Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad - ZP Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date8 Jan 2025
Closing Soon15 Jan 2025
Tender Amount₹ 7,45,711
Costs
EMD
₹ 14,914Document Cost
₹ 1,000Tender Fee
Refer Documents
Summary
Nit No Banarhat/eo/nit-006/2024-25 2nd Call / 1
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ZPHD_796977_1Tender No
NIT NO BANARHAT/EO/NIT-006/2024-25 2nd CallTender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ-1 CONSTRUCTION OF 1 NO. SOLAR POWERED DRINKING WATER FACILITY WITH WATER PURIFICATION SYSTEM WITHIN CHAMURCHI GP
BOQ Items
... More
(iii) Next 50 mtr.
50
1055
52750
... More
PWD S&P SCHEDULE, PAGE NO. 111, ITEM 17(A)(II)
Supplying, fibre glass reinforced Epoxy resin slotted of 1 mm slot width in 6.1m length of approved make and as per direction of the Engineer - in Charge
(b) 100 mm nominal dia (i) 6.00 mm wall thickness
9
1638
14742
... More
PWD S&P SCHEDULE, PAGE NO. 111, ITEM 17(A)(II)
(A) Supply of E.R.W.M.S.(Electrical Resistant Welded M.S.) black pipe of of TATA make (heavy quality) as per standard specification, 5 mm thick.
(ii) 100 mm dia. (internal)
141
1045
147345
... More
PWD S&P SCHEDULE, PAGE NO. 55, ITEM 20
Washing and developing tube well with air compressor pump and engine for 8 (eight) hours continuous pumping per day with necessary arrangements for testing the yield in gallons per hour with 'V' notch including hire and labour charges for all tools and plants and scaffolding as required.
2
7538
15076
... More
PWD S&P SCHEDULE, PAGE NO. 55, ITEM 22 Labour for making arrangement for showing verticality test including the cost for hire charges of tools and plants, scafolding, labour etc. all complete.
1
916
916
... More
PWD S&P SCHEDULE, PAGE NO. 55, ITEM 24
Packing the annular space between the outside of the tube well pipes & strainers and the bore with pea size washed gravel of approved quality having size from 2mm to 5 mm or the size approved by the Engineer-incharge including cost of all materials labour and equipment complete
1
2029
2029
... More
PWD S&P SCHEDULE, PAGE NO. 54, ITEM 18
Supplying, fitting and fixing G.I. cap at top (i) 100mm
1
139
139
... More
PWD S&P SCHEDULE, PAGE NO. 56, ITEM 27
Supplying, fitting and fixing 300 mm M.S. housing clamp of approved quality.
1
2235
2235
... More
PWD S&P SCHEDULE, PAGE NO. 13, ITEM 19(III)
Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I).
(d) 32 mm dia.
(ii) Medium quality
100
169
16900
... More
PWD Building SCHEDULE,Page - 1 / Item -2
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1.500 mm.
6.62
119
789.57
... More
PWD Building SCHEDULE,Page - 35 / Item -22. II)
(II) Cement concrete with 30 mm down graded shingles excluding shuttering.
N.B. Variety. In ground floor
(a) 1:3:6 proportion
0.99
3393
3362.46
... More
PWD Building SCHEDULE,Page - 26 / Item -10. ii)
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(ii ) River Bazree
1.85
4745
8768.76
... More
PWD Building SCHEDULE,Page - 42 / Item -36. Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
10
328
3280
... More
PWD Building SCHEDULE,Page - 43 / Item -40. Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel II. Other than SAIL/TATA/RINL
0.2
64243
12848.6
... More
PWD S&P SCHEDULE,Page - 29 / Item -a) ii)
Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials.
(a) For Exposed Work
(ii) CPVC Pipes Class-2,SDR-13.5
From Storage Tank to Stand Post
25 mm
24
180
4320
... More
PWD S&P SCHEDULE,Page - 37/Item -6 Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer. (b) 2000 litre capacity
1
10434
10434
... More
PWD S&P SCHEDULE,Page - 7 / Item -7. g)
(g) Supplying, fitting and fixing alloy iron with brass spindle bib cock/ stop cock of approved brand and make, spray painted and tested to 21 kg per sq. cm. (i) 15 mm
2
169
338
... More
PWD Building SCHEDULE,Page - 200/Item -1. a)
((b) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
(b) On steel or other metal surface :
With super gloss (hi-gloss) -
(iv) Two coats (with any shade except white)
20
29
580
... More
PWD Building SCHEDULE,Page - 200 / Item - 2. b) iv)
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :
(b) On steel or other metal surface :
With super gloss (hi-gloss) -
(iv) Two coats (with any shade except white)
20
79
1580
... More
WRI&DD SCHEDULE, Champer-12.00, Item - 1(b)
Solar Module: Supply, transport, installation and commissioning of ISI marked solar module as per following specification.
1. Cell: Indigenous mono crystalline silicon SPV cells.
2. Solar Module: Monocrystalline cell with PERC technology/module with bifacial cell
3. Standards: ISI marked as per IS 14286 and having certification of IEC 6183(1), 61730(1&2), 61710
4. Modules must quality to IS 170210(Part 1)
5. Min efficiency 19.5%
6. Fill factor: More than 75%
7. Module wattage mismatch in the SPV array: within +3%
8. Wattage output warranty: Should be less than 90% at the end of 10 years and 80% at the end of 25 years.
9. Power output of individual PV modules used in the PV array, under STC minimum 300Wp.
Necessary test certificate also to be supplied. For detail information please see cl. No 2.1 of technical specification.
b) For 2HP Off-Grid Solar water Pumping System with Monocrystalline/ Monocrystalline PERC/bifacial SPV Modules
2400
32
77496
... More
WRI&DD SCHEDULE, Champer-12.00, Item - 2
Module Mounting Structure:
Supply, transportation & Installation of GI manual tracking/Fixed structure made of MS Hollow Section, Pipes, Plates, angles etc as per IS4923, IS:1161/1239, IS:1079/2062, to hold min 300Wp SPV Module as per drawing and technical specification. The steel structure is to be protected with minimum 80 micron galvanization (hot dip) and provided with fixed arrangement of dual axis manual tracking arrangement for three times in a day and seasonal lilting to face the sun optimally.
350
157
54950
... More
WRI&DD SCHEDULE, Champer-12.00, Item - 3(b)
Power Conditioning Unit consisting of following components and features
1. Variable frequency Drive with inbuilt MPPT, Voltage range suitable for operation pump-motor set of 1HP to 20 HP, detail mentioned in cl 6.1
2. Power input: DC source for 1HP, 2HP and 3HP
3. Power input: AC/DC source or hybrid for 5HP and above
4. Incomer: DC MCB 2 Pole 16 amp upto 5HP, 25 amp for 7.5HP and 10HP, 40 amp for 15 to 20 HP as per IS/IEC 60947-2
5. Incomer: AC MCB 4 Pole 16 amp upto 5HP, 25 amp for 7.5HP and 10HP, 40 amp for 15 to 20 HP as per IS/IEC 60947-2
6. Type II DC SPD of 40 KA
7. Type II AC SPD 40 KA for AC/DC or Hybrid input
8. Dual input (Solar/Grid) 25 amp changeover switch for 5H and 7.5HP, 40 amp for 10HP, 63 amp for 15 to 20 HP
9. Reverse protection diode 1600 VDC with heat sink 10. Data logger
11. Remote monitoring system
12. Should have built –in EMC filters
13. IP 65 glands for cable in and out
14. Min. IP 54 enclosure. For details features, protection, RMS, communication architecture, security Data storage, tolerance or various parameters, standards to be qualified, etc. please refer to cl. 6.1 of technical qualification.
1
32097
32097
... More
WRI&DD SCHEDULE, Champer-12.00, Item - 4
Cable and Accessories:
Supplying, fitting and fixing of UV rated Copper cable laid inside HDPE conduit and other accessories as per following with necessay connection with the Solar PV Module, MPPT etc
I. 4.0 Sqmm Single core multi studs-5m (for 1HP/2HP/3HP)
ii. Lugs, HDPE Pipe, Flexible pipe, saddle, cable tie etc
a) For 1HP/2HP?3HP per structure
1
1134
1134
... More
WRI&DD SCHEDULE, Champer-12.00, Item - 5
Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below:
By ISI-Medium GI pipe including excavation of soil for installation of each electrode and filling & ramming and connection to individual structure to earth electrode including S&F 20mmx3mm galvanized (Hot Dip) MS flat on Wall/floor with GI saddles as required and connecting to equipments incl. drilling holes, with bolts, nuts, washers etc.
1
2661
2661
... More
WRI&DD SCHEDULE, Champer-12.00, Item - 6(a)
Lighting system a scheme (with lighting Pole)
Dusk to dawn lighting arrangement at 4 mts height above ground level, with Hot dip Galvanised 80mmx50mm, medium duty pipe with 12V, 15Ah 2-in-1 Lithium ion/Ferro- Phosphate battery with in-built 7-11 Watt LED lamp, 50 Wp solar panel (min 19% eff.) to cover the scheme area. The lighting system should be warranted for 5years for the date of installation
1
19030
19030
... More
WRI&DD SCHEDULE, Champer-12.00, Item - 7(b)
Lighting protection (Pole mounted): Lighting protection with 3”x1.5” GI pipe of 6m+1m height with base flange in proper RCC foundation and S&F Lighting Conductor Air Terminal made of 20mm dia 1000mm long GI pipe (ISI Medium) having five discharge prongs of 4SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip0 wire and 85 mm dia 6mm thick GI base plate at bottom incl. necessary holes etc. Eating with 65mm dia GI pipe (Medium) 3.0mts long and 1/9/10 stranded GI (Hot Dip) wire (4 mts long) 20mm dia x125mm long galvanized bolt, double nuts, double washers including socketing at both ends of stranded GI (Hot Dip) wire crimping sockets/ thimbles and S&F 65mm dia GI Pipe (ISI-Medium) protection (3 mts. Long) to be filled with bitumen partly under the ground level and partly above the ground level to an average depth of 3.65 Mts. Including connection to earth electrodes with 25x6mm GI strips
1
10683
10683
... More
WRI&DD SCHEDULE, Champer-12.00, Item - 8
Supply and Installation of 3 Phase AC electromotor Pump-motor set with speed of 3000 rpm (synchronous speed) suitable for Solar applications and shall have 60 months guarrentee for folloing conditions including loading, unloading, transportation etc
ii 2 HP 3 phse AC Open well submersible pump wet with exteranal part made of stainless steel of grade 304 or higher as per IS 6911 and IS 3444, for PDW with dischagre of 5.0-6.0 Lps at 16 mts total head with required quantity of flexible deliver pipe (20m), clamps, cable and all other accessories to complete connection of suction and delivery side. the pump motor shoud be tested as per IS 14220:2018(first revision)
1
29838
29838
... More
WRI&DD SCHEDULE, Champer-12.00, Item - 9
Testing and commissioning of scheme after completion of all work
1
2000
2000
... More
WRI&DD SCHEDULE, Champer-12.00, Item - 11
Cleaning and washing of modules once in month with clear water to remove diposited dust and dirt on the dodule surface and deep the modules clean throughout the ear. The activity to be performed for eight months in a year excluding four monsoon months. A log book should be maintained at the site for the said purpose
1
300
300
... More
PWD ROADS SCHEDULE, PAGE NO. 265, ITEM- 8.07
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)
1
2230
2230
... More
Add:- GST @ 18%
1
112626
112626
... More
Add:- Labour CESS@ 1%
1
7383
7383
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%