Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad Tender
Civil And Construction
Building Construction
Real Estate Service
Eprocure
Opening Date9 Oct 2023
Closing Date9 Oct 2023
Tender Amount₹ 3,49,979
Costs
EMD
₹ 7,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_ZPHD_581497_2Bid Award Id
ViewTender No
KAM/133/2023Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
a) M 15 Grade (75mm layer)
4.97
26327
5297.26
... More
Ordinary cement concrete (M-20) (Mix- 1:1.5:3) with graded stone chips(20mm down) excluding shuttering and reinforcement, if any ground floor. As per IS 456-2000 (Pakur).
16.37
97106
5932
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-InCharge
84.62
28347
335
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
1.48
81274
54915.1
... More
Supplying and laying polythene sheet (150 gm/sq.m.) over damp proof course or below flooring or roof terracing or in foundation or foundation trenches.
127.6
3062
24
... More
Earth work in Filling in foundation or plinth by with good earth in layer not exceeding 150mm including watering and ramming by layer complete a) With earth obtained from excavation of foundation
16.87
1308
77.54
... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
8.29
7784
939
... More
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
4.76
2127
447
... More
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.
3.12
6102
1956
... More
Taking out carefully G.C.I. or C.I. or asbestos sheets (including ridges etc.) from roof or wall after unscrewing bolts, nuts, screws etc.and stacking the material at site as directed.
73.24
3002
41
... More
Preparation of Concrete Specimen & Compressive Strength Test as per IS: 1199 & 516
1
1040
1040
... More
Providing Display Board of size 300 mm x 300 mm made of marble fitted on the top of brick pillar (1:6) finished with plaster (1:4) & neat cement finish .
1
2000
2000
... More
Submissin of two set of photographs for prework, during work & post work pictorial view of different stages of work.
1
200
200
... More
Total Estimated Cost =
293656.23
293656
1
... More
Add CGST (9%)=
293656.23
26429
0.09
... More
Add SGST (9%)=
293656.23
26429
0.09
... More
Total =
346514.35
346514
1
... More
Add Cess (1%)=
346514.35
3465
0.01
... More
Grand Total =
349979.49
349979
1
... More
Say =
349979
349979
1
Evaluation Notes How It Works ?
Potential Partner