Zilla Parishad Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Zilla Parishad Tender
Civil And Construction
Road Construction
Eprocure
Opening Date17 Feb 2025
Closing Date25 Feb 2025
Tender Amount₹ 1,78,272
Costs
EMD
₹ 3,565Document Cost
₹ 300Tender Fee
Refer Documents
Summary
Construction Of Concrete Road From Debu Mondal House To Pancha Mondal House
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ZPHD_816136_4Tender No
WB/S24PGS/ PGP/147/2024-25Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying,Spreading &Compacting Silver Sand to requisite thickness in layer not exceeding 150mm to proper gradient and camber including watering, ramming etc all complete as directed.
12.6
936
11796.25
... More
Brick soling with picked jhama bricks including preparation of bed as
necessary with brick joints properly filled in and packed with powdered
earth and including necessary cushion of similar material below the
soling (and in between layers when more than one layer is used)
completes as per direction
(a) Single brick flat soling (thickness 75 mm)
1x(85.0m-61.50m)=23.50mx1.68m=39.48 sqm
1x15.0mx1.68m=25.20 sqm
Total=64.68 sqm
64.68
339
21926.52
... More
Supplying &laying Polythene Sheet properly over the Single layer Brick Flat solling layer before concreting the road
168
24
4032
... More
Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge(excluding bottom plugging) with coarseaggregates of appropriate nominal size andgrading, fine aggregate (sand) conforming toproper grading zone, both of approved quality andcement, as necessary, including labour, cost and
carriage of all materials and including preparationof design mix, approval of the same by theEngineer-in-Charge and cost for quality control,sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
(b) M-20 Grade
16.8
5779
97088.38
... More
Hire and labour charges for Shuttering with orwithout staging upto 4.0 m height using approvedstout props with wooden planks/ply wood/steelsheet plate with required bracing for any kind ofplain or reinforced concrete works in all sorts of
minor structure including culvert, box culvert, crossdrain etc. The rate isinclusive of fitting, fixing andstriking out aftercompletion of work as perspecification and direction.
(b) Where staging is not required
20
214
4280
... More
Material Test-Compressive StrengthTest of Concrete Specimen as per IS:516-@280.00/- x 3 Nos Concrete Cube=840.00
1
840
840
... More
Construction of necessary Display Board including setting of Marble Tiles with necessary lettering etc. to disply the schematic details,as per instruction of E.I.C. with 3 copies of photo pre work, ongoing work and post work with thermocol as construction joints.
1
2230
2230
... More
ADD 9% CGST
1
13462
13462
... More
ADD 9% SGST
1
13462
13462
... More
ADD 1% LW CESS
1
1765
1765
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements