Zilla Parishad Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Zilla Parishad Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date13 Jan 2025
Closing Soon20 Jan 2025
Tender Amount₹ 3,49,662 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth. [Pg-15 / Item-8.(a) & 3rd Corrigenda & Addenda, DOP-04/06/2018 -Pg-1-2, Sl.no.-4 and ref- Analysis]

25.68

5368

137851.78

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar. (c) 10 mm thick plaster [Pg-189 / Item-1.(ii).(c) & 3rd Corrigenda & Addenda, DOP-04/06/2018 -Pg-49-50, Sl.no.-1 and ref- Analysis]

141.24

130

18438.88

... More
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. [Pg-192 / Item-15 and ref- Analysis]

141.24

32

4627.02

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (upto 20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. i) Pakur Variety. [Pg-26 / Item-10(i) & 3rd Corrigenda & Addenda, DOP-04/06/2018 -Pg-12-13, Sl.no.-33 and ref- Analysis]

7.28

5927

43129.95

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m. (i) Tor steel/Mild Steel.--- III. OTHER MANUFACTURERS NOT SPECIFIED [Pg-43 & 44 / Item-40.(a).(i).(III) & 10th Corrigenda & Addenda, DOP-22/01/2020 -Pg-1, Sl.no.-1 and ref- Analysis]

0.35

53162

18606.72

... More
Hire and Labour Charges for shuttering with hard wood for precast R.C. Slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc, complete in all respect. (only the area in contact with concrete to be measured) [Pg-43 / Item-38]

17.12

94

1609.28

... More
Supplying of Granite/Marble follock display board at site with fitting and fixing by brick work, concreting and plastering in all complete as per direction. [As per Local rate (LS)]

1

800

800

... More
Total Cost (without GST & L.cess)

293390.14

1

293390.14

... More
Add CGST 9%

293390.14

-

26405.11

... More
Add SGST 9%

293390.14

-

26405.11

... More
Total=

346200.36

1

346200.36

... More
Add L. Cess 1%

346200.36

-

3462

... More
Total Cost (including GST & L Cess)

349662.36

1

349662.36

349662

1

349662



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.