West Bengal Surface Transport Corporation Limited Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
West Bengal Surface Transport Corporation Limited Tender
Civil And Construction
Eprocure
Opening Date13 Nov 2024
Closing Date30 Nov 2024
Tender Amount₹ 36,25,113
Costs
EMD
₹ 72,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WBSTC_769163_1Bid Award Id
ViewTender No
WBSTC/CE/MARINE/NIT-20e/24-25Tender Authority
West Bengal Surface Transport Corporation Limited ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NIT TECHNICAL FOR INSTALLATION OF 07 PONTOON AT LOT - 8 AND KACHUBERIA
BOQ Items
... More
Hire charges for below mentioned items from 15th December – 2024 to 25th January – 2025 i.e. for 42 days. for shore side mooring of 07 Nos. semi permanent Jetties.
-
-
-
... More
A) Wire Rope (Not less than 30mm dia.) - For Lot – 8 & Kachuberia – 4480 m
4480
-
-
... More
B) Wire Rope (25mm – 30mm dia.) – For Lot – 8 & Kachuberia –210 m.
210
-
-
... More
C) Wire clamp – For Lot – 8 & Kachuberia – 234 Nos.
234
-
-
... More
D) ‘D’ Shackle – For Lot – 8 & Kachuberia – 137 Nos.
137
-
-
... More
Hire charges for 01 (one) complete gas cutting section 01 (one) completed diesel driven electric are welding set alongwith gas cutter and welder for the entire period.
1
-
-
... More
Labors charge for watch keeping and maintenance of all the 07 jetties during the entire Mela period i.e. from 10.01.25 to 25.01.25
15
-
-
... More
Hire charges of following mooring items of one jetty i.e. Kachuberia Jtty -2 for another additional 20days from 26th January 2025 to 15th February 2025 up to Maghi Purnima Special operation.
-
-
-
... More
Wire rope (not less than 30mm dia.)
640
-
-
... More
Wire rope (25mm-30mm)
30
-
-
... More
Wire clamp
33
-
-
... More
‘D’ Shackle
19
-
-
... More
Labour charges for watch keeping and maintenance of one Jetty i.e. Kachuberia Jetty -2 during the entire additional period i.e. 20days.
20
-
-
... More
Transportation cost for mobilization of manpower ,tools and tackles for lifting of anchor, anchor chain and remove of pontoon from the Kachuberia Jetty No-2 after Maghi Purnima special ferry operation.
1
-
-
... More
Hire charges of following mooring items of one jetty i.e. Lot-8 Jetty -2 for another additional 74days from 26th January 2025 to 10th April 2025 up to completion of repairing of Lot-8 Jetty No.1.
-
-
-
... More
Wire rope (not less than 30mm dia.)
640
-
-
... More
Wire rope (25mm-30mm)
30
-
-
... More
Wire clamp
33
-
-
... More
‘D’ Shackle
19
-
-
... More
Labour charges for watch keeping and maintenance of one Jetty i.e. Lot-8 Jetty -2 during the entire additional period i.e. 74days.
74
-
-
... More
Transportation cost for mobilization of manpower ,tools and tackles for lifting of anchor, anchor chain and remove of pontoon from the Lot-8 Jetty -2
1
-
-
... More
Unscrambling and re-arranging the necessary mooring materials i.e. chains for these pontoon after being loaded and unloaded as per requirement on the pontoons for Mela purpose.
48
-
-
... More
Unscrambling and re-arranging the necessary mooring materials i.e. Anchor for these pontoon after being loaded and unloaded as per requirement on the pontoons for Mela purpose.
26
-
-
... More
Charges for Supply of Rail (105lb) (used but good quality) for Shore mooring at Lot – 8 & Kachuberia (08 nos. at Lot – 8 & 10nos. at Kachuberia – 6 – 6.5 Mtr. each Rail Pile) including transportation, loading & unloading etc. at site. Total Length = 117m = 6.071 MT
6.07
-
-
... More
Charges for Driving of Rail Piles for Shore mooring at Lot – 8 & Kachuberia (Total length = 117.00m)
117
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements