Zilla Parishad Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Zilla Parishad Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date8 Mar 2024
Closing Date18 Mar 2024
Tender Amount₹ 3,35,000 
Notes
Download

Costs

Summary

Construction Of Shed At Hatgacha Sabji Market

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
First class bricks work with (6:1) sand cement mortar in foundation.(5" Thick)

9.66

7037

728.53

... More
Nominal mix (1:2:4) cement concrete with graded stone chips (20.mm. size) excluding shuttering & reinforcement.

9.86

55340

5612.65

... More
Hire and labour charges for shuttering with centering and necessary stagging.

15.14

3239

214

... More
Rein forcement bar for all R.C.C work in all sorts of structure including distribution bars, strrups, binders etc. Including supply of rods initial straight tanning removal of loose rust cutting to request lenth hooking and bending to concrete shape placing in proper position and bending 16. gauge black enameled wire at every cross section complete . As per drawing and direction.

221.28

11763

53.16

... More
M.S. structural works with hollow sections (square or rectangularshape) conforming to IS: 806-1968 & IS:1161-1998) connected toone another with bracket, gusset, cleat as per design, drawing &direction of Engineer-in-Charge complete including cutting torequisite shape & size, fabrication including metal arc weldingconforming to IS: 816-1969 & IS: 9595 using electrodes of approvedmake and brand conforming to IS:814- 2004, haulage, hoisting anderection all complete.The rate includes the cost of all M.S. Hollow section, allconsumables such as electrodes, gas and hire charges of all toolsand plants and labour reqired for execution and all incidentalchages (such as electricity, labour insurance) etc. complete.40mm x40 mm (4 mm thick)For Truss number

1338.46

78744

58.83

... More
Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn)coating of 150 grams per sq. metre (followed by colourcoated on both side) steel sheet work having minimum yieldstrength of 550 Mpa of trapizoidal profile of approved make(excluding the supporting frame work) fitted and fixed with55 mm & 25 mm self tapping screw, EPDM Washer 16 mmdia & 3 mm th. washer etc. complete with 150 mm end lapand one corrugation minimum side lap. (Payment to be madeon area of finished work).(i) In Roof:-a) With 0.5 mm thick sheet

90

70740

786

... More
Supplying, fitting & fixing PVC Pipeapproved market of Scheduled80 (medium duty)……

17

19278

1134

... More
Neat cement punning of skarting, dado, floor etc.

72

2448

34

... More
Construction of masonry display board fitting and fixing complete.

1

1598

1598

... More
ADD GST(Goods and Services taxes) @ 18.00%(50% WB GST& 50% CENTRAL) over the above total [Marked as A] asper the rules of the Govt.of India….

1

50595

50595.77

... More
ADD for LABOUR WELL FARE CESS @ 1.00 %

1

3316

3316.83



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.