coat of red oxide primer of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 1212 SS 1207 or as directed by the Engineer-In-Charge
30
-
4747.2
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Painting to new walls with 2 coats of water proof cement paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete as per SS 912, SS 1207 for finished item of work or as directed by the Engineer-In-Charge for internal walls
835
-
156253.55
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Providing Placing on Terrace(at all floor levels) polyethylene water storage tank with Double layer approved brand manufacture with cover and suitable locking arrangement making necessary holes for inlet outlets and over flow pipes but without fittings base support for tanks
1000
-
5680
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supplying Fixing Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 25 mm NB Size
2
-
2388.18
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supplying Fixing Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 20 mm NB Size
2
-
1665.6
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supplying Fixing 12.7 mm N.P bib tap Indian make heavy dutys
5
-
1982.6
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supplying Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain,32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Double C.P. Pillar cock
2
-
5796.64
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply, Installation and commissioning approved make floor mounted Close coupled EWC suit CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of approvedmake with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects:White Colour
1
-
9384.6
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and Fixing of door with salwood frame of 75 x 100mm and 35mm thick solid bond wood block board type with teak ply on both faces with shutter such as 'Z' hold fast, 6 No's hinges 150mm long, 2 Nos Aldrop 300mm long, 1 No's Tower Bolt 150mm long and fixtures to door with required number of screws, bolt and nuts includigng labour charges for fixing the shutter to the frame etc., complete for finished item of work.
13
-
48714.9
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Providing and fixing factory made uPVC white colour sliding glazed door comprising of uPVC multi-chambered frame with in-built roller track andsash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanizedmild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension uPVCextruded glazing beads, uPVC extruded interlock and uPVC extrudedInline sash adaptor (if required), EPDM gasket, wool pile, zinc alloy(white powder coated) handle with key on one side of extreme panels along with zinc plated mild steel multi point locking having transmissiongear with keeps, zinc alloy (white powder coated) cresent lock (ifrequired), stainless steel (SS 304 grade) body with adjustable doublenylon rollers (weight bearing capacity to be 120 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steelscrews etc. Profile of frame & sash shall be mitred cut and fusion weldedat all corners,
10
-
79485.1
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supplying and fixing of Fixed Louvered Ventilators made of pre - painted steel (base steel as per IS 513 of -0.58 mm thick 'D" quality, galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer, The section for louvered ventilators should be of of 33 x 56 mm Box section paneled with 4 mm pinhead glass with Ethyl propylene Diamine monomer Gask et (EPDM) and the sections cut to length mitre joined with corner bracket . corner brackets made of CRCA with Zinc Phosphate. The frames to be fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6" pitch complete for finished item of work.Ventilators: Fixed louvers 2'-0" x 2'-0" (609.6x609.6mm)(Box section) outer frame section size of 33 x 56 mm BMT-P.13
2
-
9784.52
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and fixing in position M.S Grill For Windows using 25 mm M.S flat alround, Vertical & Horizontal members with 10 mm MS square rods (Ver -13 &Hor-13) etc., of approved design weighing, including necessary cuttings, bending, fabrication, welding grinding, and finishing smooth including cost of making holes in RCC or Masonry works and making good the same where ever necessary, including cost and conveyance of all materials, labour charges and all other incidental and operational charges etc ., complete as directed by the departmental officers.
6
-
17692.86
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and fixing in position M.S Grill For Ventilators using 25 mm M.S flat alround, Vertical & Horizontal members with 10 mm MS square rods etc., of approved design weighing, including necessary cuttings, bending, fabrication, welding grinding, and finishing smooth including cost of making holes in RCC or Masonry works and making good the same where ever necessary, including cost and conveyance of all materials, labour charges and all other incidental and operational charges etc., complete asd irected by the departmental officers.
4
-
3822.36
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and fixing in position M.S Grill For Verendah Grill Gate using 40 mm M.S Angular alround for frame, 25 mm MS Angular for Alround Shutter Vertical & Horizontal members with 10 mm MS square rods etc., of approved design weighing, including necessary cuttings, bending, fabrication, welding grinding, and finishing smooth including cost of making holes in RCC or Masonry wor ks and making good the same where ever necessary, including cost and conveyance of all materials, labour charges and allo ther incidental and operational charges etc., complete as directed by the departmental officer
1
-
23281.15
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and fixing in position M.S Grill For MS Main Gate using 40x40 mm M.S Tubes alround for frame, 40x25 mm MS Tubes for Shutter Vertical & Horizontal members with 10 mm MS square rods etc., of approved design weighing, including necessary cuttings, bending, fabrication, welding grinding, and finishing smooth including cost of making holes in RCC or Masonry wor ks and making good the same where ever necessary, including cost and conveyance of all materials, labour charges and all other inciden tal and operational charges etc., complete as directed by the departmental officers.
1
-
14463.08
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Manufacture, Supply and Delivery of Unplasticised PVCs pipes 25mm dia for 10Kg/Sqm mportable water supplies confirming to IS : 4985 / 2000 (3rd revision) with bell ends (Socket) as per specification in light (Grey / Natural Ivory Grey / Any other color (except white) inclusive of transportation to the sub divisional stores anywhere in Andhra Pradesh excluding taxes.
30
-
2010.9
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Manufacture, Supply and Delivery of Unplasticised PVCs pipes 20mm dia for 10Kg/Sqm portable water supplies confirming to IS : 4985 / 2000 (3rd revision) with bell ends (Socket) as per specification in light (Grey / Natural Ivory Grey / Any other color (except white) inclusive of transportation to the sub divisional stores anywhere in Andhra Pradesh excluding taxes.
50
-
2783.5
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Random Rubble Stone masonry in CM (1:6) prop: (cement : sand) using hard Granite stones, bond stones from approved quarry to site in cluding cost and conveyance of all materials like cement, sand water, granite stones, bond stones, etc., and including labour for cu tting stones to required size and shape, mixing of cement, mortar, Scaffolding charges, curing etc., complete but excluding seignior ages charges, as per drawing and technical specifications and as directed by the Engineer-in-Charge for finished item of work (APSS No. 615 & 601)
16
-
59389.76
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh nominal reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost conveyance of all materials like cement, wire mesh, water to site, and including all operational incidental charges, centering, scaffolding and form work, lift charges, all labour charges etc., but excluding cost of steel its fabrication charges, seigniorage charges, sales other taxes on all materials, complete as per drawing and technical specifications clauses APSS No.403 903 for finished item of workor as directed by Engineer-in-Charge.
13
-
28302.17
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Drilling of bore wells by down the down hammer to a finished diameter of 163 mm in all formations/ stratas such as medium hard rock formation etc., including drilling in over burden soils to a diameter of not less than 200mm including insertion of 180mm diameter including the insertion of unplasticized PVC pipe with working pressure not less than 6kg.sq cm as casing pipe confirming to IS specification No. 4965/1988 with ISI mark upto a depth as directed by the department and flushing 8hrs for de velopment, conducting yield test including transportation of building rigs, supporting vehicles, and including crew charges and all other charges required for fixation of pipe assembly complete all done to the satisfaction of department and as stipulated in the technical specification enclosed to these schedule but excluding the cost of PVC casing pipes, couplings and cap, the entire work should be carried out as per IS 2800 part I and II/1979. The rate is inclusive of all taxes and for finished
70
-
28233.1
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and delivery of 180 mm diameter PVC pipes with working pressure of 6Kg/Sqcm as casing pipe for borewells confirming to IS specification No.4958/1988 with ISI mark. The rate is inclusive of Cost and conveyance of all materials to work site and all labour charges, all taxes etc., complete for finished item of work.
16
-
11397.92
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Casing Pipes and Bore caps excluding taxes - 160/180 mm dia PVC Casing pipe perforation charges per RM
1
-
369.25
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and delivery of 140 mm diameter PVC pipes with working pressure of 6Kg/Sqcm as casing pipe for borewells confirming to IS specification No.4958/1988 with ISI mark. The rate is inclusive of Cost and conveyance of all materials to work site and all labour charges, all taxes etc., complete for finished item of work.
70
-
29903.3
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Labor charges for slotting of PVC Pipes including all labor charges and slotting as per direction of departmental officers etc., complete for 112 to 165 mm dia bore wells rate as per prog no 792/borewells/2018/AE5 dt 10/10/2018 of District Collector, Visakhapatnam
25
-
5964.75
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Provision for site investigation and water exploration by geo physical method for ascertaining soil strata location and yield strength of proposed borewell.
1
-
2500
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;ELEC-5.4.1.e Supply and Transportation of ???.., 5star rated submersible motor pumpset, confirming to IS 8034 and motor confirming to IS 9283 with water proof winding,Pump shall be suitable for various delivery head and discharge with stainless steel shaft.Motor suitable for working on 240V ± 10% , SinglePhase 50 Hz AC supply,etc complete for 4" Bore well. 2.00HP 25 Stage Makes: Kirloskar / Crompton / Texmo / CRI / KSB/Lubi/ PSG/Aryen Varsha
1
-
27608.45
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;ELEC-5.4.16. Fabrication , transportation and supply of suitable size panel board for single phase submersible motor 2 to 3HP consisting of relay, Contactor, starting and running capacitors, Voltmeter, Ammeter, indicator lamps, MCB , on/off switch including supply and fixing of DOL starter of make CS/LTLK/Seimens/BCH/Crompton. complete.,.
1
-
6816.9
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Manufacture, Supply, Delivery , Laying & jointing of OD 32MM PE 80 Greded Material 12.5Kgs HDPE Pipes conforming to IS 4984 - 1995 including transportation to anywhere in A.P, excluding all taxes Makes : Sudhakar / Reliance / Duroline / Premier / Vijaya /Godavari.
110
-
9622.8
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;ELEC-1.6.3.c Supply of 3 Core?4.0 Sqmm?. Flat Copper cable of ISI for Submersible Motors confirming to IS:694:1990. Makes: Finolex / Polycab / Havells / KEI/Gloster
50
-
7101
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supplying fixing Gunmetal (GM) Horizontal Check (Non return) Valve as per IS-778 I-class heavy duty - 50 mm NB Size
1
-
2894.91
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and Fixing of ISI 25mm outer dia medium (1.80mm thickness) grade with IS:9537 part 3 regid FRLS PVC pipe on surface of wall with PVC junction boxes fixing on chromium plated metallic base saddles including all required materials and labour charges etc., complete for run of mains. Makes : Precision/Universal Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Anchor/ Polyline/ Polycab/Orbit/ AKG
90
-
6448.5
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Wiring with 2 runs of 14/0.3mm (1.0 Sqmm) Fire Retardant PVC insulated flexible copper cable (ISI Mark) in existing pipe with 6A Switch, Ceiling rose and 3mm thick hylem sheet covering to switch control box inlcuindg all labour charges etc., complete For Light point as per standard data.
40
-
19066.8
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and fixing of 6A ISI mark Flush type switch with 6A 3/2 pin wall plug socket on a common switch board with earth connections in surface wiring including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B. Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/Anchor
10
-
1288.1
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and fixing of ISI mark batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40W-60W Lamp (for new installation) Accssories Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/Anchor. Lamp Makes: Phillips / Crompton / Bajaj / Surya / Havells / Style Lamp / Capart
5
-
377.75
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and fixing of DB with 1 No 20A single phase plug and Socket, in sheet steel enclosure with 1 No 10A to 20A 10 KA SP MCB including internal connection and labour charges for Flush Mounting etc., complete. Makes: ABB/Standard / Havells-euro II / HPL (Techno) / Indo Asian / CS / LT/GM /Gold Medal/Anchor/Salzer. MCB Makes: ABB- S200/Standard / Havells-euro II / HPL (Techno) / Indo Asian / C S /LT-Exora/ GM /Gold Medal/Anchor/Salzer
2
-
3147.14
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and Run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., completecopper cable Makes: Finolex / RR kabel / Havells /KEI
170
-
13984.2
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and Run of 2 of 22/0.3mm (1.5 Sq.mm)FRLS / HFFR / ZHFR P.V.C. insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete copper cable Makes: Gloster/ Polycab / Bonton / V-Guard / GM / Million / HPL / Goldmedal / Finecab /Fortune Art / Kundan cab/Sudhakar/Orbit/Standard/Tamra/Anchor
230
-
10467.3
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and Run of 2 of 56/0.3mm (4.0 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete copper cable Makes: Finolex / RR kabel / Havells /KEI
70
-
7802.2
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;ELEC-1.7.1.l Supply of ? Stepped type Electronic Regulator... Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/Anchor
10
-
2045.1
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply, Transportation and fixing of 1x36/40W Patty type tube light luminaire with powder coated CRCA sheet steel housing with Copper Ballast Including 1 No 4' - 40W tube fixing on wall / ceiling on TW round blocks and all standard accessories Makes: Crompton / Bajaj /Halonix/ Surya / RK / Million / Gold Medal F T Lamp makes: Phillips / Crompton / Bajaj / Surya / Style Lamp / Capart
17
-
7805.04
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply, Transportation and Fixing of 48 inch (1200mm) Sweep ISI mark Ceiling Fan as per IS 374 - 1979, with double ball bearings, po wer input not more than 50W, air delivery more than 200 cubic meter/min but without Regulator including all standard accessories and all labour charges etc., complete. Makes : Crompton / Bajaj Kassels 50 / Usha atom
10
-
24634.6
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Providing independent earthling by excavating a pit to a depth of 2.25Mt in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary No.8 G.I. double earth wire and accessories with 18" dia 2" thick hume pipe ring duly providing staggered holes including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder in layers and all labour charges etc., complete.
1
-
3920.63
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply and fixing of 8 Way VTPN DB with IP 43 Protection suitable for TP/SP out goings and for 1 No 4 pole Incomer etc complete as per IS 8623; IS 13032; IEC 61439-3 with 1 No 100A FP Isolator and 8 Nos 6-32A 10KA TP MCB, C/D Curve ISI Mark including internal connections and labour charges for SURFACE Mounting etc., complete. . DB Makes: Legrand(Ekinox 3) / Schneider-Acti9/Hager -Novello+/ Seimens/Crabtree Xpro classique-II/LT-Newrange .Isolator MCB Makes:Legrand-DX3 / Schneider-Acti9/Hager-h3/ Siemens-5SX4/ Crabtree-Xpro/LT-AU
1
-
21774.32
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Supply, Transportation and fixing of 20W LED Street light Luminaire made of pressure diecast aluminium body with powder coated, havi ng protective toughened glass, Supply Input voltage 120 -270 V AC, P.F > 0.90, high power LED's System efficiency >95 lm/W and junct ion temperature < 70°C, with Ingress protection IP65, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge prot ection 4KV, external Surge protection = 5KV with optics distribution , THD<10% at 110 Volts AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., all standard accessories including 1.0 Mtr 25mm dia 'B' Class GI pipe bracket, anti tilting MS flat in cluding connections etc., complete. .a) Luminaire Make : WIPRO / PHILIPS (GREEN LINE )/ Lighting Technologies(Adornis) / SCHREDER (B RIKLA) /GE / VIN (MATRIX) / CROMPTON (HAWK) /BAJAJ (EDGE+) / HALONIX (LUMOS-SUPER) /HAVELLS (ENDURA CITYLINER )b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG
2
-
5942.52
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;ELEC-4.1.1.g Supply and transportation of following XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I)./1554-I??? 25 SqmmX 3.5 core Makes: Torent / Universal / Unicab / Havells / KEI / Gloster / Polycab
100
-
23859
... More
Construction of Vetrinary Dispensary (VD) with Compound Wall at Rachapalli (V), Makavarapalem (M) in;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD - Cement Concrete Pavement 1st Revision
30
-
179061.6
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements