Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad Tender
Civil And Construction
Building Construction
Eprocure
Opening Date13 Aug 2024
Closing Date22 Aug 2024
Tender Amount₹ 3,28,944
Costs
EMD
₹ 6,600Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Nit 11 Sl 01 Repairing Works Of School Building
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ZPHD_732783_1Bid Award Id
ViewTender No
NIT No.-11/EO/COB-II PS/2024-25 SL 01Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface).
[Note: - Waterproofing as per item 9, polymer based paint as per item 8 (a) of subhead C of Section (C).
1.5
304
203
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
8.53
5749
674
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary(FIRST floor).[Excluding cost of chipping over concrete surface]
(ii) With 1:6 cement mortar
(a) 15 mm thick plaster
25.26
3561
141
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary(FIRST floor).[Excluding cost of chipping over concrete surface]
(ii) With 1:6 cement mortar
(b) 20 mm thick plaster
18.06
2907
161
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary(FIRST floor).[Excluding cost of chipping over concrete surface]
(ii) With 1:4 cement mortar
(b) 10 mm thick plaster
29.76
3749
126
... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m
10.8
367
34
... More
Labour for taking out door and window frame including shutter for repair or replacement of different parts of the frame & refixing the same including mending good all damaes complete. (Concrete and brick work for mending damage will be paid separately)
(a) Upto area 2.5 Sq.m
34.02
4966
146
... More
Taking out shutter of door and window, dismantling by parts (for repair or replacement of damaged parts) , reassembling and refitting and rehanging same with old fittings but with new screws as necessary. (Where different parts of same shutter are renewed under different item, payment under item 73 will be made once only)
17.28
2177
126
... More
Z-batten shutters of door and window as per design havings tongued and groovehalf lap jointed as per direction of the Engineer-in-Charge including fitting and fixing shutter in position, but excluding the cost of hinges and other fittings in ground floor
(A) Shutter with 25mm thick planks, 19mm thick battens.
(iii) Sishu, Gamar, Champ, Badam, Bhola, Morga, Hallak
17.28
45204
2616
... More
M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor.
(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.
132.3
13257
100.21
... More
M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete.
The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour
reqired for the work including all incidental chages such as electricity charges, labour insurance charges etc.
Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a height of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof
878.4
65247
74.28
... More
Galvanised corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work)(GCI sheet to be supplied by contractor)
(i) In Roof:-
a) With 0.60 mm thick sheet
135.72
84010
619
... More
Galvanised iron sheet ridging fitted with necessary bolts, screws, washers etc complete.(225mm end lapping)
a) With 0.60 mm thick sheet
(B) 450 mm lapping each way
19.45
9122
469
... More
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive
decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC.
In Ground Floor:
(a) One Coat
200
6280
31.4
... More
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.
In Ground floor (Two Coat)
a) Normal Acrylic Emulsion
200
13400
67
... More
White washing including cleaning and smoothening surface thoroughly
All floors :
(c) Three coats (on new works only)
18.06
361
20.01
... More
Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
69.73
2649
38
... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc
3.6
104
29
... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface if necessary.
On timber or plastered surface.
With super gloss (hi-gloss)
Two coats (with any shade except white)
69.73
5648
81
... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface if necessary.
On steel or other metal surface
With super gloss (hi-gloss)
Two coats (with any shade except white)
3.6
284
79
Evaluation Notes How It Works ?