Zilla Parishad Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Zilla Parishad - ZP Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date29 Jun 2024
Closing Date6 Jul 2024
Tender Amount₹ 2,63,771 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Page 24, It- 4 :- Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and einforcement,if any, in ground floor as per relevant IS codes. (b) River bazree

0.56

2282

4069

... More
P-43, It-38:- Hire and Labour Charges for shuttering with hard wood for precast R.C. Slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc, complete in all respect. (only the area in contact with concrete to be measured)

2.93

600

205

... More
P-15, It-8: Brick work with 1st class bricks in cement mortar (1:6)(a) In foundation and plinth

2.26

11064

4896

... More
P-16, It-16: 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.

1.8

1213

674

... More
P-26, It-10:- Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.

0.53

2547

4807

... More
P-43, It-40:-Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc complete as per drawing and direction.(a) For works in foundation, basement and upto roof of ground floor/upto 4m (i)Tor steel/Mild Steel II.JSW/JSPL/SHYAM/SRMB/ BMASL/ ELECTROSTEEL/ SSL[As per 10th CORRIGENDA & ADDENDA dated :- 22/01/2020 FOR S.O.R OF PWD (W.B) wef 01.11.2019; P-1 & Sl. No-1]

0.05

3058

62418.99

... More
P-189, It-1:-Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or,(Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar, (c) 15 mm thick plaster

12.66

1785

141

... More
shingle 63-37.5mm

0.43

371

864

... More
Bazree 22.40 mm

0.43

407

947.25

... More
Bazree 11.20 mm

0.22

208

947.25

... More
SOR:- SECTION (B) - SANITARY AND DRAINAGE WORKS (B)-(II) SOIL PIPE AND FITTINGS Page 68, It-23:- Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 A) (i) Single Socketed 3 Meter Length b) 110 mm

5

1460

292

... More
P-70,It-23:-B)Fittings ii)Plain Tee (b)110 mm. Dia.

1

85

85

... More
(B ) SILT CHAMBER

-

-

-

... More
P-1, I-2:- Earth work in excavation of foundation trenches or drains, in all sorts of soil...as directed. complete. (a) Depth of excavation not exceeding 1,500 mm..

4.38

522

119.27

... More
P-14, I-01:Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

5.88

1893

322

... More
Page 24, It- 4 :-Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.(b) River bazree

0.42

1708

4069

... More
P-43, It-38:- Hire and Labour Charges for shuttering with hard wood for precast R.C. Slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc, complete in all respect. (only the area in contact with concrete to be measured)

2.4

492

205

... More
P-16, It-16: 125 mm.thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.

12.6

8492

674

... More
P-26, It-10:- Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size)excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.

0.6

2884

4807

... More
P-43, It-40:- Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II.JSW/JSPL/SHYAM/SRMB/ BMASL/ ELECTROSTEEL/ SSL[As per 10th CORRIGENDA & ADDENDA dated :- 22/01/2020 FOR S.O.R OF PWD (W.B) wef 01.11.2019; P-1 & Sl. No-1]

0.06

3495

62418.99

... More
P-189, It-1:- Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or,(Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar, (c) 15 mm thick plaster

10.8

1522

141

... More
P-192,It-15:- Neat cement punning about 1.5mm thick....

10.8

367

34

... More
SOR:- SECTION (B) - SANITARY AND DRAINAGE WORKS (B)-(II) SOIL PIPE AND FITTINGS Page 68, It-23:- Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992

30

8760

292

... More
P- 70, It-23:- B) Fittings ii) Plain Tee (b) 110 mm. Dia. A) (i) Single Socketed 3 Meter Length b) 110 mm"

12

1020

85

... More
Construction of Tube well plateform for Grey Water mangement

-

-

-

... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil It-2 (including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling dressing and ramming the bottom, balling out water as required complete.a)Depth of excavation not exceeding to 1500mm.Platform

0.17

20

119.27

... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local.Platform

4.5

1449

322

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor P-24 as per relevant IS codes.(b) River hazree

0.34

1375

4069

... More
125 mm. thick brick work with 1st class bricks in cement mortar (4:1) in It-16 ground floor.

0.83

559

674

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or rougening of concrete surface, including throating, nosing and drip course where necessary (ground floor) Extra for each additional floor.(c) 15 mm. thick plaster (6:1)

5.45

768

141

... More
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cum per100 sq.m.

5.45

185

34

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 For Institution like School, AWC, HC, Office etc.LI) Nahani Trap (90 mm) @1 no./institution

2

210

105

... More
PIPELINE OF COMMUNITY LEVEL FOR GREY WATER MANAGEMENT ( XV F.C )

-

-

-

... More
Earth work in excavaion of foundation trenches or drains,in all sorts soil…including removing, spreading or stacking the spoils within alead of 75 mt as directed ……..reqd comp.(a)Depth of exacavation not exeeding 1.50 mt Pipe Line Conecting pipe line

12.81

1528

119.27

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992(A) (i) Single Socketed 3 Meter Length ,,PVC Pipes 110 mm DIA (b) 110 mmMain Line House Connecting Line

205

59860

292

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992(B) Fittings(ii) Plain Tee (b) 110 mm

20

1700

85

... More
(iii) Door Tee (b) 110 mm

13

2535

195

... More
ix) Bend 45º (b) 110 mm

10

890

89

... More
x) Bend 87.5º (b) 110 mm

12

1440

120

... More
xxxv) Socket Plug 110 mm

11

594

54

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 C) Rubber Lubricant 500 ML

17

3179

187

... More
Labour for fitting and fixing U.P.V.C. pipes for above ground work including cost of jointing materials etc. fitting and fixing all necessary specials,... ... or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineerin- charge. (Payment will be made on centre line measurement of the total pipeline including specials.(B) Under ground (ii) 110 mm dia.

205

17220

84

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 For Institution like School, AWC, HC, Office etc.LI) Nahani Trap (90 mm) @1 no./institution

18

1890

105

... More
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 .....as per direction of the Engineer-in-Charge.

3

6558

2186

... More
Leach Pit 3 H/H.

-

-

-

... More
Earch work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. Page No 1, Item No-2

5.19

619

119.27

... More
Earth work in excavation of foundation trenches or drains, in aI) sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring.Page No-1, Item No-2

2.6

500

192.38

... More
Single Brick FlaI Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. Page No-14, Item No-1 and 3rd corrigendum

1.69

544

322

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (b) River bazree

0.13

528

4069

... More
Brick work with 1st class bricks in cement mortar (J:4)(a) In foundation and plinth Page No-J5, Item No-7 and 3rd Corrigendum

1.92

9935

5172

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]. (i) With 1:4 cement mortar. (c) 1S mm thick plaster Page No-189, Item No-J and 3rd Corrigendum

1.06

149

141

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor ect. NOTE: Cement 0.152 cu.m per 100 sq.m.

1.06

36

34

... More
Supply of UPVC pipes (B Type) & fittings conforming to 15-13592-1992. (B) Fittings (ii) Plain Tee (b) 1J0 mm

1.98

170

86

... More
Ordinary Cement concrete (mix 1:1.S:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per re)e vant IS codes.

0.18

865

4807

... More
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by through saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurment of finished quantity)Page No-2, Item No-04

3.56

1535

431.31

... More
Hire and labour charges for suttering with centering and neccessery staging upto 4 mtr using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, coloum, lintels, curved or straight incluing fittings, fixing and striking out after completion of works, (upto roof of ground floor) (f) 2Smm. to 30mm shuttering without staging in foundation etc.Page No 42, Item No—36

0.99

202

205

... More
, Reinforcement for reinforced concrete work in all sorts of structuresi including distribution bars, stirrups, binders etc initial straightening and'removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 Tor steel/Mild Steel. TATA/SAUL/QRNL Page No-43, Item No-40 and Rate Analysis

0.02

936

62418.99

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-z3s92-1992. (ii) Single Socketed 3 Meter Length. (b) 110 mm Page No-68, Item No-23- II

5

1460

292

... More
Leach Pit 5 H/H.

-

-

-

... More
Earch work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. Page No 1, Item No-2

12.46

1486

119.27

... More
Earth work in excavation of foundation trenches or drains, in aI) sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring.Page No-1, Item No-2

6.22

1196

192.38

... More
Single Brick FlaI Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. Page No-14, Item No-1 and 3rd corrigendum

4.4

1416

322

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (b) River bazree

0.32

1302

4069

... More
Brick work with 1st class bricks in cement mortar (J:4)(a) In foundation and plinth Page No-J5, Item No-7 and 3rd Corrigendum

5

25860

5172

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]. (i) With 1:4 cement mortar. (c) 1S mm thick plaster Page No-189, Item No-J and 3rd Corrigendum

2.4

338

141

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor ect. NOTE: Cement 0.152 cu.m per 100 sq.m.

2.4

81

34

... More
Supply of UPVC pipes (B Type) & fittings conforming to 15-13592-1992. (B) Fittings (ii) Plain Tee (b) 1J0 mm

4

340

85

... More
Ordinary Cement concrete (mix 1:1.S:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per re)e vant IS codes.

0.46

2211

4807

... More
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by through saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurment of finished quantity)Page No-2, Item No-04

7.92

3415

431.31

... More
Hire and labour charges for suttering with centering and neccessery staging upto 4 mtr using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, coloum, lintels, curved or straight incluing fittings, fixing and striking out after completion of works, (upto roof of ground floor) (f) 2Smm. to 30mm shuttering without staging in foundation etc.Page No 42, Item No—36

2.5

512

205

... More
, Reinforcement for reinforced concrete work in all sorts of structures i including distribution bars, stirrups, binders etc initial straightening and ' removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 Tor steel/Mild Steel. TATA/SAUL/QRNL Page No-43, Item No-40 and Rate Analysis

0.04

2371

62418.99

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-z3s92-1992. (ii) Single Socketed 3 Meter Length. (b) 110 mm Page No-68, Item No-23- II

10

2920

292

... More
CGTS @ 9%

1

19919

19919

... More
SGST @ 9%

1

19919

19919

... More
LABOUR CESS @ 1%

1

2611

2611



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.