Ajj-jtj Section: Rebuilding Of Bridge No 514 Up Line (span 7x9.6+5x19.6+7x9.6m) With Psc slab And Duly Strengthening Of Substructure By Jacketing Work And Wells Foundation (5 Nos) - reg
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
MAS30OF24193W-CHENNAI DIVISION-ENGINEERING/SOUTHERN RLYTender No
MAS30OF24193WTender Authority
Southern Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Transpoting of steel cribs for staging initial lead upto 20km
300
1367
410271
... More
For every addtl. Km (or) part there of beyond initial lead of 20km
60000
12
745800
... More
Casting of precast post tension PSC SLAB 12.2m span bridge (4 units) at the site without obstructing the waterways as per Drg No:RDSO/B-10271 & RDSO/B-10271/1 and as per specification of prestressed concrete work laid down in IRS Concrete Bridge Code as directed by Engineer-in-charge of the work over suitable steel cribs staging as required for casting and stressing, including providing suitable PCC/ Concrete slabs for the staging if required and lifting arrangements as per approved dawing with all labour, tools and plant, machineries,PCC/concrete slabs, steel crib staging arrangements, materials such as shuttering, wooden planks, 7 wooden cut blocks ,cement and steel reinforcement steel,sheathing for cable duct, binding wire,stressing equipment,stressing jacks stressing crew,HTS wires,bearing cones, wedges &other incidental materials and items including provision and arrangements for surface vibrators , shutter vibrators and needle vibrators etc complete.( one span contains 4 PSC slabs). (All labour, tools and plant, shuttering, supporting materials, cement, reinforcement steel , HTS wire, stressing jacks, stressing equipments etc to be supplied by Contractor/Tenderer only at his own risk and cost) Note: Steel cribs rental charges to be borne by contractor as per existing railway rates.: This item includes casting of base slabs/ concrete bases over which steel cribs staging to be erected for suitable height for casting of RCC retainers.Steel cribs rental charges to be borne by contractor as per existing railway rates. steel cribs to be properly secured after completion of the work. Note: each unit denotes "Each span
5
2314748
11573743.3
... More
Casting of precast RCC retainers of 12.2m span bridge at the site of work as per Drg No: RDSO/B- 10271/1 and as per specification of concrete work laid down in IRS Concrete Bridge Code over suitable steel cribs staging for casting of RCC retainer with Railway's steel cribs without obstructing waterway including providing suitable PCC/ Concrete slabs for the staging if required and lifting arrangements as per approved dawing and as 8 directed by the Engineer in charge of the work with all labours, tools and plants, machineries, materials including cement and steel etc., complete.( one span consists of two numbers of RCC retainers). (All labour, tools,materials, road vehicles, consumable stores, crew etc., are to be supplied by theContractor only at his own cost) Note: Steel cribs rental charges to be borne by contractor as per existing railway rates.Note: This item includes casting of base slabs/ concrete bases over which steel cribs staging to be erected for suitable height for casting of RCC retainers.Steel cribs rental charges to be borne by contractor as per existing railway rates. steel cribs to be properly secured after completion of the work. Note: each unit denotes "Each span
5
672828
3364144.8
... More
Casting, Pre cast post-tensioned pre-stressed SLAB SEGMENTS of specified span and using M 45 or higher grade of DESIGN MIX Concrete of 20mm graded stone aggregate as per the specifications prescribed in 9 the special conditions and railway's approved design for super structure. The cost shall include all labours, materials, steel shuttering with proper sufficient thick of steel plate. However the cost shall exclude the cost of cement, HTS wire, tensioning reinforcement steel etc., which will be paid separately under relevant Annexure. Note:1.Payment will be restricted to 80% of the accepted rate for the item will be paid after casting the SLAB SEGMENTS and the balance 20% after completion of launching of the SLAB SEGMENTS in traffic span to the satisfaction of Engineer - in - charge.
700
14918
10443279
... More
"Isolation of track as per site condition and as ordered, Removal of existing steel Girder along with Running rails, Guard rails, sleepers and fittings from span under LB/PB and stacking at nominatted location 10 including channel sleepers, Running Rails, Guard rails and other fittings stacking near the approach of any Manned Level crossing available near the bridge location/any other nominated location so as to load the girder into the the trailor without any infringement to the track and road users and as directed by the Engineer in charge. (All labour, materials, tools, hiring of road cranes including mobilisation charges, crew, fuel, consumable stores etc. and any other incidental works and charges are to be borne by the tenderer/ contractor at his own cost only). "
450
3600
1620000
... More
Trucking out of released materials from site work to Dy.CMM /GSD/PER or any other nominated locations specifed by the Engineer-in-charge by road or any other means including loading, unloading and leading 13 by contractors own vehicle or any other means and labours etc complete. including all men,materials,tools and plants and any other incidental works arise if necessary , hiring of road vechile/tracor/trailor leading charges, loading and unloading charges are to be borne by the tenderer/contractor and as directed by the engineer-in- charge. . (All labour, tools, materials, road vehicles, lighting materials ,consumable stores, crew etc., are to be supplied by the contractor only at his own cost.)
350
1243
435134
... More
Dismantling the existing RCC/CC Bed Block of piers and abutments to required portion before taking up mega block in order to reduce the block period for launching and fixing of new precast RCC Bed block 14 using mechanised Daimond wire cutting method to Correct shape and size including clearing of debris without affecting the train traffic movement with contractor men, Materials, machineries etc., as directed by Engineer-in- charge. The rate shall include the cost of working platform scaffolding arrangements required for keeping the machineries at site of workfor dismantling of existing RCC Bedblock using Daimond wire sewing & core cutting method /wall sewing method (including all labour, machinery movement to site) along the cross section of box into small loadable segments.
70
25960
1817200
... More
Casting the precast RCC Bed Block as per the approved plan, nearby the proposed site with 15 controlle concrete of m35 is using using river sand as per design using contractor's moulds made of steel plates and angles, supports etc, and levelling the ground and curing etc. confirming to the IS specification and as drected by engineer in charge. All labour materials for casting of RCC bedblock borne by the contractor excluding steel and cement.
350
7920
2772000
... More
Erection of Precast bed blocks by suitable capacity road cranes using lifting beam under line block /power block etc duly preparing and levelling the bearing area over abutment /pier with a layer of CI boring matrix 16 to a thickness not exceeding 25mm and as directed by Engineer-in-charge including cranes with standby cranes of required capacity men, materials , labour, tools &plants consumables, hiring of cranes and other related materials required for erection should be arranged by the Contractor only (one of the released girder may be used as lifting beamduly fixing hooks at appropriate location by weldingwhich should be done by Contractor only)(All labour and tools, equipments and other consumsble stores such as cement, CI borings road cranes, crew, fuel, are to be supplied by Tenderer/Contractor only at his own cost and risk
900
3910
3519000
... More
"Reducing the depth at one end/Two ends of service girdersupplied by Railway as perthe drawing 17 by cutting ofbottom flange and web torequired height and depthand providing suitablebottom flange withcontractor's supply of steel,providing stiffeners asrequired by welding etccomplete and as directed byengineer in charge (Alllabour ,tools and plants,machhines, consumables etcto be borne by thetenderer/contractor For18.3m span steel girder(Note:Unit-Each donotes pergirder
2
248649
497299.2
... More
"Reducing the depth at oneend of service girdersupplied by Railway as perthe drawing by cutting 18 ofbottom flange and web torequired height and depthand providing suitable bottom flange withcontractor's supply of steel,providing stiffeners asrequired by welding etccompleteand as directed byengineer in charge (Alllabour ,tools and plants,machhines, consumables etcto be borne by thetenderer/contractor For12.2m span steel girder(Note:Unit-Each denotes pergirder
2
99459
198919.68
... More
Dismantling of existing of staging arragments including I -girders, steel cribs and stacking away from site at safe & suitable location
200
1490
298000
... More
Galvanizing of StructuralSteel standard Channels,angles, plates/chequeredplates etc., as perspecifications including sand blasting and hot dippingafter galvanization minimum(120 microns ) with allangles, channels, plates etc
2000
34
68920
... More
Supply and placing in position of sand /earth bags to retain the earth at formation and the same should be stacked in position at nominated locations without casuing any infringement to the running traffic with all lead and lift etc., complete and as directed by the engineer-in-charge.(All labour and tools including other consumable stores are to be supplied by the tenderer/Contractor only at his own cost.)
10000
14
149100
... More
"Design of PSC super super strcuture and formulation of retrofit strategy for strengthening of existimg bridge piers and gidrers by CSIR-SCRC including Structural analysis of superstructure of bridge,Structural design of super structure for the critical load combination ,Formulation of retrofit strategy for strengthening of existing piers ,Preparation and submission of detailed technical report etc.. "
1
1770000
1770000
... More
Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe- 500D or more of approved brands/makes.
500000
102
51295000
... More
List of items of work that are covered under Delhi Schedule of Rates 2021
-
-
36377385.5