Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad - ZP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date20 Nov 2024
Closing Date26 Nov 2024
Tender Amount₹ 1,95,768
Costs
EMD
₹ 3,915Document Cost
₹ 250Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ZPHD_771002_1Bid Award Id
ViewTender No
40.nit.2024Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://https://www.udzp.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. Where staging is not required
23.7
214
5071.8
... More
Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. North Bengal variety M-20 Grade Using concrete mixer
29.63
4970
147271.47
... More
Earth work in excavation from borrow pits (land owned/arranged by the Department) and depositing in layers of 250mm. including breaking clods in embankment works and to fill up back of abutments, depressions and ruts with an initial lead of 50m. and initial lift upto 1.5 m. making bundhs at top as directed dressing complete. ( Borrow pit measurement) In ordinary soil. Within a lead upto 1km.
8.5
247
2105.54
... More
Providing & fixing Concrete Sign Board as per IRC specification of size 600 x 150 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in- Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)
1
2230
2230
... More
Add GST@ 18%(CGST 9%+ SGST 9%) AND Labour welfare Cess @ 1%
1
31505
31505.6
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements