West Bengal Tribal Development Cooperative Corporation Limited Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
West Bengal Tribal Development Cooperative Corporation Limited - WBTDCC Tender
Civil And Construction
Eprocure
Opening Date13 Oct 2022
Closing Date9 Nov 2022
Tender Amount₹ 25,74,596 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 77,238Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_WBTDL_413953_1Bid Award Id
ViewTender No
1641/WBTDCC/ENGGTender Authority
West Bengal Tribal Development Cooperative Corporation Limited ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In first floor including roof.
51.15
-
497
Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.
1402.92
-
19
Labour for taking out door and window frame including shutter for repair or replacement of different parts of the frame & refixing the same including mending good all damaes complete. (a) Upto area 2.5 Sq.m
24.13
-
119
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per
direction of Engineer in charge
616.58
-
166
Earth work in excavation of foundation trenches in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading
or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. d) for excavation in morum soil (a) Depth of excavation not exceeding 1,500 mm
80.37
-
140.09
Filling in foundation or plinth by fine sand in layers not exceeding 150 mm. as directed and consolidating same by thorough saturation with water ramming complete, including the cost of supply of sand. (Payment to be made on measurement of finished quantity)
114.8
-
599.61
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand.
223.9
-
344
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.a) Pakur Variety. Ground floor
17.78
-
5784.38
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. in ground floor
413.73
-
321
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches
253.84
-
24
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (iv) With local hard blackstone variety chips (crusher broken). In ground floor
63.63
-
6327.05
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16
gauge black annealed wire at every intersection, complete as per drawing and direction I. SAIL/ TATA/RINL
8.99
-
59704.83
Brick work with 1st class bricks in cement mortar (6:1) (a) In foundation and plinth
2.04
-
5140
Brick work with 1st class bricks in cement mortar (6:1) (b) In super structure
26
-
5362
Brick work with 1st class bricks in cement mortar (6:1) ( C) Parapet on First Floor
7.65
-
5473
25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately)
8.71
-
197
Labour for Chipping of concrete surface before taking up Plastering work.
144.33
-
21
Collapsible gate with 40mm x 40mm x 6mm Tee as top and bottom guide rail, 20mm x 10mm x 2mm vertical channels 100mm apart in fully stretched position 20mm x 5mm M.S. flats as collapsible bracings properly rivetted and
washered including 38mm steel rollers including locking arrangements, fitted and fixed in position with lugs set in cement concrete and including cutting necessary holes, chasing etc. in walls, floors etc. and making good damages
complete.
2.86
-
4330
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or rougening of concrete surface, including throating, nosing and drip course
where necessary (ground floor) (a) 10 mm. thick plaster (1:4) to celling
143.2
-
123
(b) 20 mm. thick plaster (1:4) to inside wall
160.99
-
174
(c) 15 mm. thick plaster(1:4) to outside wall,
187.57
-
152
(d) 15 mm. thick plaster(1:4) to outside wall, to First Floor
78.58
-
156
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor
etc.
44.9
-
34
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps (d) Sal : Local.
0.04
-
72954
Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings. (ii) 40mm thick shutters with 19mm thick panel of size 30 to 45 cm (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak.
1.9
-
2968
Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (b) 40mm X 6mm, 200mm Length
6
-
25
Anodised aluminium butt hinges of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 205/66) and fitted and fixed with cadmium plated screws: (ix) 125 x 75 x 4.0mm.
4
-
113
Anodised aliminium D-type handle of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 230/72) fitted and fixed
complete: (iv) 125 mm grip x 10 mm dia rod
2
-
95
(i) Door stopper.(Brass)
1
-
117
Anodised aluminium barrel / tower / socket bolt (full covered) of approved manufactured from extruded section conforming to I.S. 204/74 fitted and fixed with cadmium plated screws:(viii) 225mm long x 12mm dia. Bolt
2
-
114
(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. Grill
24.45
-
29
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (b) On steel or other metal surface :
(ii) Two coats (white in shade)
24.45
-
77
(b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc-----Both side
4.62
-
38
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface :
(iv) Two coats (with any shade except white)
4.62
-
81
Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC (a) One Coat i) Water based interior grade Acrylic Primer
304.19
-
30.8
Synthetic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface. Two Coats
304.19
-
68
Cement washing including cleaning and smoothening surface thoroughly (cement to be used @15 kg./100 sq.m. of surface for one coat and @25 kg./100 sq.m of surface for two coats): (b) Two coats (on new works only) Quantity same as Outside plaster, Ground Floor
187.57
-
14.24
Quantity same as Outside plaster, First Floor
78.58
-
14.95
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor: (a) One Coat Quantity same as Outside plaster, Ground Floor
187.57
-
31.4
Quantity same as Outside plaster, First Floor
78.58
-
32.11
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in- Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.In Ground floor (Two Coat) b) Premium 100% Acrylic Emulsion
187.57
-
84
Quantity same as Priming Surface, First Floor
78.58
-
84.71
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including
smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour . In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement) (ii) 25 mm. thick
131.92
-
269
Sub Total
-
-
-
Add @ 7.5% Electrification cost
1
-
154209.28
Sub Total
-
-
-
Adding GST 12 %
1
-
265239.96
Sub Total
-
-
-
Adding Labour Cess @ 1 %
1
-
24755.73
Sub Total
-
-
-
Add Contingency @ 3 %
1
-
74267.19
Sub Total
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements