Zilla Parishad Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Zilla Parishad Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date13 Feb 2025
Closing Date21 Feb 2025
Tender Amount₹ 4,13,667 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PWD Building Schedule 2017[P-14,Sl.No.-1] [ 3RD Corrigenda & Addenda] Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. (a) Single brick flat soling (thickness 75 mm.)

38.23

324

12386.52

... More
PWD Building Schedule 2017[P-35,Sl.No.-22(II)(a)] [ 3RD Corrigenda & Addenda] Cement concrete with 32mm. down graded shingles excluding shuttering a) 6:3:1 proportion

2.87

3393

9737.91

... More
PWD Building Schedule 2017[P-26Sl.No.-10(ii)] [ 3RD Corrigenda & Addenda] Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes River bazree Ground Floor

14.25

4745

67616.25

... More
PWD Building Schedule 2017[P-16,Sl.No.-16][ 3RD Corrigenda & Addenda] 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. In Ground floor

88.19

674

59440.06

... More
PWD Building Schedule 2017[P-42,Sl.No.-36] Hire and labour charges for shuttering with centering and necessary staging up to 4m. Using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs beams, columns, lintels curved or straight including fitting. Fixing and striking out after completion of works. When the height of particular floor is more than 4m.the equivalent floor ht. shall be taken as 4m. and extra for works beyond the initial 4m. ht. shall be allowed under 12(e) for very 4m. or part thereof) f) 25mm. to 30mm. shuttering without staging in foundation etc.

65.24

205

13374.2

... More
shuttering withstaging a) 25mm. to 30mm. thick wooden shuttering as per decision & direction of the Engineer-in-Charge

98.15

328

32193.2

... More
PWD Building Schedule 2017[P-43,Sl.No.-40(a)(i)(ii)] [10th Corrigenda & Addenda] Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc, including supply of rods, initial straightening and removal of loose rust (if necessary) cutting to requisite length , hooking and bending to correct shape, placing in proper position and binding with16 gauge black annealed wire at every inter-section, complete as per drawing and direction. a)) For works in foundation, basement and upto roof of ground floor/upto 4m i)) Tor steel/Mild steel

0.9

66502

59519.29

... More
PWD Building Schedule 2017[P-189,Sl.No.1(ii)(b)] Plaster (to wall, floor, ceiling etc.) with sandand cement morar including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface. including throating , nosing and drip course where necessary ( ground floor) ii) With 4:1 cement morar b) 10 mm thick plaster (External Surface) 1) In Ground Floor

267.76

126

33737.76

... More
PWD Building Schedule 2017[P-192,Sl.No.-15] Neat cement punning about 1.5 mm thick in wall dado, window, sills, floor, drain etc[Note :- Cement 0.152cum per 100 sqm.]

70.6

34

2400.4

... More
PWD Building Schedule 2017[P-105,Sl.No.-16] [ 3RD Corrigenda & Addenda] M.S. gate of Jail type as per approved design made of strong M.S. frame work, intermediate stiffeners and round / square bars or angles. M.S. sheet (not less than 14 gauge) gussets, cleats etc. including necessary riveting, bolting, welding, locking and hanging arrangements, fitting and fixing complete as per direction of the Engineer-in -charge. a) In Ground Floor

300

100

30297

... More
PWD Building Schedule 2017[P-200,Sl.No.-1(a))] (a) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smootheningnsurfaces by sand papering etc. (This item is applicable to new work or old work when the original surface hasbeen exposed by removal of old paint.) On Steel Surface :-

35

29

1015

... More
PWD Building Schedule 2017[P-200,Sl.No.-2(b)(ii))] Painting with best quality synthetic enamel paint of approved make & brand including smoothening surface by sand papering etc. including using of approved putty etc.on the surface. On steel or other metal surface: With super gloss (hi-gloss) one coat. (white in shade) M.F.=1 a) On timber or plastered surface: (With super gloss (hi-gloss) b(iv) On Steel or other metal surface: (With super gloss (hi-loss) iv ) Two coats( With any shade except White

35

77

2695

... More
PWD Building Schedule 2017[P-194,Sl.No.-1© ] White washing including cleaning and smoothening surface thoroughly ( 5 parts of stone lime and 1 part of shell lime should be used in the finishing coat) All floors c) Three coats ( on new works only)

420

20

8404.2

... More
PWD Building Schedule 2017 [ P-194 9,Sl.No.-2(b)] Colour washing with ELLA wih a coat of white wash priming including cleaning and smoothenin surface thoroughly. ii) External surface b) Two coats 1) In Ground Floor

420

21

9143.4

... More
Add:- GST @ 18%

1

62476

62476.97

... More
Add:- Labour Welfare Cess @ 1%

1

4095

4095.71



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.