West Bengal State Marketing Board Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

West Bengal State Marketing Board - WBSMB Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date25 Mar 2025
Closing Date19 Apr 2025
Tender Amount₹ 2,83,897 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand

27.29

324

8842.93

... More
Cement concrete with graded stone balast(30mm size)excluding shuttering a)6:3:1 proportion in ground floor & foundation

2.83

4703

13285.98

... More
Ordinary Cement Concrete M-20(mix 3:1.5:1) with graded stone chips(20mm down) excluding shuttering and re-inforcement if any in ground floor as per IS 456-2000 (a) Pakur variety/Chandil variety

3.68

5603

20641.45

... More
Brick work with 1st class brick in C.M (4:1) a) In foundation and plinth

3.46

4767

16505.74

... More
b) In superstructure ground floor

3.71

4990

18525.38

... More
Hire and Labour charges for shuttering with centering and necessary staging pto 4m using approved thickness with required bracing for concrete slabs,beams,columns,lintels curvs or straight including fitting,fixing and striking out after completion of works(upto roof of ground floor) (When the height of a particular floor is more than 4m the equivalent floor height shall be taken as 4m and extra for works beyond the initial 4m ht shall be allowed under 12(e) for every 4m or part thereof (a)25mm to 30mm thick wooden shuttering as per decision & direction of Engineer-in-charge

37.13

351

13032.63

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars,stirrups,binders etc.including supply of rods,initial straightening and removal of loose rust(if necessary),cutting to requisite length,hooking and bending to correct shape,placing in proper position and binding with 16 gauge black annealed wire at every inter-section,complete as per drawing and direction (a) For work in foundation,basement and upto roof of ground floor/upto4m (i)Tor steel/Mild steel (a) for ground floor

0.43

54385

23592.21

... More
Artificial stone in floor,dado staircase etc with cement concrete(4:2:1) with stone chips,laid in panels as directed with topping made with ordinary or white cement(as necessary) and marble dust in proportion(2:1) including smooth finishing and rounding off corners and including application of cement slurry before flooring works,using cement@1.75kg/sqm.all complete including all materials and labour In ground floor 3mm thick topping(High polishing grinding on this item is not permitted)with ordinary cement (ii)35mm thick(ground floor)

12.6

314

3956.4

... More
Plaster(to wall,floor,ceiling etc) with sand &cement mortar including rounding off or chamferring corners as directed and raking out joints or rougening of concrete surface,including throating,nosing and drip course where necessary(first floor) (i) With 6:1 cement mortar (b) 20mm thick plaster(room inside)

59.85

152

9097.2

... More
ii) With 4:1 cement plaster 10 mm thick with cement mortar (ceiling)i) Ground Floor

41.03

121

4964.63

... More
15 mm. thick plaster (ii) With 4:1 cement mortar (b) 15 mm. thick plaster(External)

41.4

134

5547.6

... More
125 mm thick brick work with 1st class bricks in cement mortar(4:1) in ground floor

13.35

698

9318.3

... More
Neat cement punning about 1.5mm th wall,dado,window,ceiling,floor ,drain etc

59.1

33

1950.3

... More
Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately) c) 40mm X 6mm, 125mm Length

26

22

572

... More
Applying Exterior/Interior grade Acrylic primer of approved quality and brand on plasterd or concrete surface oild or new surface to receive decorative texture or smooth finish acrylic exterior emultion paint including scraping the same thoroughly (plastered or concrete surface) as per manufacturer’s specification. In ground floor. Two coats Exterior grade( SAME AS PLASTER)

59.85

45

2699.24

... More
Interior Grade(SAME AS PLASTER)

82.43

48

3997.86

... More
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification. (iii) Two coats. Exterior grade( SAME AS PLASTER)

59.85

67

4009.95

... More
Interior Grade(SAME AS PLASTER)

82.43

62

5110.66

... More
M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.

2.62

9888

25867.01

... More
Supplying , fitting & fixing Zn -Al alloy (55% Al & 45 % Zn) coated ( followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc.complete with 150 mm, end lap & one corrugation minimum side lap.(Payment to be made on area of finished work) (i) In Roof:-a) With 0.90 mm thick sheet

14

896

12544

... More
Supply,fitting & Corrugated ZincAluminium sheet ridging fitted with self tapping screws, EPDM washers etc complete.(Minimum 225mm end lapping). (A) 300 mm lapping each way (a) With 0.71 mm sheet

3.5

520

1820

... More
Holding down bolt with nut including 100x100x6mm plate washer at bottom fitted complete and packing the hoie with cement concrete as directed. 20mm dia bolt and 450mm long.

16

236

3776

... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m

0.3

72316

21694.8

... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smooth ening surfaces by sand papering etc.

28.35

31

878.85

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary . On Steel surface With super gloss (hi-gloss) - Two coats (with any shade except white)

28.35

79

2239.65

... More
Add GST @ 18%

18

238208

42877.44

... More
Add Labour Welafare Cess @ 1%

1

281086

2810.86



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.