Zilla Parishad Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Zilla Parishad - ZP Tender

Works
Eprocure
Opening Date24 Feb 2020
Closing Date3 Mar 2020
Tender Amount₹ 9,99,675 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)

-

-

-

... More
(a) With earth obtained from excavation of foundation.

30

-

77.54

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

25

-

361

... More
(I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (a) Pakur Variety (a) 1:3:6 proportion

2.5

-

5376

... More
Controlled Cement Concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer In Charge . Consumption of cement will not be less than 300 kg of cement with super plasticiser per cubic metre of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix formula. In ground floor and foundation. (Using concrete mixture) a. M25 Grade i. Pakur Variety

9

-

6739.87

... More
Hire & labour charges for shuttering with centering & necessay staging upto 4m. Approved stout props & thick hard wood planks of approved thickness with regarding bracing of concrete slabs, beams, columns, lintel curved or straight including fitting, fixing & striking out after completion of works. (Foundation & upto P.L.) as per decision & direction of Engineer-In-Charge.

-

-

-

... More
c)Steel shuttering or 9mm to 12 mm thick approved ply board shuttering in any concrete.

100

-

369

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.

-

-

70426.38

... More
Brick work with 1st class bricks in cement mortar (1:6)

-

-

-

... More
(a) In ground floor

-

-

5636

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]

-

-

-

... More
(b) 20mm thick plaster (1:6 cement sand morter) external plaster

-

-

175

... More
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification. iii) Two Coats--

-

-

49

... More
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :

-

-

-

... More
b) On steel or other metal surface : With super gloss (hi-gloss) - iv)Two coats (with any shade except white)

-

-

79

... More
(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

-

-

29

... More
a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor.

-

-

-

... More
(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.

6

-

8239

... More
(ii) Grill weighing above 16 Kg./sq.mtr and above

-

-

9696

... More
PATHWAY Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.

-

-

-

... More
(a) Depth of excavation not exceeding 1,500 mm.

-

-

-

... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.

-

-

24

... More
(I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (a) Pakur Variety (a) 1:3:6 proportion

15

-

5376

... More
a) 25 mm thick Tiles as per IS: 1237-2012 for ootpath,ramp,staircase of public building(over 25 mm thick (Avg) Cement mortar (1:3) & Cement Slurry @ 4.4 kg/Sq.m at back side of Block. Cement for Mortar & Slurry to be supplied by Department).

-

-

-

... More
i) Grey

100

-

858

... More
Labour for laying brick edging (75 mm wide) with departmental brick laid true to line and level including carriage of departmental bricks within a lead of 150 metres cutting necessary trench in soil or in hard metalled surface laying the bricks and repacking the trench (on both sides of the edging) with spoils and ramming the same thoroughly. (a) Brick-on-edge edging (125 mm) depth.

200

-

7.52

... More
Ornamental brick edging (75 mm wide) in compound roads, gardens etc. with 1st class or picked jhama bricks laid diagonally on end and with a corner slightly raised from the adjoining surface thus giving saw tooth appearance including cutting trench laying bricks and repacking the trench thoroughly on both sides of the edging complete as per direction.

-

-

72.88

... More
Sanitary & Plumbing Works

1

-

79995

... More
Electrical works

1

-

120000

... More
Supply of Children Equipment

1

-

150000

... More
GST @12%

1

-

106158

... More
Labour Welfare Cess @1%

1

-

8846.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.