Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad - ZP Tender
Civil And Construction
Building Construction
Eprocure
Opening Date25 Dec 2024
Closing Date7 Jan 2025
Tender Amount₹ 11,29,175
Costs
EMD
₹ 22,583Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ZPHD_790626_8Tender No
WBMDT-BRP/16-BDO/APD/2024-25Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://http://alipurduarzp.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
(I) Cement concrete with graded stone ballast (40 mm size
excluding shuttering) In ground floor (B) [N.B Variety] (a) 1:3:6 proportion Taking Same Qty. of Singe Brick Flat Soiling x 0.075
8.06
5189
41823.34
... More
25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and dmixture of water proofing compound as per manufacturer's pecification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface).
5.73
267
1529.91
... More
Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth
6.01
4928
29617.28
... More
Brick work with 1st class bricks in cement mortar (1:6)
(b) In Super Structure, ground Floor
15.23
5151
78465.18
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety.
38.11
5515
210185.21
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4mm, using approved scout props and thick hard wood planks of approved thickness with required bracings for concrete slabs, columns, lintels, beams etc. curved or straight, including fitting, fixing and striking out after completion of works (upto roof of ground floor). a) 25 mm to 30 mm thick wooden shuttering as per decision and direction of the Engineer-in-Charge.
221.54
330
73109.52
... More
Reinforcement for reinforced concrete work in all sort of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary) cutting to requisite length, hooking and bending to correct shape, placking in proper position and binding with 16 gauge black annealed wire at every inter- section, complete as per drawing and direction.
3.84
60003
230411.52
... More
125mm thick brick work with 1st class bricks in cement mortar (4:1) in ground floor. Extra for using approved H.B netting in every third layer in 16 & 17 of subhead A above in any floor
25.05
677
16957.5
... More
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). (e) Sal : Malayasian
0.2
76096
15447.49
... More
Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) asper direction. (Cost of concrete will be paid (a) 40mm X 6mm, 250mm Length
36
29
1044
... More
Iron butt hinges of approved quality fitted and fixed with steel crews, with ISI mark. vii) 100mm. X 58mm. X 1.90mm
36
47
1692
... More
Iron socket bolt of approved quality fitted and fixed complete.
(d) 225mm long x 10mm dia bolt.
2
77
154
... More
Iron socket bolt of approved quality fitted and fixed complete.
(c) 150mm long x 10mm dia bolt.
12
63
756
... More
i) Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with 16mm dia rod with centre bolt and round fitting.
c) 300mm long
2
166
332
... More
Iron catch hook of approved quality fitted and fixed to shutter and chowkat.
c) 10mm dia x 300mm long.
12
82
984
... More
Anodised aliminium D-type handle of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 230/72) fitted and fixed complete:
For Door
(v) 125 mm grip x 12 mm dia rod
4
103
412
... More
Supplying, fitting and fixing hinge cleat in position excluding the cost hinge and other fiffitngs b) with 75mm iron Butt-hinge ii) Sal : Malayasian
For Door
16
36
576
... More
Renewing 125mm long wooden buffer block
i) With Sal : Siliguri
16
48
775.2
... More
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement (iii) 35 mm. thick
58.83
322
18943.26
... More
Styles and rails of wooden shutters fitted made on area of new work only). In GroundFloor: (iv) 40mm. Thick shutter
11.3
3229
36481.24
... More
(a) M.S.or W.I. Ornamental grill of approved design joints
continuously welded with M.S, W.I. Flats and bars of windows,
railing etc. fitted and fixed with necessary screws and lugs in ground
floor (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr
105
98
10382.4
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking outs joints or roughening of concrete surface by chamfering etc. including throating, nosing and drip course where necessary (Ground floor). Excluding
cost of chipping over concrete surface] (ii) With 1:4 cement mortar
a) 10mm thick plaster.
67.56
127
8580.12
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including
rounding off or chamfering corners as directed and raking outs joints or
roughening of concrete surface by chamfering etc. including throating,
nosing and drip course where necessary (Ground floor). Excluding
cost of chipping over concrete surface] (ii) With 1:4 cement mortar
b) 15mm thick plaster.
81.91
158
12940.99
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including
rounding off or chamfering corners as directed and raking outs joints or
roughening of concrete surface by chamfering etc. including throating,
nosing and drip course where necessary (Ground floor). Excluding
cost of chipping over concrete surface] (i) With 1:6 cement mortar
b) 20 mm thick plaster.
81.94
163
13355.89
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking outs joints or roughening of concrete surface by chamfering etc. including throating, nosing and drip course where necessary (Ground floor). Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar c) 15 mm thick plaster.
94.41
142
13406.22
... More
Neat cement punning about 1.5mm thick in wall, dado, window, sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
29.09
34
989.2
... More
White washing including cleaning and smoothening surface thoroughly. (c) Three coats (on new works only).
144.58
20
2893.01
... More
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification. (i) Two
coats.
162.21
49
7948.29
... More
b) Priming one coat on timber or plastered surface with synthetic oil
bound primer of approved quality including smoothening surfaces by sand papering etc
13.68
38
519.84
... More
a) Priming one coat on steel or other metal surface with synthetic oil
bound primer of approved quality including smoothening surfaces by sand papering etc.
Window Grill
8.64
29
250.56
... More
A) Painting with best quality synthetic enamel paint of approved make and
brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :
(a) On timber or plastered surface :With other than hi-gloss of approved quality- (iv) Two coats (with any shade except white)
Door
49.25
81
3989.09
... More
b) On steel or other metal surface :With super gloss (hi-gloss) -
Window Grill
8.64
79
682.56
... More
Supplying fitting fixing UPVC Pipe with all necessary clamps nails including making holes in walls. (110mm dia) single socketed 3meter length
4
348
1392
... More
Add Electification works (as per voucher payment )
1
7500
7500
... More
Add Furniture ( as per voucher payment)
1
58000
58000
... More
GST @18%
1
170542
170542
... More
Cess @1%
1
11179
11179
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements