Zilla Parishad Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad Tender
Civil And Construction
Eprocure
Opening Date29 Jan 2019
Closing Date12 Feb 2019
Tender Amount₹ 11,33,130
Costs
EMD
₹ 22,663Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wb/jal/sadar/b.d.o/ 16 /18-19/02
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_ZPHD_210640_2Bid Award Id
ViewTender No
WB/JAL/SADAR/B.D.O/ 16 /18-19Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://http://jalpaigurizp.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
107.49
-
323
... More
Cement concrete with graded stone ballast (40 mm size excluding
shuttering ( 6:3:1)
8.06
-
3620
... More
25 mm. thick damp proof with cement concrete (1:1.5:3) (with
graded stone aggregate 10 mm. normal size) and painting the
top surface with a coat of bitumen [VG.40 ] using 1.7 kg. per
sq.m. including heating the bitumen and cost and carriage of
all materials complete. [Bitument to be supplied by the
Agency]
5.73
-
267
... More
Brick work with 1st class bricks in cement mortar (1:6)
6.01
-
4845
... More
Brick work with 1st class bricks in cement mortar (1:6) In superstructure, wall
15.23
-
5068
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
38.11
-
5612.2
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm shuttering without staging in foundation
221.53
-
328
... More
Reinforcement for reinforced concrete work in all sorts of structures
including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
3.84
-
60248
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor
25.01
-
709
... More
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals).Sal : Malayasian
0.2
-
81936
... More
Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately)
36
-
29
... More
Description of work/ supply materials
-
-
-
... More
Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark
36
-
47
... More
Iron socket bolt of approved quality fitted and fixed complete.
2
-
77
... More
150 mm long x 10 mm dia bolt
12
-
63
... More
Iron Hasp bolt fitted and fixed complete 300 mm long
2
-
166
... More
Iron catch hook fitted and fixed to shutter
12
-
82
... More
Anodised aliminium D-type handle of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 230/72) fitted and fixed complete:
4
-
103
... More
Supplying, fitting and fixing hinge cleat in position excluding the cost hinge and other fiffitngs.
16
-
37
... More
Renewing 125mm long wooden buffer blockWith Sal : Malayasian
16
-
54
... More
Artificial stone in floor, dado, staircase etc with cement
concrete (1:2:4) with stone chips, laid in panels as directed
with topping made with ordinary or white cement (as
necessary) and marble dust in proportion (1:2) including
smooth finishing and rounding off corners including raking
out joints or roughening of concrete surface and application
of cement slurry before flooring works using cement @ 1.75
kg/sq.m all complete including all materials and labour In ground floor. 3 mm. thick topping (High polishing grinding on this item is
not permitted with ordinary cement).
Using grey cement 35 mm. thick
58.83
-
327
... More
Styles and rails of wooden shutters fitted and fixed complete. (Payment to be made on area of new work only). In Ground Floor
Ordinary Teak Wood.
11.29
-
3229
... More
M.S.or W.I. Ornamental grill of approved design joints
continuously welded with M.S, W.I. Flats and bars of windows,
railing etc. fitted and fixed with necessary screws and lugs in ground
floor.
105
-
73.71
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar
including rounding off or chamfering corners as directed and
raking out joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground floor).[Excluding
cost of chipping over concrete surface . With 1:4 cement mortar
10 mm thick cement plaster
67.56
-
125
... More
15 mm thick Cement Plaster
81.9
-
154
... More
20 mm thick Cement Plaster
81.94
-
157
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar
including rounding off or chamfering corners as directed and
raking out joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground floor).[Excluding
cost of chipping over concrete surface]With 1:6 cement mortar 15 mm cement plaster
139.61
-
138
... More
Neat cement punning about 1.5mm thick in wall, dado, window
sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
29.09
-
34
... More
White washing including cleaning and smoothening surface thoroughly
144.58
-
20.01
... More
Applying decorative cement based paint of approved quality after
preparing the surface including scraping the same thoroughly
(plastered or concrete surface) as per manufacturer's specification
Two coats..
207.48
-
49
... More
Priming one coat on steel or other metal surface with synthetic oil
bound primer of approved quality including smoothening surfaces by sand papering etc.
13.68
-
38
... More
Priming one coat on timber or plastered surface with synthetic oil
bound primer of approved quality including smoothening surfaces by sand papering etc.
8.64
-
29
... More
Painting with best quality synthetic enamel paint of approved make
and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary
49.25
-
81
... More
Window steel surface
8.64
-
79
... More
Supplying fitting fixing UPVC pipe with all necessary clamps nails including making holes in walls ( 110 mm dia) singla socketed 3 meter length
4
-
292
... More
Cost Ramp ( as per analysis rate )
1
-
16220
... More
Add cost of electrification
1
-
7500
... More
Cost of Furniture
1
-
100000
... More
GST @ 12 %
1
-
120204.69
... More
cess @ 1%
1
-
11219.1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements