Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date18 Jan 2025
Closing Date29 Jan 2025
Tender Amount₹ 1,38,000
Costs
EMD
₹ 2,760Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ZPHD_802672_7Bid Award Id
ViewTender No
Bak/17/2024-25Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://https://zpmidwest.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
4.68
599
2806.18
... More
Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety] 1:3:6
2.34
5207
12184.38
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel (III) Other manufacturers not specified
0.4
58515
23406
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety. RCC M20
8.29
5982
49566.01
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation
63.7
203
12931.1
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar (c) 10 mm thick plaster
45.5
123
5596.5
... More
Neat cement punning about 1.5 mm thick in wall,dado,window sill,floor etc. Cement 0.152 cum per 100 sqm
45.5
34
1547
... More
Supplying and laying Polythene sheet (150 gm/Sqm) over damp proof course or bellow flooring or roof terracing or in foundation or in foundation trenches.
83.2
24
1996.8
... More
Providing RCC Display Board as per prescribed shape & size and including writing,fitting and fixing at the work site and Photograph at 3 stage of work (i.e. before work,In progress and after conpletion).
1
2000
2000
... More
OTHERS
-
-
-
... More
GST
1
20678
20678.74
... More
CESS
1
1355
1355.61
... More
CONTINGENCY
1
1083
1083.75
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements