Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date28 Nov 2024
Closing Date6 Dec 2024
Tender Amount₹ 1,25,082
Costs
EMD
₹ 2,502Document Cost
₹ 250Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ZPHD_775395_13Bid Award Id
ViewTender No
195/(6)/belegp(15thCFCG)/24-25Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
New construction of concrete drain with cover from Sanatan Gayen house to Hirulal Gayen house ( ID 89243674)
BOQ Items
... More
250mm th Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth
6.75
5367
36231.98
... More
15 mm Plaster to wall with sand and cement morter (1:4) including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface, including throating, nosing and drip course complete.
52.5
163
8570.1
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety
2.69
6121
16471.46
... More
Reinforcement for reinforced concrete work in all sorts of structures including istribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
253.46
54
13819.11
... More
Net cement punning about 1.5mm th.in wall dado.
52.5
32
1719.9
... More
Earth work in back filling (1/5 of excavated earth)
3.19
77
247.16
... More
PCC WORK TESTING Determination of Aggregate Impact Value as per IS: 2386 (Part – IV)
1
690
690
... More
Grading by Sieve Analysis as per IS: 2386 (Part – I)
1
460
460
... More
Compressive Strength Test of Concrete Specimen as per IS: 516
1
280
280
... More
Compressive Strength Test of Concrete Specimen as per IS: 516
1
280
280
... More
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)
1
2230
2230
... More
Add GST @18.00% ( SGST 9.00% + CGST 9.00% )
1
18704
18704.39
... More
Add Labour welfare cess @1.00%
1
1226
1226.18
... More
Add Contingency 1%
1
1238
1238.44
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements