West Bengal State Fishermens Cooperative Federation Limited Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

West Bengal State Fishermens Cooperative Federation Limited - BENFISH Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date27 Feb 2023
Closing Date22 Mar 2023
Tender Amount₹ 4,77,84,387 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(b) For each additional Depth of 150mm and part thereof.

4669.05

266135

57

... More
Providing and laying Sand Blanket with medium sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction including lighting, guarding, barricading and making 1.0 m wide earthen bundh on both the sides, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. (The payment is to be made on the basis of the finished compacted volume.)

3987.5

6536190

1639.17

... More
Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).

1210

2475938

2046.23

... More
Construction of Roller Compacted Concrete Pavement (RCCP) with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm with minimum aggregate cement ratio of 5:1 mm and with minimum cement content of 310 kg per cum, aggregate gradation to be as per Table 602.2 after blending, mixing in concrete mixer at optimum moisture content, transporting to site, laying with wheel barrows or steel pans or with mechanical paver, compacting with 80-100 kN smooth wheel, tandem vibratory roller, to achieve, the designed flexural strength, finishing and curing as per drawings and Technical Specification Clause 1502 for Rural Roads of MORD. a) Pakur Variety

1512.5

12676958

8381.46

... More
R.C.C side drain (1200 m) at both sides and cross drain (5.50 m) Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per TechnicalSpecifications Clause 202 for Rural Roads of MORD. (I) By Manual Means b) Cement Concrete L.S

250

99750

399

... More
Earth work in excavation of foundation trenches or drain in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing. Spreading or stacking the spoils within a lead of 75 m. as directed.The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom. Bailing outwater as required complete. (a) Depth of excavation not exceeding 1.500 mm.

1684.65

200928

11927

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

2316.6

836292

361

... More
Ordinary Cement concrete (M20) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes . a) Pakur Variety

789.58

4874937

6174.09

... More
Hire and labour charges for shuttering with centreing and necessary staging upto 4 m.using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams,columns, lintels curved or straight including fitting fixing and strking out after completion of works (upto roof of ground floor) a) 25 mm. To 30 mm. Thick wooden shuttering as per decision & direction of Engineer-In-Charge.

6065.13

2031818

335

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel I. SAIL/ TATA/RINL

61.98

3697804

59661.25

... More
One nos Cow catcher, supply & installation as per direction of Engineer-in-charge complete

1

50000

50000

... More
'Internal heavey vehicle road of rigid (Block) pavement , 324 m x 3.0 m (wide) along with R.C drains at both sides at Chalk Garia Fish Processing Plant' Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specifications Clause 202 for Rural Roads of MORD. (I) By Manual Means a) Bituminous Courses

24.3

15187

625

... More
b) Granular Courses

194.4

88063

453

... More
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. a) Depth up to 150 mm.

218.9

3152

14.4

... More
(b) For each additional Depth of 150mm and part thereof.

899.1

51248

57

... More
Providing and laying Sand Blanket with medium sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction including lighting, guarding, barricading and making 1.0 m wide earthen bundh on both the sides, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. (The payment is to be made on the basis of the finished compacted volume.)

729

1194954

1639.17

... More
Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) Grading – V (Separation layer, 100 thk)

103.68

235514

2271.55

... More
(ii) Grading – II (Drainage layer, 150 thk)

145.8

298340

2046.23

... More
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and ubricants, including incidental costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).

243

614291

2527.95

... More
Supplying and laying in the specified pattern of Interlocking Concrete Block Pavement (ICBP) with concrete blocks (with concrete grade as specified as per Table I of IS:15658 - 2006) manufactured in steel mould clamped to a vibrating table by hudraulic pressure (as per cl. no 6.30 of IRC:SP-63 ), from BIS license manufacturer , with spacer nib (small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving blocks, as per Cl. no. 3.26 of IS:15658) and of specified size and shape with aspect ratio (The ratio of length to thickness of a paver block as per Cl. no. 3.3 , IS:15658) as per Table - 2 of IS:15658 with flesural strength/breaking load as per Annesure as per Annexure G of 15658, on the prepared base course of specified CBR as per Table 1 of IRC:SP-63 - 2018 or else as mentioned in the design and drawing with a cushion of compacted bedding sand of 25-35 mm thick (Grading of bedding sand as per Cl.6.5.1 of IRC:SP-63) and filling up the gaps in between paver blocks with joint filling sand will be as per Cl.6.5.2 , IRC:SP-63) and completing the edges with cut blocks as per Cl. no. 8.7 of IRC:SP-63 -2018 with proper confinement of bedding and joint filling sand , compaction , levelling and filling up of the edge gap . 120 mm thick Grey

972

1613520

1660

... More
R.C.C side drain (Total 648 m) at both sides and cross drain (4.0 m) Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. (I) By Manual Means b) Cement Concrete L.S

250

99750

399

... More
Earth work in excavation of foundation trenches or drain in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing. Spreading or stacking the spoils within a lead of 75 m. as directed.The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom. Bailing outwater as required complete. (a) Depth of excavation not exceeding 1.500 mm.

493.29

58834

11927

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

685.2

247357

361

... More
Ordinary Cement concrete (M20) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes . a) Pakur Variety

233.9

1444119

6174.09

... More
Hire and labour charges for shuttering with centreing and necessary staging upto 4 m.using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams,columns, lintels curved or straight including fitting fixing and strking out after completion of works (upto roof of ground floor) a) 25 mm. To 30 mm. Thick wooden shuttering as per decision & direction of Engineer-In-Charge.

1793

600655

335

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel I. SAIL/ TATA/RINL

18.36

1095380

59661.25

... More
Internal heavey vehicle road of rigid pavement , 208 m x 4.0 m (wide) along with R.C drains at both sides at Chalk Garia Fish Processing Plant' . Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specifications Clause 202 for Rural Roads of MORD. (I) By Manual Means a) Bituminous Courses

18.72

11700

625

... More
b) Granular Courses

149.76

67841

453

... More
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. a) Depth up to 150 mm.

187.2

2695

14.4

... More
(b) For each additional Depth of 150mm and part thereof.

769.6

43867

57

... More
Providing and laying Sand Blanket with medium sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction including lighting, guarding, barricading and making 1.0 m wide earthen bundh on both the sides, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. (The payment is to be made on the basis of the finished compacted volume.)

624

1022842

1639.17

... More
Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) Grading – II

166.4

340492

2046.23

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with cement content as per IRC: 15-2011, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batch mix plant / RMC and appropriate weigh batcher using approved mix design (as per IRC:44 2008), laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing, spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, polysulphide sealant, dowel bars, near approaches to bridge/ culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 for Rural Roads of MORD. (ii) With RMC

228.8

1839428

8039.46

... More
R.C.C side drain (Total 416 m) at both sides and cross drain (5.0 m) Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. (I) By Manual Means b) Cement Concrete L.S

250

99750

399

... More
Earth work in excavation of foundation trenches or drain in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing. Spreading or stacking the spoils within a lead of 75 m. as directed.The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom. Bailing outwater as required complete. (a) Depth of excavation not exceeding 1.500 mm.

316.68

37770

11927

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

442.79

159847

361

... More
Ordinary Cement concrete (M20) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes . a) Pakur Variety

151.52

935498

6174.09

... More
Hire and labour charges for shuttering with centreing and necessary staging upto 4 m.using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams,columns, lintels curved or straight including fitting fixing and strking out after completion of works (upto roof of ground floor) a) 25 mm. To 30 mm. Thick wooden shuttering as per decision & direction of Engineer-In-Charge.

1157.75

387846

335

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel I. SAIL/ TATA/RINL

11.89

709372

59661.25

... More
AMOUNTS ARE EXCLUDING GST (18%)

1

1

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.