Zilla Parishad Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad - ZP Tender
Civil And Construction
Building Construction
Eprocure
Opening Date1 Mar 2025
Closing Date15 Mar 2025
Tender Amount₹ 11,81,261
Costs
EMD
₹ 23,625Document Cost
₹ 3,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ZPHD_821546_5Tender No
Kalna-I PS/14/2024-25(3rd Call)Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://https://www.burdwanzp.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cement concrete with graded stone ballast (40 mm size excluding shuttering)
In ground floor
(A) [Pakur Variety]
(a) 1:3:6 proportion
8.06
4830
38928.35
... More
25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface).
5.73
261
1494.23
... More
Brick work with 1st class bricks in cement mortar (1:6) a) In foundation and plinth
6.01
4812
28900.87
... More
b)In superstructure ground floor (6:1)
15.23
5035
76698.66
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety
38.11
5530
210778.43
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof)
221.54
328
72666.4
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups,binders etc. , initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape,placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction. a)For works in foundation basement upto roof of ground floor/upto 4 mtr.
3.84
54806
210456.69
... More
125 mm thick Brick work with 1st class bricks in cement morter (4:1) in ground floor level.
Extra for using approved H.B. netting in every 3rd layer in 16 & 17 of Subhead A above in any Floor.
25.05
705
17658.98
... More
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should
be correted upto three decimals). (e) Sal : Malayasian
0.2
75572
15303.33
... More
Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as
per direction. (Cost of concrete will be paid separately)
(a) 40mm X 6mm, 250mm Length
36
29
1044
... More
Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark.
(vii) 100mm. X 58mm. X 1.90mm.
36
47
1692
... More
Iron socket bolt of approved quality fitted and fixed complete.
(d) 225mm long x 10mm dia bolt.
2
77
154
... More
(c) 150mm long x 10mm dia bolt.
12
63
756
... More
Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with 16mm dia rod with centre bolt and round fitting
(c) 300mm long.
2
166
332
... More
Iron catch hook of approved quality fitted and fixed to shutter and chowkat.
(c) 10mm dia x 300mm long.
12
82
984
... More
Anodised aliminium D-type handle of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 230/72) fitted and fixed complete:
(a) With continuous plate base (Hexagonal/ Round rod)
(v) 125 mm grip x 12 mm dia rod.
4
103
412
... More
Supplying, fitting and fixing hinge cleat in position excluding the cost hinge and other fiffitngs.
b) with 75mm iron Butt-hinge
ii) Sal : Malayasian
16
36
576
... More
Renewing 125mm long wooden buffer block
ii) With Sal : Malayasian
16
51
816
... More
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour.
In ground floor.
3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement).
Using grey cement
(iii) 35 mm. thick
58.83
323
19002.09
... More
Styles and rails of wooden shutters fitted and fixed complete. (Payment to be made on area of new work only). In Ground Floor:
(iv) 40mm. Thick shutter.
(a) Ordinary Teak Wood.
11.3
3375
38131.76
... More
M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor.
(Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor)
(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.
105
98
10382.4
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar
(c) 10 mm thick plaster
67.56
123
8309.88
... More
(b) 15 mm thick plaster
81.9
152
12449.48
... More
(i) With 1:6 cement mortar (b) 20 mm thick plaster
81.94
155
12700.39
... More
(c) 15 mm thick plaster
139.61
136
18986.96
... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.
29.09
34
989.2
... More
White washing including cleaning and smoothening surface thoroughly.
All floors :
(c) Three coats (on new works only).
144.58
20
2893.01
... More
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification.
In Ground floor: (iii) Two coats
207.48
49
10166.54
... More
Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand
papering etc.
13.68
38
519.84
... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
8.64
29
250.56
... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :
(a) On timber or plastered surface :
With super gloss (hi-gloss) -
(iv) Two coats (with any shade except white)
49.25
81
3989.09
... More
(b) On steel or other metal surface :
With super gloss (hi-gloss) -
(iv) Two coats (with any shade except white)
8.64
79
682.56
... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992
(A) (i) Single Socketed 3 Meter Length
(b) 110 mm
4
349
1396
... More
Cost of Ramp
1
18452
18452.15
... More
Add Cost of Electrification
1
7500
7500
... More
Add Cost of Furniture
1
100000
100000
... More
GST 18 .00%
1
178408
178408.1
... More
1.00 % Labour welfare Cess
1
11695
11695.57
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%