Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad Tender
Civil And Construction
Road Construction
Eprocure
Opening Date4 Dec 2024
Closing Date12 Dec 2024
Tender Amount₹ 1,97,954
Costs
EMD
₹ 3,959Document Cost
₹ 250Tender Fee
Refer Documents
Summary
Construction Of Concrete Road From The House Of Jabbar Sardar Towards The House Of Bastafa Sekh Beniabow Acty 89381293
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ZPHD_778624_1Bid Award Id
ViewTender No
276/KP-II/E-TENDER-06/15THFC UNTIED 1st 24-25/2024 SL 01Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Brick soling with picked jhama bricks including preparation of bed as
necessary with brick joints properly filled in and packed with powdered
earth and including necessary cushion of similar material below the
soling (and in between layers when more than one layer is used)
completes as per direction
(a) Single brick flat soling (thickness 75 mm.)
1x(50-33.50)m=16.50mx1.83m=30.20 sqm
1x51.0mx1.83m=93.33 sqm
Total=123.53 sqm
123.53
339
41876.67
... More
Supplying and laying Polythene Sheet (150gm / sq.m.) overdamp proof course or below flooring or roof terracing or in
foundation or in foundation trenches.
184.83
24
4435.92
... More
Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge(excluding bottom plugging) with coarseaggregates of appropriate nominal size andgrading, fine aggregate (sand) conforming toproper grading zone, both of approved quality andcement, as necessary, including labour, cost and
carriage of all materials and including preparationof design mix, approval of the same by theEngineer-in-Charge and cost for quality control,sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
(b) M-20 Grade
18.48
5779
106797.21
... More
Hire and labour charges for Shuttering with orwithout staging upto 4.0 m height using approvedstout props with wooden planks/ply wood/steelsheet plate with required bracing for any kind ofplain or reinforced concrete works in all sorts of
minor structure including culvert, box culvert, crossdrain etc. The rate isinclusive of fitting, fixing andstriking out aftercompletion of work as perspecification and direction.
(b) Where staging is not required
20.2
214
4322.8
... More
Material Testing-Bricks-Determination of Compressive Strength as per IS: 3405(part I-IV)-@920.00/- & Compresive strength of Concrete Speciman as per IS:516-@280.00/-x3 Nos Concrete Cube=840.00
1
840
840
... More
Construction of necessary Display Board including setting of Marble Tiles with necessary lettering etc. to disply the schematic details,as per instruction of E.I.C. with 3 copies of photo pre work, ongoing work and post work with thermocol as construction joints.
1
2230
2230
... More
Add 18% SGST
1
29898
29898
... More
Add 1% L.W. Cess
1
1960
1960
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements