West Bengal Transport Infrastructure Development Corporation Limited Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
West Bengal Transport Infrastructure Development Corporation Limited - WBTIDC Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date8 Jul 2024
Closing Date29 Jul 2024
Tender Amount₹ 56,92,309
Costs
EMD
₹ 1,13,846Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WBTID_706818_2Bid Award Id
ViewTender No
04/WBTIDC/2024-25Tender Authority
West Bengal Transport Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing of rubbish as directed within a lead of 75 m.
In ground floor including roof
(b) above 150 mm. thick
5
7085
1417
Grouting the foundation bolt (by HILTI method ) for vertical post, base plate as per the direction & instruction to the satisfaction of Engineer-in-charge.
42
504000
12000
Dismantling & Removal of existing utility service oil line, electricity lines etc. stacking of dismantled material, disposal of unserviceable material and stacking, dismantled the serviceable line (material) with all lifts and lead (as per Technical Specifications and after repairing) reinstallation of existing utility service oil line & others electicity lines as per the direction & instruction to the satisfaction of Engineer-in-charge.
150
159375
1062.5
Crop & renewal of existing damaged steel structural members of pathway with required tested steel members/plates (all structural steel member of IS:2062) E 250 grade & fittings, internal scantlings with steel materials of required dimensions satisfying ship building / ship repairing qualityunder instruction & satisfaction of Engineer-in-charge. MaterialsTesting certificate to be produced.
16.6
2490166
150010
Inspection and Preparation of drawings of existing structures with necessary detailing prior execution of the works including checking of the existing strutures. Submission of drawings with all necessary addition if required after checkings the design calculation and saftey of the existing report under instruction & satisfaction of Engineer-in-charge.
1
85250
85250
Providing and placement of the steel bearing plates for the four vertical post under instruction & satisfaction of Engineer-in-charge.
4
63020
15755
Encasing the four vertical post with steel frame box providing and fabrication including of steel plates as per requirements with using the anchor fasteners under instruction & satisfaction of Engineer-in-charge.
4
154400
38600
Making arrangements for lifting the existing Pathway/Foot Bridge from the concrete and holding both ends on wooden blocks in position using hydraulic jack prior to replacing the bearing plates and positioning the same after crop and renewal of the four vertical post.
4
222400
55600
The fender made of 200 mm half round MS pipe with 8.0 mm thickness shall be fixed on the berthing side of existiong concete Jetty with fastners: Vertical: 5 Nos. X 3.5 m with MS doubler plate (8.0 mm) welded with hull under instruction & satisfaction of Engineer-in-charge.
2.5
375025
150010
The Structural Footh Bridge/ pathway and old concrete jetty shall be shot /sand blasted prior to apply initial primer coatings under instruction & satisfaction of Engineer-in-Charge.
900
331200
368
40 mm. thick damp proof course with cement concrete (1:1.5:3) (with graded stone chips 20 mm nominal size) with water proofing compound of approved brand @ 0.2% weight of cement including cost of materials over two coats of non toxic acrylic polymer modified cementitious waterproofing slurry coat complete [cost of water proofing compound and non toxic paint to be paid seperately) for underground water retaining structures.
165
46530
282
Extra rate for using water proofing and plasticising admixture @ 0.2% by weight of cement (or at manufacturer's specified rate) for concrete of various grades.
2
238
119
Applying 2 coats of Non-Toxic Acrylic Polymer modified Paint having adhesive & waterproofing properties by mixing in proportion (1 liquid: 4 cementitious material) or as per manufacturer's specification for water proofing layer in water tank etc. (No Departmental Cement is required)
165
42405
257
Cement concrete flooring with high performance non-metallic floor hardener containing specially graded non-metallic hard wearing natural aggregates imparting floor hardness in the range of mohr scale 8-9 & capable of achieving 28 days compressive strength of 25 MPa with air content less than 3% applied as a dry shake @ 5Kg/sgm sprinkled to provide durable, non-slip monolithic floor for application of the topping over freshly laid concrete with under layer of 40 mm. thick cement concrete (1:2:4) (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per specification of the manufacturer & as per direction of Engineer-in-Charge. [Note: Floor hardener is applied as dry shake using a power trowel when the floor concrete has stiffened sufficiently and bleed of water should not be visible on the top of the floor while the application started]
165
104940
636
Supply of Recron 3S @ 125 gm. / one bag of cement for concreting work (product of Reliance Industries).
45
2475
55
The reconstructed Structural Foot Bridge/pathway and structural members of old concrete jetty shall be cleaned prior to apply paints. The pontoon bottom & side hull shall be painted with 2-coats Tuffkote Red Oxide Zinc Chromate Primer(marine quality), final 2 coat BIPIGARD / EPIGARD (marine quality) to be painted as per painting schedule under instruction & satisfaction of Engineer-in-Charge.
900
625500
695
Hiring of Spare pontoon under instruction & satisfaction of Engineer-in-Charge.
1
150000
150000
Making arrangements for movable scaffolding with existing steel pathway in proper position, line, level, alignment and scaffolding arrangement with M.S. structural members for crop renewal and priming painting works considering all safety and security measures and dismantling the same after completion of work. The rate shall be inclusive all complete in all respect with all materials, labour, tools & plants, lead and lift. This item pertains to repairing of pathway by contractor's own cranes / derricks staging, machineries, plants & equipment etc., wherever required to complete the job, as per approved drawing as directed by Engineer-in-charge.
50
178000
3560
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements