Zilla Parishad Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Zilla Parishad - ZP Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date10 Jun 2024
Closing Date24 Jun 2024
Tender Amount₹ 4,85,989 
Notes
Download

Costs

Summary

Construction Of Drain From Momin House To Ariful House

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Implementation of different types of works in different places in Malda district.
Construction of Drain from Momin house to Ariful house at Singia Nayatola at Chanchal G P under Chanchal I Dev Block Malda
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor), (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.

55.08

11291

205

... More
Supplying, fitting and placing HYSD bar reinforcement in superstructure including cost of steel materials and carriage, including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS:280 at every intersection, hooked and bent to corrcet shape and place on forms etc. including cost of black annealed wire and cost of loading, unloading of all steel materials complete as per drawing and technical specification clauses 1002, 1006 and specification for Rural Roads, MORD.

0.77

54225

70544

... More
Brick work with 1st class bricks in cement mortar (6:1) in foundation and plinth……

30.6

151439

4949

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface], (i) With 1:6 cement mortar, (c) 15 mm thick plaster,

244.8

34761

142

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per 100 sq.m.

244.8

8323

34

... More
– Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)

1.08

10104

9356

... More
Earthwork in filling foundation trenches or plinth with good earth in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete. A) With earth obtained from excavation of foundation

15.3

1186

77.54

... More
Sub Total

-

-

-

... More
GST 18%

1

73637

1

... More
CESS 1%

1

4827

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.