Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad Tender
Civil And Construction
Construction Material
Eprocure
Opening Date10 Jan 2025
Closing Soon16 Jan 2025
Tender Amount₹ 2,49,000
Costs
EMD
₹ 4,980Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ZPHD_798638_2Tender No
DEBRA-I/14/2024-2025(2nd Call)Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of rain water drainage canal from Halders house to Samiduls pond side at Dalapatipur at mouza Dalapatipur
BOQ Items
... More
Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control,sampling, testing etc. all complete but excludingcost of labour and materials for formwork & reinforcement works
(b) M-20 Grade Using concrete mixer
[p-333, item-18.07 (b)]
15.62
5506
86021.29
... More
Precastcementconcreteblocksor liningunitsasperdesignedsizeand specification, with well graded stone metal aggregate, including dressing, ramming,shuttering, finishingthetopsurfacewith1:3cement andsandmortar, curing, transportingand laying theblocksor lining unitsatworksite inposition, over filter, layer, keepingagapof 6mm between theadjacent units, by sueof removableplyboards or non removable thermocol boards,withall leadsand lifts, includingsupply and carriage of all materials complete. (Therate isexclusiveof thecostofstoneaggregateand itscarriage
uptosite.ConstructionwinghastoaddthecostofsamefromtheSoR ofPW(Roads) toderive theconsolidated rate.Consumptionchart of theUSoRmaybeusedforassessingthequantityofcoarseaggregates per cum of concrete). With Stone Aggregate (Pakur, North Bengal or Rajmahal varieties)
10.9
6643
72422.1
... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
(b) Where staging is not required [ P- 332, Item-18.05(b)]
98.99
214
21183.86
... More
Supplying and laying NP2 Hume Pipe at Side & front of Canal(As per local rate )
4
2000
8000
... More
Supplying, fitting,fixing and necessary writing of Display Board at work site.
NOTE:Cement 0.152 cu.m per100 sq.m.
Item no-15, Page-192 Building Schedule
1
2200
2200
... More
Taking photo at work site (Pre work, ongoing work & complete work)
3
50
150
... More
Unforeseen Items
1
1610
1610.53
... More
GST @18%
1
37607
37607
... More
LC @1%
1
2465
2465.35
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%