Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Zilla Parishad

Bardhaman, West Bengal

  • Opening Date

    03 Sep 2019

  • Closing Date

    18 Sep 2019

  • Tender Amount

    ₹ 4,48,134

  • EMD

    ₹ 9,000

Summary

Repairing Of Road With Laterite Chelly And Moorum From Roy Pukur To Nemai Kundu Houre Via Mondal Para At Belar

BOQ Items
ItemQuantityUnitsRateAmount
... more
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
0 -
... more
(ii) For Construction of Sub Base by consolidating Laterite (90 mm to 45 mm):
110.25Cum 199798.36
... more
Add cost at site of 1.45 m³ of materials to arrive at the complete rate.
0 -
... more
Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification.
0 -
... more
Add cost at site of the materials to arrive at the complete rate. The compaction factor may be taken as 0.67
152.513Cum 233718.55
... more
(The payment is to be made on the basis of the finished compacted volume of moorum.)
0 -
... more
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row
0 -
... more
Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 for Rural Roads of MORD.
0 -
... more
300 mm dia
7.316M 13418.71
... more
Providing, fixing ang writing display board
1No 1200

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.