Zilla Parishad Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Zilla Parishad Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date27 Jun 2024
Closing Date12 Jul 2024
Tender Amount₹ 1,36,017 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth

11.4

57145

5012.36

... More
1/2 th Brick work with 1st class bricks in cement morter (4:1) in a) Superstructure.

13.96

9165

656.56

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](i) With 1:4 cement mortar (c) 15 mm thick plaster

15.48

2291

148

... More
Neat cement punning about 1.5 mm thick; (Cement - 0.152 m3 per % m2.

15.48

508

32.85

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 A) (iii) Single Socketed 3 Meter Length b) 110 mm

8

2336

292

... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 B) (ii) Plain Tee b) 110 mm

8

680

85

... More
Reinforcement Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes A) Pakur Variety

1.99

10483

5270.49

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL

198.86

10543

53.02

... More
Hire and labour charges for shuttering with out staging slab, after completion of works. 25mm to 30mm shuttering without staging in fdn.

1.38

282

205

... More
(a) Hire and labour charges for shuttering with cencering and necessry staging upto 4 m using approved stout props of slab, beams, columns, lintels curved or straight in/c fixing and after completion of works.

9.61

3150

328

... More
Supplying, fitting and fixing in position R.C.C. Manhole/ pit cover of approved make with rim of approved make (Heavy type) i) 450 mm dia

4

1104

276

... More
Add 9.00% SGST of Total Cost

1

9975

9975

... More
Add 9.00% CGST of Total Cost

1

9975

9975

... More
Add 1.00% for Lab. Welfare Cess

1

1308

1308

... More
Add contingency

1

3923

3923.66



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.