Zilla Parishad Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Zilla Parishad Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date15 Jan 2025
Closing Date22 Jan 2025
Tender Amount₹ 1,10,391 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor

35

728

25498.55

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing anddripcourse, scaffolding/ staging where necessary (Ground floor).[Excludingcost of chipping over concrete surface] (i) With 1:4 cement mortar. (a) 15 mm thick plaster

50

163

8161.5

... More
Neat cement punning about 1.5 mm thick in wall, dado, window sill, floor etc. Note: Cement 0.152 Cum. Per 100 Sqm.

50

32

1637.5

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation

43.75

214

9362.5

... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.

60

24

1440

... More
Ordinary Cement concrete (mix 1:1:5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes.

2.17

5878

12730.97

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening andremoval of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. 1.2X 35.56X 7850 =3350 Kg

0.2

54522

11122.6

... More
PCC WORK TESTING Determination of Aggregate Impact Value as per IS: 2386 (Part – IV)

1

690

690

... More
Grading by Sieve Analysis as per IS: 2386 (Part – I)

1

460

460

... More
Fineness by dry sieving as per IS: 4031 (Part-I)

1

280

280

... More
Compressive Strength Test of Concrete Specimen as per IS: 516

1

280

280

... More
Construction of necessary Display Board including Setting of marble tiles with necessary lettering etc. to Display the schematic Details, as per instruction of IC. With 8 copies of Photo Pre Work, At the time of Work in progress and Post Work with thermocol at Construction joint

1

500

500

... More
Add 9% CGST

1

8336

8336.26

... More
Add 9% SGST

1

8336

8336.26

... More
Add 1% Cess

1

1092

1092.98



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.