Zilla Parishad Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad - ZP Tender
Civil And Construction
Building Construction
Eprocure
Opening Date20 Feb 2025
Closing Soon27 Feb 2025
Tender Amount₹ 2,91,284
Costs
EMD
₹ 6,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ZPHD_817713_4Tender No
BDO/SNK/eNIT-40-AWC-MAME/24-25Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://https://howrahzilaparishad.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Brick work with 1st class bricks in cement mortar ( 1 : 6 ) In foundation and plinth
3.47
5247
18182.8
... More
Brick work with 1st class bricks in cement mortar ( 1 : 6 ) In superstructure, ground floor
2.86
5469
15642.94
... More
125 mm. thick brick work with 1st class bricks in cement mortar ( 1 : 4 ) in ground floor.
25.2
714
18008.17
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).( Excluding cost of chipping over concrete surface ). 10 mm. thick plaster(1:4)
77.5
126
9809.95
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).( Excluding cost of chipping over concrete surface ). 20 mm. thick plaster ( Inside Plaster ) (1:4)
41
180
7386.15
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).( Excluding cost of chipping over concrete surface ). 15 mm. thick plaster ( Outside Plaster )
48.95
156
7649.91
... More
Artificial stone in floor, dado, staircase etc with cement concrete ( 1 : 2 : 4 ) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding
off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement
48.95
311
15238.62
... More
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc.
NOTE : Cement 0.152 cu.m per100 sq.m.
48.95
32
1604.09
... More
M.S. integrated grill as per approved design integrated with steel window or ventilator, joints continuously welded with M.S. flats and bars.
267.12
94
25109.28
... More
M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq.
1.44
9888
14238.72
... More
Collapsible gate with 40mm x 40mm x 6mm Tee as top and bottom guide rail, 20mm x 10mm x 2mm vertical channels 100mm apart in fully stretched position 20mm x 5mm M.S. flats as collapsible bracings properly rivetted and washered including 38mm steel rollers including locking arrangements, fitted and fixed in position with lugs set in cement concrete and including cutting necessary holes, chasing etc. in walls, floors etc. and making good damages complete
5.04
4330
21823.2
... More
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps.
0.1
77671
7767.1
... More
Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings.
In ground floor.35 mm. Thick shutters with 19 mm. Thick panel of size 30 to 45 Cm. Sishu, Gamar, Champ, Badam, Bhola, Mogra, Hallak.
3.2
2948
9433.6
... More
White washing including cleaning and smoothening surface thoroughly . Three coats
45
2001
900.45
... More
Colour washing with any shade with Stainers, as required including cleaning and smoothening surface thoroughly : External Surface, Two coats (on new works only).
45
2135
960.75
... More
Priming one coat on timber, or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
55.2
38
2097.6
... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
45.2
29
1310.8
... More
M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and rection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a height of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. i) For trusses spanning up to 12.00 m
0.06
72951
4595.91
... More
Galvanised corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work)(GCI sheet to be supplied by contractor) i) In Roof:- b) With 0.63 mm thick sheet
22.2
644
14296.8
... More
Galvanised iron sheet ridging fitted with necessary bolts, screws, washers etc complete.(225mm end lapping) (B) 450 mm lapping each way, (b) With 0.63 mm sheet
42
490
20580
... More
TOTAL WITHOUT GST AND LABOUR CESS
1
1
244407.09
... More
Including GST @ 18%
18
244407
43993.28
... More
Including Cess @ 1%
1
288400
2884
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%