Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad Tender
Civil And Construction
Road Construction
Eprocure
Opening Date2 Feb 2024
Closing Date12 Feb 2024
Tender Amount₹ 2,62,000
Costs
EMD
₹ 5,240Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ZPHD_657617_1Bid Award Id
ViewTender No
Baghasty/15/1/2023-24Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://https://zpmidwest.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835.
17.52
11776
672.2
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety. RCC M20
30.66
187843
6126.67
... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props wth wooden Wood/steel sheet plate with planks/plyY required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert. box Culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction (b) Where staging is not required.
25.55
5467
214
... More
Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification. Note :Add cost at site of the materials to arrive at the complete rate. The compaction factor may be taken as 0.67.
3.29
3198
973.62
... More
Supplying and laying Polythene sheet (150 gm/Sqm) over damp proof course or bellow flooring or roof terracing or in foundation or in foundation trenches.
175.2
4204
24
... More
Providing RCC Display Board as per prescribed shape & size and including writing,fitting and fixing at the work site and Photograph at 3 stage of work (i.e. before work,In progress and after conpletion).
1
2500
2500
... More
OTHERS
-
-
-
... More
GST
1
39339
39339.44
... More
CESS
1
2578
2578.92
... More
CONTINGENCY
1
1529
1529.23
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements