Zilla Parishad Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad - ZP Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date5 Jul 2022
Closing Date13 Jul 2022
Tender Amount₹ 6,88,848
Costs
EMD
₹ 14,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Infrastructure Strengthening Work Of Hwc
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_ZPHD_388422_1Bid Award Id
ViewTender No
WB APD II/NIT 2(e) -BDO/APD/2022-23(2ND CALL)Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://http://alipurduarzp.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes (ii ) River Bazree..
19.31
-
4745
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and
bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction a) For works in foundation, basement and upto roof of ground
floor/upto 4 m
(i) Tor steel/Mild Steel I. SAIL/ TATA/RINL b)Extra For works beyond the roof of ground floor/initial 4 m
(i) Upto 4 th floor roof in each addl. floor
1.66
-
59102.09
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(f) 25 mm to 30 mm thick wooden shuttering without staging as per decision & direction of Engineer-In-Charge
50
-
205
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor (a) 25 mm to 30 mm thick wooden shuttering with staging as per decision & direction of Engineer-In- Charge
20
-
328
... More
Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth
8.19
-
5172
... More
(b) In superstructure, ground floor
15.93
-
5397
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. I) in first floor.
16.4
-
674
... More
Earth work in filling in foundation trenches orvplinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of
foundation.
3.15
-
78.31
... More
A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
21.6
-
521.07
... More
Artificial stone in floor, dado, staircase etc with cement
concrete (1:2:4) with stone chips, laid in panels as directed
with topping made with ordinary or white cement (as
necessary) and marble dust in proportion (1:2) including
smooth finishing and rounding off corners including raking
out joints or roughening of concrete surface and application
of cement slurry before flooring works using cement @ 1.75
kg/sq.m all complete including all materials and labour.
In ground floor.
3 mm. thick topping (High polishing grinding on this item is
not permitted with ordinary cement).
Using grey cement. (iii) 35 mm. thick
32
-
327
... More
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). (d) Sal : Local. I) in ground floor
0.42
-
82403
... More
Shutter of 1/3rd panel, 2/3 glazed of doors and windows, as per design (each
panel consisting of a single plank without joint and with ordinary glass of 7.4 kg
per Sq.m/3mm Thick) fitted with putty bed, teak wood bead and nails including
fitting and fixing shutters in position but excluding the cost of glass , putty , teak
bead, nails, hinges etc. and other fittings, in ground floor. (ii) 40mm thick shutters with 19mm thick panel.
5.65
-
3955
... More
Z-batten shutters of door and window as per design havings
tongued and groove-half lap jointed as per direction of the
Engineer-in-Charge including fitting and fixing shutter in
position, but excluding the cost of hinges and other fittings in
ground floor.B) Shutter with 19mm thick planks, 19mm thick battens.
6.4
-
2616
... More
Glazed shutters of doors, windows, fan light, clerestory windows etc. as per design (with ordinary glass of 7.4kg./sq.m. 3mm. Thick) fitted with putty bed and teak wood bead and nails including fitting and fixing shutter in position but excluding the cost of hinges and other fittings. cost of glass, putty, wooded beads etc.will be paid separatel. (i) 40mm thick shutters. (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak.
3.11
-
3042
... More
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor)
(i) Grill weighing above 10 Kg./sq.mtr and up to 12 Kg./sq. mtr.
0.6
-
10021
... More
Labour for Chipping of concrete surface before taking up Plastering work.
50
-
21
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](i) With 1:6 cement mortar
20
-
148
... More
(ii) With 1:6 cement mortar
122.34
-
148
... More
(ii) With 1:4 cement mortar
75.42
-
197
... More
(ii) With 1:4 cement mortar, Ceiling
32.64
-
135
... More
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
40
-
34
... More
White washing including cleaning and smoothening surface thoroughly. All floors :
(c) Two coats.
273.18
-
18.14
... More
Colour washing with "ELLA" with a coat of white wash priming
including cleaning and smoothening surface thoroughly . ((i) Internal (all floors). (b) Two coat
154.98
-
21.53
... More
(ii) External surface (ground floor). (b) Two coats
75.42
-
21.77
... More
(b) Priming one coat on timber or plastered surface with synthetic oil
bound primer of approved quality including smoothening surfaces by sand
papering etc
28.4
-
38
... More
A) Painting with best quality synthetic enamel paint of approved make
and brand including smoothening surface by sand papering etc. including
using of approved putty etc. on the surface, if necessary(a) On timber or plastered surface : With super gloss (hi-gloss)(iv) Two coats (with any shade except white)
28.4
-
81
... More
(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
1.68
-
29
... More
A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (b) On steel or other metal surface. With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
1.68
-
79
... More
Construction of septic tank of different capacities as per approved
drawing with 1st class brick work in cement mortar (1:4) including two
560 mm dia. R.C.C. manhole cover(heavy type)of approved make
supplied, fitted and fixed in the 100mm thick R.C.C (1:1.5:3) top slab
with necessary fittings, 20mm thick cement plaster (4 : 1) with neat
cement finish to the internal surfaces and 15 mm thick cement plaster (4
: 1) to outside wall upto 200 mm below G.L floor finished with 25 mm
thick grey artificial stone over 100 mm thick R.C.C(1:1.5:3) bottom slab
including supplying, fitting and fixing all necessry specials, fittings,
S.W. tees, C.I. foot rest etc. including excavation earth in all sorts of
soil, shoring, bailing out and pumping out water as necessary, ramming,
dressing the bed and fefilling the sides of the tanks with earth, removing
spoils, filling up the chamber with clear water, removing foreign
materials from the chamber and including constructing attached
inspection pit as per approved drawing and connecting all necessary
pipes, joints etc. with internal plaster work and artificial stone flooring
is to be done with admixture of water proofing compound @ 0.5% by
weight of cement with all costs of labour and materials(i) For 10 users. B) With Bazree(N.B Varity
1
-
36352
... More
Construction of circular soak well 2.5 metre deep in all types of sandy
soils with dry brick work upto 1.6 metre from the bottom having 150 mm
intermediate cement brick work (1:4) band all round and cement brick
work (1:4) upto 0.90 metre from top with 20mm thick cement plastering
(1:4) to inside face upto the depth of cement brick work, 15mm thick
cement plaster (1:4) on outer face from top of the well upto G.L. and 6 mm thick cement plaster (1:4) on top of the R.C.C. cover slab including
filling bottom 1.00 metre of inside of the well with brick metal (50 mm to
63 mm size) including R.C.C. cover slab of 100 mm thick with cement conc (1:1.5:3) with stone chips with necessary reinforcement and
shuttering including one 560 mm dia. R.C.C. manhole cover (heavy
type)of approved make supplied, fitted and fixed in the cover slab with
necessary fittings, making nacessary arrangements for pipe connections,
excavation of well including shoring, dewatering and removing the
exess earth from the premises as per direction complete in all respect
with all costs of labour and materials.
With 250 mm thick dry brick work and 250 mm thick cement brick work
(1:6) and 1.00m inside dia.
1
-
16763
... More
Sanitary and Plumbing Fitting, W.C, UPVC pipe with proper fixing arrangements, PVC water Tank, Basin etc. (L.S) (Details in Bill)
1
-
12400
... More
Electrification (L.S)
1
-
10000
... More
Supplying fitting and fixing door and windows fittings as per direction of Engineer in charge . ( Payment will be made as per P.W.D.Schedule 2017)
1
-
4000
... More
GST 12%
565790.32
-
0.12
... More
Cess 1%
638864.72
-
0.01