Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad - ZP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date16 Jan 2025
Closing Date16 Jan 2025
Tender Amount₹ 2,50,000
Costs
EMD
₹ 5,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ZPHD_797421_13Bid Award Id
ViewTender No
WB/HOW/AMTA-I/NIET/53/24-25Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://https://howrahzilaparishad.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand.[P-14,Item No.1]
44.14
357
15757.98
... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required
13.38
214
2863.32
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.[P-26,Item No.10 of PWD(Building) Schedule]
12.04
6355
76523.47
... More
Brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or in hard metalled surface, laying the bricks and repacking the trench (on both side of the edging) with spoils and ramming the same thoroughly complete as per direction. (b) Brick-on-end edging (250 mm) depth..[Vide Page No.227, Item No.3 of PWD(Building) Schedule]
53.5
8959
4793.07
... More
Supplying and driving Eucalyptus bullah piles of 150 mm. dia 4.50 m. long @ 400 m.m. C/C ( 3m driving in standing water condition ) by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles including 100 m.. dia tie and tie post of 1.2 m. long 2.5 m. c/c and 3 nos. half split bullah of 100 m.m. dia as runner all complete . (P-324,It-18.18 &18.17 (ii) & (iii), 324,It-18.41, 325,It-18.27(a)
20
4025
80510.4
... More
Walling or roofing fitted and fixed complete with cut drum sheets including the cost of drums, cost of cutting drums and flattening the sheets and cost of necessary nails and screws.(P-88, Item No.30)(Building Sch.)
30
348
10440
... More
Earthwork in excavation from borrow pits (land owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments, depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds at top as directed dressing complete. (Borrow pit measurement) [P-237,Item No.3.01 (i) ofS.O.R. 2018 of PWD(Roads) Schedule, effect from 30.08.18]
14.63
329
4820.59
... More
Construction of permanent sign board carrying inscription of fund Name, cost involved, commemcement date & completion date with three stage photograph Etc.
1
1849
1849
... More
GST
1
37755
37755.89
... More
Cess
1
2475
2475
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements