Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad - ZP Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date10 Jun 2024
Closing Date24 Jun 2024
Tender Amount₹ 4,85,989
Costs
EMD
₹ 9,720Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Construction Of Drain From Momin House To Ariful House
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ZPHD_690797_20Tender No
WBZP/MALDA/NIT 71e/2023-24/1-20Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://https://maldazillaparishad.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Implementation of different types of works in different places in Malda district.
Construction of Drain from Momin house to Ariful house at Singia Nayatola at Chanchal G P under Chanchal I Dev Block Malda
BOQ Items
Hire and labour charges for shuttering with centering and
necessary staging upto 4 m using approved stout props and
thick hard wood planks of approved thickness with required
bracing for concrete slabs, beams and columns, lintels curved
or straight including fitting, fixing and striking out after
completion of works (upto roof of ground floor), (a) 25 mm to 30
mm thick wooden shuttering as per decision & direction of
Engineer-In-Charge.
55.08
11291
205
Supplying, fitting and placing HYSD bar reinforcement in superstructure including cost of steel materials and carriage, including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS:280 at every intersection, hooked and bent to corrcet shape and place on forms etc. including cost of black annealed wire and cost of loading, unloading of all steel materials complete as per drawing and technical specification clauses 1002, 1006 and specification for Rural Roads, MORD.
0.77
54225
70544
Brick work with 1st class bricks in cement mortar (6:1) in foundation and plinth……
30.6
151439
4949
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar
including rounding off or chamfering corners as directed and
raking out joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground floor).[Excluding
cost of chipping over concrete surface], (i) With 1:6 cement
mortar, (c) 15 mm thick plaster,
244.8
34761
142
Neat cement punning about 1.5mm thick in wall, dado, window
sill, floor etc. NOTE:Cement 0.152 cu.m per 100 sq.m.
244.8
8323
34
– Providing & fixing Concrete Sign Board as per IRC specification
of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with
pakur variety stone chips reinforced with double layer IRC febric
(75 x 75 mm. mesh) and fixed with necessary nuts & bolts on
two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of
which top 750 mm. is of section 100 x 13 mm. and 1.90 metre
above GL & 0.75 metre below GL including digging hole,
repacking the same with cement concrete 1:3:6 with jhama khoa
or with local stone chips etc. complete including painting two
coats on both faces lettering sign marks etc. as per direction of
the Engineer-in-Charge. (The rate is inclusive of cost of
reinforcement, concrete, shuttering, nuts & bolts, washer etc.
complete.)
1.08
10104
9356
Earthwork in filling foundation trenches or plinth with good earth in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete. A) With earth obtained from excavation of foundation
15.3
1186
77.54
Sub Total
-
-
-
GST 18%
1
73637
1
CESS 1%
1
4827
1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements